share_log

Pure Energy Minerals Grants Stock Options

Pure Energy Minerals Grants Stock Options

Pure Energy Minerals授予股票期權
newsfile ·  2022/12/01 01:25

Vancouver, British Columbia--(Newsfile Corp. - November 30, 2022) - Pure Energy Minerals Limited (TSXV: PE) (OTCQB: PEMIF) (the "Company" or "Pure Energy") announces, subject to regulatory approval, that pursuant to an annual performance and compensation review, it has granted a total of 880,000 stock options (the "Options") to directors, officers and consultants of the Company to purchase common shares of the Company in accordance with its approved Stock Option Plan. All of the Options vest quarterly in four equal tranches, with the first such vesting occurring upon issuance of the Options, and are issued at an exercise price of C$0.53 per share with expiry of five years from the date of issuance.

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年11月30日)-純能礦業有限公司(多倫多證券交易所股票代碼:PE)(場外交易代碼:PEMIF)(“公司“或”純淨能量“)宣佈,根據年度業績及薪酬檢討,本公司已向本公司董事、高級管理人員及顧問授予合共880,000份購股權(”購股權“),以便根據其批准的購股權計劃購買本公司普通股。所有購股權每季分四個等額部分歸屬,首次歸屬於購股權發行時發生,並以每股0.53加元的行使價發行,自發行之日起計滿五年。

About Pure Energy

關於Pure Energy

Pure Energy Minerals is a lithium resource developer that is driven to become a low-cost supplier for the growing lithium battery industry. Pure Energy has consolidated a pre-eminent land position at its Clayton Valley Project in the Clayton Valley of central Nevada for the exploration and development of lithium resources, comprising 950 claims over 23,360 acres (9,450 hectares), representing the largest mineral land holdings in the valley. Pure Energy's Clayton Valley Project adjoins and surrounds on three sides the Silver Peak lithium brine mine operated by Albemarle Corporation.

Pure Energy Minerals是一家鋰資源開發商,致力於成為不斷增長的鋰電池行業的低成本供應商。Pure Energy鞏固了其位於內華達州中部克萊頓山谷的克萊頓山谷項目在鋰資源勘探和開發方面的卓越土地地位,包括超過23,360英畝(9,450公頃)的950項主張,這是該山谷最大的礦產土地持有量。Pure Energy的克萊頓山谷項目三面毗鄰Albemarle公司運營的Silver Peak鋰滷水礦,並將其包圍。

Pure Energy's strategic partner, Schlumberger Technologies Corporation ("SLB"), is the operator of the Clayton Valley Project. In May of 2019, Pure Energy and SLB signed an Earn-In agreement over the CV Project which requires significant investment by SLB at the Project, to include the design and construction of a pilot plant capable of processing lithium-bearing brines for high-quality lithium hydroxide monohydrate ("lithium hydroxide" or "LiOH∙H2O") and/or lithium carbonate products at a specified rate. SLB plans to utilize both in-house and commercially available technology in the design of the CV pilot plant. SLB's costs, technical parameters and ultimate technology are anticipated to differ from the published PEA. For further details regarding SLB's participation, please refer to Pure Energy's Annual General and Special Meeting Management Information Circular dated April 4, 2019, available on SEDAR.com.

純能源的戰略合作伙伴斯倫貝謝技術公司(“SLB”)是克萊頓山谷項目的運營商。2019年5月,Pure Energy和SLB簽署了一份關於CV項目的入股協議,該項目需要SLB在該項目上進行大量投資,包括設計和建設一個能夠以指定速度處理高質量氫氧化鋰一水合物(“氫氧化鋰”或“LiOH∙H2O”)和/或碳酸鋰產品的含鋰滷水的試點工廠。SLB計劃在CV試點工廠的設計中同時利用內部和商業可用的技術。SLB的成本、技術參數和最終技術預計將與公佈的PEA有所不同。有關SLB參與的更多詳情,請參閲SEDAR.com上日期為2019年4月4日的Pure Energy年度股東大會和特別會議管理信息通告。

On behalf of the Board of Directors,

我謹代表董事會:

"Mary L. Little"
Director, Pure Energy Minerals Limited

《瑪麗·L·利特爾》
董事,純能礦業有限公司

CONTACT:

聯繫方式:

Pure Energy Minerals Limited ()
Email: info@pureenergyminerals.com
Telephone - 604 608 6611

Pure Energy Minerals Limited()
電子郵件:info@pureenergyminals.com
電話:604 608 6611

Cautionary Statements and Forward-Looking Information

警告性聲明和前瞻性信息

The information in this news release contains forward-looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward-looking statements. Factors that could cause such differences include: changes in world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and changes to regulations affecting the mining industry. Forward-looking statements in this release may include future exploration and development on the Clayton Valley Project. Although we believe the expectations reflected in our forward-looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.

本新聞稿中的信息包含前瞻性陳述,這些陳述會受到許多已知和未知的風險、不確定性和其他因素的影響,這些風險、不確定性和其他因素可能會導致實際結果與我們的前瞻性陳述中預期的大不相同。可能導致這種差異的因素包括:世界大宗商品市場、股票市場、與採礦業相關的材料的成本和供應的變化、政府的變化以及影響採礦業的法規的變化。本新聞稿中的前瞻性陳述可能包括克萊頓山谷項目的未來勘探和開發。儘管我們相信我們的前瞻性陳述中反映的預期是合理的,但結果可能會有所不同,我們不能保證未來的結果、活動水平、業績或成就。

The Company does not undertake to update any forward-looking information, except as required by applicable laws.

除適用法律要求外,公司不承諾更新任何前瞻性信息。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES.

不得向美國新聞通訊社分發,或直接或間接、全部或部分、在美國或進入美國境內發佈、出版、分發或傳播。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論