share_log

Gold Springs Resource Drilled Into a New Gold Mineralization Area at North Jumbo

Gold Springs Resource Drilled Into a New Gold Mineralization Area at North Jumbo

北君博金礦化新區探明金泉資源
Accesswire ·  2022/09/19 18:06

VANCOUVER, BC / ACCESSWIRE / September 19, 2022 / Gold Springs Resource Corp. (TSX:GRC)(OTCQB:GRCAF) (the "Company" or "GRC"), has received assays from the first 2022 drill holes at North Jumbo confirming the possibility for a significant southward extension of the North Jumbo Resource within the Gold Springs project located in USA, on the border of Nevada and Utah.

温哥華,卑詩省/ACCESSWIRE/2022年9月19日/金泉資源公司多倫多證券交易所股票代碼:GRC)(OTCQB:GRCAF)(以下簡稱“公司”或“GRC”)已收到North Jumbo首批2022個鑽孔的分析報告,證實了North Jumbo資源在位於美國內華達州和猶他州交界處的Gold Springs項目內向南延伸的可能性。

Highlights include:

亮點包括:

  • 1.20 g/t gold equivalent over 9.1 meters and
    0.67 g/t gold equivalent over 36.6 meters and
    1.18 g/t gold equivalent over 6.1 meters in hole J-22-001
  • 0.57 g/t gold equivalent over 41.2 meters and
    1.88 g/t gold equivalent over 6.1 meters in hole J-22-004
  • 1.87 g/t gold equivalent over 29.0 meters including
    3.73 g/t gold equivalent over 9.2 meters in hole J-22-005
  • 0.94 g/t gold equivalent over 9.2 meters in hole J-22-006
  • 0.56 g/t gold equivalent over 7.7 meters and
    1.14 g/t gold equivalent over 3.1 meters in hole J-22-007
  • 0.52 g/t gold equivalent over 19.8 meters and
    1.31 g/t gold equivalent over 7.6 meters in hole J-22-008
  • 超過9.1米的1.20克/噸黃金當量及
    36.6米以上0.67克/噸黃金當量及
    J-22-001井6.1米以上1.18克/噸黃金當量
  • 41.2米以上0.57克/噸黃金當量和
    J-22-004孔6.1米以上1.88克/噸黃金當量
  • 29.0米以上1.87克/噸黃金當量,包括
    J-22-005孔9.2米以上3.73克/噸黃金當量
  • J-22-006孔9.2米以上0.94克/噸黃金當量
  • 7.7米以上0.56克/噸黃金當量及
    J-22-007孔3.1米以上1.14克/噸黃金當量
  • 19.8米以上0.52克/噸黃金當量和
    J-22-008孔7.6米以上1.31克/噸黃金當量

Gold equivalent based on US$1,800/oz gold, US$25/oz silver and 50% for silver recovery.

黃金當量以1,800美元/盎司黃金、25美元/盎司白銀和50%的白銀回收計算。

Randall Moore, Executive Vice President of Exploration, stated: "We are very excited about the results of the first holes completed in 2022 at North Jumbo as they confirm:

蘭德爾·摩爾,探索部常務副總裁總裁,述明:我們對2022年在北巨型油田完成的第一批鑽孔的結果感到非常興奮,因為他們證實了:

  1. The discovery of a new gold mineralization area extending 200 meters south of our North Jumbo Resource (holes J-22-004 & J-22-005) in a new structural block that was never drilled before.
  2. The extension of the North Jumbo Resource in a parallel western mineral block (J-22-001, J-22-006, and J-22-007).
  3. The extension of gold mineralization in the southern portion of the North Jumbo Resource as our model predicted (Hole J-22-008).
  1. 一個新的金礦成礦區的發現在我們的North Jumbo資源(J-22-004和J-22-005孔)以南200米處延伸到一個以前從未鑽探過的新結構區塊中。
  2. 北方巨型資源的延伸在平行的西部礦塊(J-22-001、J-22-006和J-22-007)。
  3. 金礦化的延伸在北方巨型資源的南部,正如我們的模型預測的那樣(J-22-008號孔)。

All these holes have thick sections of gold mineralization and higher-grade intervals than our existing resource.

所有這些洞都有較厚的金礦化段和比我們現有資源更高品位的層序。

The 2022 drill program is advancing as we hoped, and our resource models are being confirmed and refined by all these positive drill results:

2022年的演習計劃正在如我們所希望的那樣推進,我們的資源模型正在被所有這些積極的演習結果所證實和完善:

  • At South Jumbo, we have identified a significant extension of that system 50 meters to the north with hole E-22-020 returning 0.74 g/t gold equivalent over 26.0 meters(see our press release August 12, 2022). We have now completed two more holes and a third one is in progress with the objective of extending the resource 200 meters to the north.
  • At North Jumbo, we drilled into a new structural block extending gold mineralization 200 meters south of the North Jumbo Resource with hole J-22-005 returning 1.87 g/t gold equivalent over 29 meters including 3.73 g/t over 9.2 meters, and with hole J-22-004 returning 0.57 g/t gold equivalent over 41.2 meters and 1.88 g/t over 6.1 meters.
  • 在…南巨無霸,我們已經確定意義重大的延期向北50米處有E-22-020洞返回0.74克/噸黃金 等價物完畢26.0米(見我們2022年8月12日的新聞稿)。我們現在已經完成了另外兩個洞,第三個洞正在進行中,目標是擴展資源200 往北走幾米。
  • 在North Jumbo,我們鑽研了一下一種新的結構塊J-22-005返回孔將金礦化延伸至北巨型金礦資源以南200米處1.87克/噸黃金當量完畢29米包括3.73 克/噸完畢9.2 計價器,且J-22-004孔返回0.57克/噸黃金當量完畢41.2米1.88克/噸完畢6.1米.

Within the 5 km Jumbo Trend, we are currently constructing new drill pads to follow up these positive results, with the ambition of continuing to extend the gold mineralization from the North Jumbo Resource (1.8 km long) to the south and the South Jumbo Resource (1.3 km long) to the north."

在5公里的Jumbo趨勢範圍內,我們目前正在建設新的鑽臺,以跟進這些積極的成果,我們的雄心是繼續將金礦從北Jumbo資源(長1.8公里)向南延伸,將南Jumbo資源(長1.3公里)向北延伸。“

2022 Drilling Program

2022年鑽井計劃

The Company has now completed 56 holes totaling 11,990 meters of the planned 21,000-meter program. Drilling has targeted the North and South Jumbo resources, the Charlie Ross target and the Snow target, which saw its first ever drilling. Drills will soon be moving to the Red Light target followed by the Horseshoe Extension.

該公司目前已經完成了計劃中的21,000米計劃中的56個洞,總計11,990米。鑽探的目標是北部和南部的Jumbo資源、查理·羅斯目標和Snow目標,這是其有史以來的第一次鑽探。演習將很快轉移到紅燈目標,然後是馬蹄形延長線。

Summary of drill intercepts

鑽探截獲摘要

Hole
Number

Target

From
Meters

To
Meters

Thickness
Meters

Gold
g/t

Silver
g/t

AuEq
g/t

J-22-0001

North Jumbo

4.6

13.7

9.1

1.17

4.52

1.20

and

41.1

77.7

36.6

0.61

8.7

0.67

and

99.1

103.6

4.5

0.31

4.8

0.34

and

115.8

121.4

6.1

1.10

11.8

1.18

J-22-002

North Jumbo

39.6

42.7

3.1

0.52

6.0

0.56

J-22-004

North Jumbo

73.2

76.2

3.0

0.89

25.7

1.07

and

211.8

253.0

41.2

0.53

5.5

0.57

including

222.5

228.6

6.1

1.80

11.5

1.88

J-22-005

North Jumbo

77.7

106.7

29.0

1.74

19.22

1.87

including

77.7

86.9

9.2

3.41

46.2

3.73

and

172.2

175.3

3.1

0.67

5.7

0.71

J-22-006

North Jumbo

53.3

62.5

9.2

0.93

1.93

0.93

J-22-007

North Jumbo

103.6

111.3

7.7

0.53

4.4

0.56

and

198.1

201.2

3.1

0.96

26.3

1.14

J-22-008

North Jumbo

22.9

42.7

19.8

0.45

10.6

0.52

and

140.2

147.8

7.6

1.25

8.2

1.31

J-22-010

North Jumbo

97.5

100.6

3.1

0.52

44.3

0.83

孔洞

目標

從…


厚度

黃金
克/噸

白銀
克/噸

AUEQ
克/噸

J-22-0001

北巨無霸

4.6

13.7

9.1

1.17

4.52

1.20

41.1

77.7

36.6

0.61

8.7

0.67

99.1

103.6

4.5

0.31

4.8

0.34

115.8

121.4

6.1

1.10

11.8

1.18

J-22-002

北巨無霸

39.6

42.7

3.1

0.52

6.0

0.56

J-22-004

北巨無霸

73.2

76.2

3.0

0.89

25.7

1.07

211.8

253.0

41.2

0.53

5.5

0.57

包括

222.5

228.6

6.1

1.80

11.5

1.88

J-22-005

北巨無霸

77.7

106.7

29.0

1.74

19.22

1.87

包括

77.7

86.9

9.2

3.41

46.2

3.73

172.2

175.3

3.1

0.67

5.7

0.71

J-22-006

北巨無霸

53.3

62.5

9.2

0.93

1.93

0.93

J-22-007

北巨無霸

103.6

111.3

7.7

0.53

4.4

0.56

198.1

201.2

3.1

0.96

26.3

1.14

J-22-008

北巨無霸

22.9

42.7

19.8

0.45

10.6

0.52

140.2

147.8

7.6

1.25

8.2

1.31

J-22-010

北巨無霸

97.5

100.6

3.1

0.52

44.3

0.83

True thickness is estimated to be 60-100% of reported length. Grams per tonne of gold and silver abbreviated as "Au g/t" and "Ag g/t" respectively.

真實厚度估計為報告長度的60%-100%。每噸黃金和白銀的克數分別縮寫為“AU g/t”和“Ag g/t”。

Drill Hole Table

鑽孔表

Hole ID

Target

Easting
UTM NAD 27

Northing

Elevation Meters

Azimuth

Inclination

TD (m)

J-22-001

North Jumbo

761034

4198261

2051

325

-65

219.5

J-22-002

North Jumbo

760988

4198261

2053

310

-65

170.7

J-22-003

North Jumbo

760972

4198380

2086

320

-50

146.3

J-22-004

North Jumbo

760976

4198167

2030

190

-45

274.3

J-22-005

North Jumbo

761012

4198219

2038

190

-45

198.1

J-22-006

North Jumbo

761036

4198303

2064

325

-55

158.5

J-22-007

North Jumbo

760979

4198368

2048

120

-45

219.5

J-22-008

North Jumbo

761185

4198322

1996

330

-60

225.6

J-22-009

North Jumbo

761193

4198673

2058

270

-60

115.8

J-22-010

North Jumbo

761186

4198701

2070

310

-60

176.8

孔ID

目標

向東
UTM NAD 27

北距

高程表

方位角

傾角

TD(M)

J-22-001

北巨無霸

761034

4198261

2051

325

-65

219.5

J-22-002

北巨無霸

760988

4198261

2053

310

-65

170.7

J-22-003

北巨無霸

760972

4198380

2086

320

-50

146.3

J-22-004

北巨無霸

760976

4198167

2030

190

-45

274.3

J-22-005

北巨無霸

761012

4198219

2038

190

-45

198.1

J-22-006

北巨無霸

761036

4198303

2064

325

-55

158.5

J-22-007

北巨無霸

760979

4198368

2048

120

-45

219.5

J-22-008

北巨無霸

761185

4198322

1996

330

-60

225.6

J-22-009

北巨無霸

761193

4198673

2058

270

-60

115.8

J-22-010

北巨無霸

761186

4198701

2070

310

-60

176.8

Qualified Person

有資格的人

Randall Moore, Executive Vice-President Exploration, Gold Springs Resource Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). He has approved the scientific or technical information in this release and has verified the data disclosed in this release for its geological reasonableness, checked all the inputs and verified the analytical data through an analysis of the blanks and standards submitted with the drill-chip samples.

金泉資源公司總裁探礦部執行副總裁蘭德爾·摩爾是本新聞稿的指定合格人士,符合國家儀器43-101礦產項目披露標準(“NI 43-101”)的含義。他批准了本新聞稿中的科學或技術信息,並核實了本新聞稿中披露的數據的地質合理性,檢查了所有輸入,並通過對隨鑽片樣品提交的空白和標準進行分析,驗證了分析數據。

Quality Assurance and Quality Control

質量保證和質量控制

Approximately 7 kg of RC chips were sent to the laboratory for each 1.52 meters drill interval. Standards and blanks are submitted into the sample stream at the rate of 15% for QA/QC purposes. In addition, the laboratory also includes duplicates of samples, standards and blanks. The results of these check assays are reviewed prior to the release of data. All RC sample assays are also reviewed for their geological context and checked against the drill logs.

每隔1.52米的鑽井間隔,大約有7公斤RC芯片被送到實驗室。出於質量保證/質量控制的目的,標準和空白以15%的比率提交到樣品流中。此外,實驗室還包括樣品、標準和空白的複製品。在數據發佈之前,對這些檢查分析的結果進行審查。還審查了所有RC樣品分析的地質背景,並對照鑽井日誌進行了核對。

Assay Method

化驗方法

Assays were performed in Reno, Nevada by ALS Geochemical, an ISO 9001:2000 certified and independent laboratory. Gold was analyzed by fire assay of a 30-gram sample with an AAS finish with samples assaying greater than 5 g/t re-assayed using a 30-gram sample and a gravity finish. Silver is analyzed by a four-acid leach ICP method.

化驗是在內華達州里諾由ALS地球化公司進行的,該公司是一家獲得ISO 9001:2000認證的獨立實驗室。用火焰分析法對30克重的樣品進行金的分析,用30克的樣品和重力塗層對大於5克/噸的樣品進行重新分析。銀的分析採用四酸浸出電感耦合等離子體法。

About Gold Springs Resource Corp.

關於金泉資源公司

Gold Springs Resource Corp. (TSX: GRC and OTCQB: GRCAF) is focused on the exploration and expansion of the gold and silver resources of its Gold Springs project located on the border of Nevada and Utah, USA. The project is situated in the prolific Great Basin of Western USA, one of the best mining jurisdictions in the world.

金泉資源公司(多倫多證券交易所股票代碼:GRC和場外交易市場代碼:GRCAF)專注於勘探和擴大其位於美國內華達州和猶他州交界處的金泉項目的金銀資源。該項目位於美國西部多產的大盆地,是世界上最好的採礦管轄區之一。

Gold Springs Resource Corp. Contact:

金泉資源公司聯繫人:

Antonio Canton, President and CEO
acanton@goldspringsresource.com

安東尼奧·坎頓、總裁和首席執行官
郵箱:acanton@goldspringsresource ce.com

Forward Looking Statements

前瞻性陳述

Certain statements contained herein constitute "forward-looking information" under applicable Canadian securities laws ("forward-looking statements"). Forward-looking statements look into the future and provide an opinion as to the effect of certain events and trends on the business. Forward-looking statements herein include statements related to the Company's goal of extending the gold mineralization from the 1.8 km long North Jumbo Resource towards the 1.3 km long South Jumbo Resource and may also include words such as "creating", "believe", "would", "continue", "will", "promising", "should", and similar expressions. These forward-looking statements are based on current expectations and entail various risks and uncertainties. Actual results may materially differ from expectations if known and unknown risks or uncertainties affect our business or if our estimates or assumptions prove inaccurate. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to, risks of the mineral exploration industry which may affect the advancement of the Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal prices, capital and operating costs, and the application of taxes; availability of sufficient financing to fund planned or further required work in a timely manner and on acceptable terms; availability of equipment and qualified personnel, failure of equipment or processes to operate as anticipated, changes in project parameters, including water requirements for operations, as plans continue to be refined; regulatory, environmental and other risks of the mining industry more fully described in the Company's Annual Information Form and continuous disclosure documents, which are available on SEDAR at . The assumptions made in developing the forward-looking statements include: the accuracy of current resource estimates and the interpretation of drill, metallurgical testing and other exploration results; the continuing support for mining by local governments in Nevada and Utah; the availability of equipment and qualified personnel to advance the Gold Springs project; execution of the Company's existing plans and further exploration and development programs for Gold Springs, which may change due to changes in the views of the Company or if new information arises which makes it prudent to change such plans or programs.Readers are cautioned not to place undue reliance on the forward-looking statements contained in this press release. Except as required by law, the Company assumes no obligation to update or revise any forward-looking statement, whether as a result of new information, future events or any other reason. Unless otherwise indicated, forward-looking statements in this press release describe the Company's expectations as of the date hereof.

根據適用的加拿大證券法,本文中包含的某些陳述構成“前瞻性信息”(“前瞻性陳述”)。前瞻性陳述展望未來,並就某些事件和趨勢對業務的影響提供意見。本文中的前瞻性表述包括與公司將金礦從長1.8公里的北巨型金礦資源擴展到1.3公里長的南巨型金礦資源的目標有關的表述,還可能包括諸如“創造”、“相信”、“將會”、“有希望”、“應該”等詞語以及類似的表述。這些前瞻性陳述是基於當前的預期,存在各種風險和不確定性。如果已知和未知的風險或不確定性影響我們的業務,或者如果我們的估計或假設被證明是不準確的,實際結果可能與預期大不相同。可能導致結果或事件與前瞻性陳述明示或暗示的當前預期大不相同的因素包括,但不限於,礦物勘探行業可能影響金泉項目進展的風險,包括礦產資源、品位、回收率、金屬價格、資本和運營成本以及税收的適用方面的可能變化;是否有足夠的資金及時和可接受地為計劃或進一步需要的工作提供資金;設備和合格人員的可獲得性,設備或流程未能按預期運行,隨着計劃的不斷完善,項目參數發生變化,包括運營用水需求;採礦業的監管、環境和其他風險在公司的年度信息表和持續披露文件中得到更全面的描述, 這些可在SEDAR上獲得,網址為。在編制前瞻性陳述時所做的假設包括:當前資源估計的準確性以及對鑽探、冶金測試和其他勘探結果的解釋;內華達州和猶他州地方政府對採礦的持續支持;推進Gold Springs項目的設備和合格人員的可用性;公司現有計劃以及對Gold Springs的進一步勘探和開發計劃的執行情況,這些計劃可能會因公司觀點的變化或如果出現新的信息而發生變化,因此改變此類計劃或計劃是謹慎的。提醒讀者不要過度依賴本新聞稿中包含的前瞻性陳述。除法律另有規定外,公司不承擔因新信息、未來事件或任何其他原因而更新或修改任何前瞻性陳述的義務。除非另有説明,否則本新聞稿中的前瞻性陳述描述了該公司截至本新聞稿發佈之日的預期。

SOURCE: Gold Springs Resources Corporation

資料來源:金泉資源公司


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論