share_log

Black Mountain Gold USA Corp. Announces BLM Approval of Exploration Plan of Operation at Mohave Project

Black Mountain Gold USA Corp. Announces BLM Approval of Exploration Plan of Operation at Mohave Project

美國黑山黃金公司宣佈BLM批准莫哈韋項目的勘探運營計劃
newsfile ·  2022/11/14 21:00

Vancouver, British Columbia--(Newsfile Corp. - November 14, 2022) - Black Mountain Gold USA Corp. (TSXV: BMG) ("BMG" or the "Company") is pleased to announce that it has received approval from the Bureau of Land Management ("BLM") for its Exploration Plan of Operations ("EPO") at its Mohave Gold Project in Arizona. BLM informed the Company Nov. 4 that the Final Environmental Assessment, Decision Record, and Finding of No Significant Impacts documents are finalized and posted to the BLM project webpage at: .

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年11月14日)-美國黑山黃金公司(多倫多證券交易所股票代碼:BMG)(“BMG”或“公司”)我們很高興地宣佈,該公司在亞利桑那州莫哈韋金礦項目的勘探作業計劃(EPO)已獲得土地管理局(“BLM”)的批准。BLM於11月4日通知公司,最終的環境評估、決策記錄和未發現重大影響的文件已定稿,併發布到BLM項目的網頁上:

Graham Harris, CEO and Director, commented: "The granting of approval for the Company's Environmental Impact Assessment ("EIA") and revised EPO for Mohave is a significant milestone for the project. The EPO is now permitted for up to 600 drill sites and associated roads and infrastructure and enhances the attractiveness of the Mohave Project as we continue to review strategic options to advance the project."

董事首席執行官格雷厄姆·哈里斯評論説:“公司環境影響評估(”環評“)和莫哈雷修訂後的歐洲專利法獲得批准是該項目的一個重要里程碑。隨着我們繼續評估推進項目的戰略選擇,環境保護令現在被允許在多達600個鑽探點以及相關道路和基礎設施中使用,從而增強了莫哈伊項目的吸引力。”

The EPO includes 600 drill sites with sumps situated at the Klondyke, Apex, Jim and Jerry, Scout, and Golden Door prospects in the north and the Dixie Queen prospect in the south as well as up to two water monitoring wells. Initiation of exploration activities is contingent on the Company providing a financial guarantee for the reclamation costs of 206 drill sites which is approximately $360,000 USD.

EPO包括600個鑽井地點,這些地點的水池位於克朗代克、Apex、吉姆和Jerry、童子軍和北部的Golden Door勘探區和南部的Dixie Queen勘探區,以及最多兩口水質監測井。勘探活動的啟動取決於公司為206個鑽探點的開墾成本提供財務擔保,這筆費用約為360,000美元。

CORRECTION TO NOVEMBER 2, 2022 NEWS RELEASE

更正至2022年11月2日新聞稿

The Company wishes to correct an error in its news release dated November 2, 2022. In that news release, it was stated that 300,000 shares of the Company were to be issued upon execution of the Binding MOU concerning the Banio Potash Project. This was incorrect: no shares were issuable on execution of the Binding MOU. In addition, the total of up to 6,500,000 shares that could be issued in connection with the acquisition of the Banio Potash Project was incorrect. The correct number is 300,000 less or 6,200,000 shares in total.

本公司希望糾正其日期為2022年11月2日的新聞稿中的錯誤。在該新聞稿中,聲明在簽署關於Banio Potash項目的具有約束力的諒解備忘錄後,將發行300,000股公司股票。這是不正確的:在執行具有約束力的諒解備忘錄時,沒有股票可以發行。此外,與收購Banio Potash項目相關的總共可能發行的多達650萬股股票是不正確的。正確的數字是減去300,000股或總共6,200,000股。

This news release has been reviewed by Peter J. MacLean, Ph.D., P. Geo, Director of the Company and a Qualified Person as that term is defined in National Instrument 43-101.

本新聞稿已由公司的Peter J.MacLean,Ph.D.,P.Geo,董事和國家儀器43-101中定義的一名合格人士審閲。

To find out more about Black Mountain Gold USA Corp. please contact Investor Relations at (604) 662-8184 or email info@blackmountaingoldusa.com.

欲瞭解更多有關Black Mountain Gold USA Corp.的信息,請聯繫投資者關係部,電話:(604)662-8184,電子郵件:info@Blackmount taingoldusa.com。

BLACK MOUNTAIN GOLD USA CORP.

美國黑山黃金公司。

"Graham Harris"

《格雷厄姆·哈里斯》

CEO, Director

董事首席執行官

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

This news release may contain certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target, "plan", "forecast", "may", "schedule" and similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to future prices of commodities, accuracy of mineral or resource exploration activity, reserves or resources, regulatory or government requirements or approvals including approvals of title and mining rights or licenses, the reliability of third party information, continued access to mineral properties or infrastructure, changes in laws, rules and regulations in Arizona which may impact upon the Company or its properties or the commercial exploitation of those properties, currency risks including the exchange rate of USD$ for Cdn$, fluctuations in the market for gold/silver, changes in exploration costs and government royalties, export policies or taxes in Arizona and other factors or information. The Company's current plans, expectations and intentions with respect to development of its business and of the Mohave Gold Project may be impacted by economic uncertainties arising out of Covid-19 pandemic or by the impact of current financial and other market conditions on its ability to secure further financing or funding of the Mohave Gold Project. Such statements represent the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affections such statements and information other than as required by applicable laws, rules and regulations.

本新聞稿可能包含1995年美國私人證券訴訟改革法和適用的加拿大證券法所指的某些“前瞻性陳述”。在本新聞稿中使用的“預期”、“相信”、“估計”、“預期”、“目標”、“計劃”、“預測”、“可能”、“計劃”以及類似的詞語或表述均為前瞻性陳述或信息。這些前瞻性陳述或信息可能涉及大宗商品的未來價格、礦產或資源勘探活動、儲量或資源的準確性、監管或政府要求或批准(包括所有權和採礦權或許可證的批准)、第三方信息的可靠性、對礦產或基礎設施的持續訪問、亞利桑那州可能影響公司或其財產或這些財產的商業開發的法律、規則和法規的變化、貨幣風險(包括美元兑加元的匯率)、黃金/白銀市場的波動、勘探成本和政府特許權使用費的變化,亞利桑那州的出口政策或税收以及其他因素或信息。該公司目前關於其業務和莫哈韋黃金項目的發展計劃、預期和意圖可能會受到新冠肺炎疫情帶來的經濟不確定性的影響,或者受到當前金融和其他市場狀況對其獲得莫哈伊黃金項目進一步融資或資金的能力的影響的影響。這些陳述代表了公司目前對未來事件的看法,必須基於一些假設和估計,儘管公司認為這些假設和估計是合理的,但這些假設和估計本身就會受到重大的商業、經濟、競爭、政治和社會風險、或有和不確定因素的影響。許多因素,既有已知的,也有未知的, 可能導致結果、業績或成就與此類前瞻性陳述明示或暗示的結果、業績或成就大相徑庭。除適用法律、規則和法規要求外,公司不打算也不承擔任何義務更新這些前瞻性陳述或信息,以反映假設的變化或環境的變化或任何其他事件影響此類陳述和信息。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論