Capitan Mining Drills 1.5m of 307.53 G/t Ageq & 1.5m of 344.77 G/t Ageq Within a Wider Interval of 21.3m of 132.86 G/t Ageq at the Jesus Maria Vein
Capitan Mining Drills 1.5m of 307.53 G/t Ageq & 1.5m of 344.77 G/t Ageq Within a Wider Interval of 21.3m of 132.86 G/t Ageq at the Jesus Maria Vein
Vancouver, British Columbia--(Newsfile Corp. - August 30, 2022) - Capitan Mining Inc. (TSXV: CAPT) ("Capitan" or the "Company") is pleased to report continued exploration results from five reverse circulation (RC) drillholes from the Jesus Maria silver zone at its 100%-owned Cruz de Plata Project (Formerly referred to as Peñoles), in Durango, Mexico.
温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年8月30日)-Capitan礦業公司(TSXV:CAPT)(“Capitan”或“The Company”)我們很高興地報告在墨西哥杜蘭戈擁有100%股權的Cruz de Plata項目(以前稱為Peñoles)的五個反循環(RC)鑽孔的持續勘探結果。
Highlights:
重點:
- Drill results extend high grade silver mineralization at Jesus Maria to depth; identifying a new higher grade silver zone, which remains open (See Figure 1: Updated long section)
- Hole 22-JMRC-19 returned 21.3m of 132.9 g/t Ageq, including 1.5m of 307.5 g/t Ageq and 1.5m of 344.8 g/t Ageq
- Hole 22-JMRC-13 returned 3.0m of 225.8 g/t Ageq
- All drill holes successfully intersected the Jesus María vein and extended the zone down-dip
- Programs of soil sampling and surface trenching and prospecting continue at the Capitan, Jesus Maria, and San Rafael targets
- Six drillholes are pending from the spring 2022 RC program testing the Jesus Maria vein, Gully Fault and San Rafael north zones
- 鑽探結果將耶穌瑪利亞的高品位銀礦化延伸到深處;發現了一個新的高品位銀礦帶,該銀礦帶仍然開放(見圖1:更新的長節)
- 22號孔-JMRC-19退回21.3m/132.9 g/t AgEq,包括1.5米307.5克/噸AgEq和1.5米344.8 g/t AgEq
- 22號孔-JMRC-13返還3.0米225.8 g/t AgEq
- 所有的鑽孔都成功地穿過了Jesse María靜脈,並將區域向下延伸
- 在Capitan、Jesse Maria和San Rafael目標繼續進行土壤採樣、地表挖掘和勘探方案
- 2022年春季RC計劃正在進行六個鑽孔,以測試耶穌·瑪麗亞礦脈、峽谷斷層和聖拉斐爾北部地區
Figure 1. Comparison of updated long section (right) demonstrates continued growth of higher-grade silver zones to depth at Jesus Maria vs previously released long section (left: released June 29, 2022)
圖1.更新後的長段圖(右)顯示,與之前發佈的長段圖(左:2022年6月29日發佈)相比,耶穌瑪利亞的高等級銀帶繼續向深度增長
Discussion
討論
Capitan Mining continues to focus exploration activities on the expansion and delineation of the Jesus Maria, high-grade, Ag-vein zone. Drillholes were designed as either step-outs along section or as strategic infills, to further delineate areas of high-grade Ag-mineralization. All drillholes reported herein, except for 22-JMRC-17 were step-out holes focused on expanding mineralization down-dip to the east of the Gully Fault (See Figure 2). All drillholes were successful in intersecting Jesus Maria style mineralization, expanding the zone between 43m and 114m down-dip along section.
Capitan礦業繼續將勘探活動的重點放在耶穌·瑪麗亞高品位銀礦帶的擴張和圈定上。為了進一步圈定高品位銀礦化的區域,鑽孔被設計成沿區段退出或作為戰略填充物。除22-JMRC-17外,本文報告的所有鑽孔都是臺階孔,重點是將礦化向下擴展到溝谷斷層以東(見圖2)。所有鑽孔都成功地與耶穌瑪利亞式礦化相交,沿剖面向下擴展了43m至114m之間的帶。
Holes 22-JMRC-16, 18 and 19 were targeting the expansion of Jesus Maria Style mineralization to the southeast of the current drill defined boundary (See Figure 2: Long Section). All three holes returned multiple intervals of Jesus Maria style mineralization along their profiles ranging in width from 1.5m to 21.5m in length. All three holes were successful in extending the main body of Jesus Maria style mineralization down dip between 66m and 114m in their respective sections over a strike length of approximately 100m. The best results include 21.3m of 132.9 g/t Ageq, including 1.5m of 307.5 g/t Ageq and 1.5m of 344.8 g/t Ageq in hole 22-JMRC-19 and 19.8m of 68.4 g/t Ageq in hole 22-JMRC-16.
22號、JMRC-16號、18號和19號井的目標是將耶穌瑪利亞式礦化擴展到當前鑽探確定的邊界東南方(見圖2:長節)。這三個洞沿其剖面返回了多個耶穌·瑪麗亞式的礦化區間,寬度從1.5米到21.5米不等。所有三個井都成功地將耶穌瑪利亞風格的礦化主體向下延伸到各自區段的66米至114米之間,走向長度約為100米。最佳結果包括21.3m/132.9 g/t AgEq,包括1.5米307.5克/噸AgEq和1.5米344.8 g/t AgEq在22號孔-JMRC-19和19.8m/68.4 g/t AgEq在22號井-JMRC-16。
Figure 2. Long section along Main Jesus María Vein: The plane containing the long section has an azimuth of 090 and dip of -45 to the south. Silver equivalent calculated using the following equation AgEq = Ag g/t + (80 x Au g/t) + (0.003 x Pb g/t) + (0.0037 x Zn g/t).
圖2.耶穌·瑪麗亞主脈的長段:包含長段的平面方位角為090,向南傾角為-45。使用以下公式計算出銀當量AgEq=Agg/t+(80 x Au g/t)+(0.003 x Pbg/t)+(0.0037 x Zn g/t)。
Jesus Maria Zone Continues To Expand
耶穌·瑪麗亞專區繼續擴大
Looking at Figure 2 (Long section), the significance of the current batch of holes can be seen, with the expansion of the higher-grade zones (Reds and Purples) within main Jesus Maria body of mineralization, compared to the last update. Holes 22-JMRC-17, 18, and 19 have expanded and identified additional areas of high-grade mineralization at depth, with the main Jesus Maria zone continuing to grow significantly at depth since the drill program started.
請看圖2(長段),與上次更新相比,可以看出當前一批孔的重要性,與上次更新相比,主耶穌瑪利亞礦體內較高品位的帶(紅色和紫色)擴大了。22號井-JMRC-17號、18號和19號井擴大並確定了更多的深度高品位礦化區,自鑽探計劃開始以來,主要的耶穌瑪利亞帶繼續在深度顯著增長。
In addition, four drillholes are still pending (See Figure 2), from drillholes that were targeting high-grade mineralization in the vicinity of the Gully Fault.
此外,針對溝谷斷層附近高品位礦化的4個鑽孔仍未完成(見圖2)。
Surface Work Continues at Cruz De Plata
Cruz de Plata的地面工作仍在繼續
In addition to the RC drill program at Jesus Maria, surface work at the Cruz De Plata project continues to identify new targets. Ongoing programs include:
除了耶穌瑪麗亞的RC鑽探計劃外,Cruz de Plata項目的地面工作還在繼續確定新的目標。正在進行的計劃包括:
- Property wide soil sampling over the Capitan, Jesus Maria, San Rafael and El Tubo vein systems
- Surface pitting and trenching at the Capitan target
- Property wide surface mapping to delineate additional areas of mineralization and skarn style alteration to the north of Jesus Maria
- Capitan、Jesse Maria、San Rafael和El Tubo脈系的全地產土壤採樣
- 在Capitan目標上的表面點蝕和溝槽
- 在耶穌瑪利亞以北劃定其他礦化和夕卡巖風格蝕變的物業範圍的表面測繪
Additionally, the Company has been in talks with various geophysical groups with respect to conducting a property wide airborne magnetic/magnetotelluric survey across the property package this fall. In conjunction with this, a more focused program of deep penetrating, ground IP/resistivity is also being discussed, to be conducted over the Jesus Maria, and Capitan targets.
此外,該公司一直在與多個地球物理小組就今年秋季在整個物業範圍內進行航空磁力/大地電磁勘測進行談判。與此同時,還在討論一項更有針對性的深層滲透、地面激電/電阻率計劃,該計劃將在耶穌瑪利亞和Capitan目標上進行。
Capitan's CEO, Alberto Orozco, states: "We are very pleased to show the continuity at depth of both grade and thickness of the Jesus Maria silver vein. We look forward to upcoming holes which will not only continue to test the extension of Jesus María, but of the Gully Fault Ag-Au zone as well. These two higher-grade silver zones in conjunction with the JM North, JM South and San Rafael targets, highlight the potential for significant scale at the Cruz de Plata Silver Project."
Capitan的首席執行官阿爾貝託·奧羅斯科表示:"我們非常高興地展示了耶穌瑪利亞銀脈在等級和厚度上的深度連續性。我們期待着即將到來的洞,這些洞不僅將繼續測試耶穌·瑪麗亞的延伸,而且還將測試溝谷斷層銀金地帶的延伸。這兩個較高品位的銀帶與JM North、JM South和San Rafael目標相結合,突顯了Cruz de Plata白銀項目大規模擴張的潛力。
Figure 3. Plan map of Jesus Maria Silver Zone showing drillhole locations and location of long section over Jesus Maria vein
圖3.耶穌瑪利亞銀區平面圖,顯示鑽孔位置和耶穌瑪利亞靜脈上方長段的位置
Figure 4. Cross section of hole 22-JMRC-19
圖4.孔22-JMRC-19的橫截面
Table 1. Table of drill results for hole 22-JMRC-13, 16, 17, 18, 19
表1.22孔鑽探結果表-JMRC-13、16、17、18、19
22-JMRC-13 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 53.3 | 57.9 | 4.6 | 25.12 | 13.20 | 0.13 | 0.01 | 0.029 |
Interval | 59.4 | 61.0 | 1.5 | 26.57 | 18.20 | 0.09 | 0.01 | 0.034 |
Interval | 70.1 | 71.6 | 1.5 | 100.54 | 80.40 | 0.24 | 0.02 | 0.020 |
Interval | 176.8 | 179.8 | 3.0 | 225.79 | 51.65 | 0.10 | 1.29 | 3.455 |
Interval | 196.6 | 201.2 | 4.6 | 47.39 | 12.13 | 0.09 | 0.37 | 0.454 |
Interval | 221.0 | 222.5 | 1.5 | 44.23 | 13.60 | 0.35 | 0.02 | 0.043 |
22-JMRC-16 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 29.0 | 30.5 | 1.5 | 34.84 | 8.10 | 0.29 | 0.00 | 0.101 |
Interval | 38.1 | 45.7 | 7.6 | 26.23 | 13.90 | 0.15 | 0.00 | 0.014 |
Interval | 103.6 | 105.2 | 1.5 | 34.09 | 18.50 | 0.19 | 0.00 | 0.009 |
Interval | 132.6 | 134.1 | 1.5 | 45.70 | 19.70 | 0.31 | 0.03 | 0.009 |
Interval | 181.4 | 182.9 | 1.5 | 121.18 | 74.80 | 0.03 | 0.54 | 0.740 |
Interval | 195.1 | 198.1 | 3.0 | 71.59 | 46.50 | 0.03 | 0.25 | 0.419 |
Interval | 216.4 | 236.2 | 19.8 | 68.38 | 28.57 | 0.08 | 0.42 | 0.555 |
22-JMRC-17 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 13.7 | 15.2 | 1.5 | 60.44 | 44.30 | 0.20 | 0.00 | 0.012 |
Interval | 41.1 | 42.7 | 1.5 | 102.56 | 86.00 | 0.19 | 0.02 | 0.018 |
Interval | 57.9 | 61.0 | 3.0 | 112.97 | 46.45 | 0.68 | 0.18 | 0.171 |
Interval | 96.0 | 97.5 | 1.5 | 67.08 | 23.90 | 0.53 | 0.00 | 0.014 |
Interval | 106.7 | 120.4 | 13.7 | 132.63 | 69.24 | 0.17 | 0.48 | 0.963 |
Interval | 181.4 | 182.9 | 1.5 | 35.33 | 16.30 | 0.07 | 0.18 | 0.212 |
Interval | 202.7 | 207.3 | 4.6 | 34.99 | 14.47 | 0.11 | 0.15 | 0.191 |
Interval | 236.2 | 239.3 | 3.0 | 37.18 | 29.35 | 0.04 | 0.05 | 0.079 |
22-JMRC-18 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 24.4 | 25.9 | 1.5 | 61.27 | 48.00 | 0.16 | 0.01 | 0.012 |
Interval | 102.1 | 103.6 | 1.5 | 28.63 | 26.00 | 0.03 | 0.01 | 0.012 |
Interval | 164.6 | 167.6 | 3.0 | 34.59 | 19.05 | 0.03 | 0.09 | 0.277 |
Interval | 173.7 | 178.3 | 4.6 | 71.36 | 51.13 | 0.12 | 0.14 | 0.167 |
Interval | 184.4 | 185.9 | 1.5 | 29.23 | 22.00 | 0.02 | 0.08 | 0.093 |
Interval | 192.0 | 195.1 | 3.0 | 95.56 | 40.00 | 0.03 | 0.83 | 0.763 |
Interval | 246.9 | 248.4 | 1.5 | 32.45 | 13.10 | 0.21 | 0.01 | 0.059 |
22-JMRC-19 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 73.2 | 74.7 | 1.5 | 38.56 | 31.00 | 0.08 | 0.01 | 0.031 |
Interval | 198.1 | 201.2 | 3.0 | 59.08 | 42.65 | 0.03 | 0.13 | 0.273 |
Interval | 207.3 | 228.6 | 21.3 | 132.86 | 84.54 | 0.05 | 0.59 | 0.721 |
including | 214.9 | 216.4 | 1.5 | 307.53 | 160.00 | 0.07 | 2.03 | 2.190 |
including | 219.5 | 221.0 | 1.5 | 344.77 | 189.00 | 0.02 | 2.29 | 2.310 |
Interval | 248.4 | 249.9 | 1.5 | 27.96 | 4.30 | 0.00 | 0.12 | 0.534 |
22-JMRC-13 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) |
間隔 | 53.3 | 57.9 | 4.6 | 25.12 | 13.20 | 0.13 | 0.01 | 0.029 |
間隔 | 59.4 | 61.0 | 1.5 | 26.57 | 18.20 | 0.09 | 0.01 | 0.034 |
間隔 | 70.1 | 71.6 | 1.5 | 100.54 | 80.40 | 0.24 | 0.02 | 0.020 |
間隔 | 176.8 | 179.8 | 3.0 | 225.79 | 51.65 | 0.10 | 1.29 | 3.455 |
間隔 | 196.6 | 201.2 | 4.6 | 47.39 | 12.13 | 0.09 | 0.37 | 0.454 |
間隔 | 221.0 | 222.5 | 1.5 | 44.23 | 13.60 | 0.35 | 0.02 | 0.043 |
22-JMRC-16 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) |
間隔 | 29.0 | 30.5 | 1.5 | 34.84 | 8.10 | 0.29 | 0.00 | 0.101 |
間隔 | 38.1 | 45.7 | 7.6 | 26.23 | 13.90 | 0.15 | 0.00 | 0.014 |
間隔 | 103.6 | 105.2 | 1.5 | 34.09 | 18.50 | 0.19 | 0.00 | 0.009 |
間隔 | 132.6 | 134.1 | 1.5 | 45.70 | 19.70 | 0.31 | 0.03 | 0.009 |
間隔 | 181.4 | 182.9 | 1.5 | 121.18 | 74.80 | 0.03 | 0.54 | 0.740 |
間隔 | 195.1 | 198.1 | 3.0 | 71.59 | 46.50 | 0.03 | 0.25 | 0.419 |
間隔 | 216.4 | 236.2 | 19.8 | 68.38 | 28.57 | 0.08 | 0.42 | 0.555 |
22-JMRC-17 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) |
間隔 | 13.7 | 15.2 | 1.5 | 60.44 | 44.30 | 0.20 | 0.00 | 0.012 |
間隔 | 41.1 | 42.7 | 1.5 | 102.56 | 86.00 | 0.19 | 0.02 | 0.018 |
間隔 | 57.9 | 61.0 | 3.0 | 112.97 | 46.45 | 0.68 | 0.18 | 0.171 |
間隔 | 96.0 | 97.5 | 1.5 | 67.08 | 23.90 | 0.53 | 0.00 | 0.014 |
間隔 | 106.7 | 120.4 | 13.7 | 132.63 | 69.24 | 0.17 | 0.48 | 0.963 |
間隔 | 181.4 | 182.9 | 1.5 | 35.33 | 16.30 | 0.07 | 0.18 | 0.212 |
間隔 | 202.7 | 207.3 | 4.6 | 34.99 | 14.47 | 0.11 | 0.15 | 0.191 |
間隔 | 236.2 | 239.3 | 3.0 | 37.18 | 29.35 | 0.04 | 0.05 | 0.079 |
22-JMRC-18 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) |
間隔 | 24.4 | 25.9 | 1.5 | 61.27 | 48.00 | 0.16 | 0.01 | 0.012 |
間隔 | 102.1 | 103.6 | 1.5 | 28.63 | 26.00 | 0.03 | 0.01 | 0.012 |
間隔 | 164.6 | 167.6 | 3.0 | 34.59 | 19.05 | 0.03 | 0.09 | 0.277 |
間隔 | 173.7 | 178.3 | 4.6 | 71.36 | 51.13 | 0.12 | 0.14 | 0.167 |
間隔 | 184.4 | 185.9 | 1.5 | 29.23 | 22.00 | 0.02 | 0.08 | 0.093 |
間隔 | 192.0 | 195.1 | 3.0 | 95.56 | 40.00 | 0.03 | 0.83 | 0.763 |
間隔 | 246.9 | 248.4 | 1.5 | 32.45 | 13.10 | 0.21 | 0.01 | 0.059 |
22-JMRC-19 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) |
間隔 | 73.2 | 74.7 | 1.5 | 38.56 | 31.00 | 0.08 | 0.01 | 0.031 |
間隔 | 198.1 | 201.2 | 3.0 | 59.08 | 42.65 | 0.03 | 0.13 | 0.273 |
間隔 | 207.3 | 228.6 | 21.3 | 132.86 | 84.54 | 0.05 | 0.59 | 0.721 |
包括 | 214.9 | 216.4 | 1.5 | 307.53 | 160.00 | 0.07 | 2.03 | 2.190 |
包括 | 219.5 | 221.0 | 1.5 | 344.77 | 189.00 | 0.02 | 2.29 | 2.310 |
間隔 | 248.4 | 249.9 | 1.5 | 27.96 | 4.30 | 0.00 | 0.12 | 0.534 |
Note: Only drill intercept lengths are reported in the table. Drill holes are designed to cut the mineralized zones as close to true width as possible, with true widths ranging from 70-95% of the reported drilled length.
注:表中僅報告了鑽頭截距長度。鑽孔被設計成儘可能接近真實寬度來切割礦化帶,真實寬度從報告的鑽井長度的70%到95%不等。
* Silver equivalent calculated using the following equation AgEq = Ag g/t + (80 x Au g/t) + (0.003 x Pb g/t) + (0.0037 x Zn g/t).
*使用以下公式計算的銀當量AgEq=Agg/t+(80 x Au g/t)+(0.003 x Pbg/t)+(0.0037 x Zn g/t)。
About the Jesus María Silver Project
關於耶穌·瑪麗亞白銀項目
The Jesus Maria (JM) Silver Project is located approximately 280m to the northeast of the Capitan's Oxide Gold deposit on its 100% owned Cruz de Plata property. It has been traced by surface trenching and diamond drilling over a strike length of 750m and to a depth of 150m, with the majority of drilling focused over 250m strike length and less than 100m below surface.
Jesse Maria(JM)白銀項目位於Capitan的氧化金礦東北方向約280米處,該金礦位於其100%擁有的Cruz de Plata地產上。已通過地面挖溝和鑽石鑽探追蹤到它,其走向長度為750米,深度為150米,大部分鑽井集中在250米以上,地表以下不到100米。
The Jesus Maria Silver Project has a long mining history going back to the late 1800's, when the Penoles Mining company constructed several shafts and drifts to exploit the high-grade silver veins in the area. In recent years, work programs conducted by previous operators has demonstrated significant potential at the Jesus Maria silver deposit. The work to date has identified Two (2) distinct styles of silver mineralization:
耶穌瑪利亞銀礦項目有着悠久的採礦歷史,可以追溯到19世紀末,當時Penoles礦業公司建造了幾個豎井和礦坑,以開採該地區的高品位銀礦脈。近年來,以前的運營商進行的工作計劃已顯示出耶穌瑪麗亞銀礦的巨大潛力。到目前為止,這項工作已經確定了兩(2)種不同的銀礦化類型:
- High-grade silver polymetallic veins (Silver gold lead-Zinc)
- High-grade silver with gold veins
- 高品位銀多金屬礦脈(銀、金、鉛、鋅)
- 高品級金紋白銀
Highlights of trenching and diamond drilling by previous operators are presented below:
以下是以前運營商挖溝和鑽探鑽石的要點:
Prior Trenching Highlights - Jesus Maria (2011-2013)
之前的扣人心絃的亮點-耶穌·瑪麗亞(2011-2013)
- 22m of 224g/t Ag, 1.08 g/t Au, 2.5% Pb and 1.7% Zn (2011)
- 8.3m of 144 g/t Ag, 1.68 g/t Au, 2.4% Pb and 2.2% Zn (2011)
- 13.4m of 309 g/t Ag, 1.7 g/t Au. 2.4% Pb and 0.6% Zn (2011)
- 2m of 2,152.2 g/t Ag and 0.48 g/t Au, within a wider interval of 15.4m of 420.8 g/t Ag, 0.15 Au (2013)
- 2m of 378.9 g/t Ag and 0.97 g/t Au, within a wider interval of 15.8m of 129.8 g/t Ag and 0.16 g/t Au (2013)
- 22米224克/噸銀、1.08克/噸金、2.5%鉛和1.7%鋅(2011年)
- 83m,144克/噸銀,1.68克/噸金,2.4%鉛和2.2%鋅(2011年)
- 134m,309g/t銀,1.7g/t Au。2.4%鉛和0.6%鋅(2011)
- 2米2,152.2克/噸銀和0.48克/噸金,在15.4米的較寬間隔內,420.8克/噸銀,0.15金(2013年)
- 2m,378.9 g/t Ag和0.97g/t Au,在129.8 g/t Ag和0.16g/t Au(2013年)15.8m的較大間隔內
Prior Diamond Drill Highlights - Jesus Maria (2013-2014)
鑽石鑽探亮點--耶穌·瑪麗亞(2013-2014)
High-grade Silver Polymetallic veins
高品位銀多金屬礦脈
- JM-DDH-13-06: 0.9m of 3,409.1 g/t Ag, 0.9 Au, 3.4% Pb and 7.1% Zn within a wider interval of 11.85m of 320.3 g/t Ag and 0.17 Au
- JM-DDH-13-07: 2.1m of 279.5 g/t Ag, 0.21 g/t Au, 4.09% Pb and 7.57% Zn
- JM-DDH-14-10: 2.3m of 113.8 g/t Ag, 0.82 g/t Au, 4.3% Pb and 1.8% Zn
- JM-DDH-13-06:3.409.1g/t銀、0.9Au、3.4%鉛和7.1%鋅的0.9m在320.3 g/t銀和0.17Au的11.85m的較大間隔內
- JM-DDH-13-07:2.1M含279.5克/噸銀、0.21克/噸金、4.09%鉛和7.57%鋅
- JM-DDH-14-10:2.3m,113.8克/噸銀,0.82g/噸金,4.3%鉛和1.8%鋅
High Grade Silver & Gold Veins
高品位銀金礦脈
- JM-DDH-14-24: 7.15m of 988 g/t Ag and 1.24 g/t Au within a wider interval of 70.8m of 147.8 g/t Ag, 0.37 g/t Au
- JM-DDH-14-10: 4.25m of 732.2 g/t Ag, 1.2 g/t Au, within a wider interval of 40.6m of 123.9g/t Ag and 0.54 g/t Au
- JM-DDH-13-07: 2m of 988.5 g/t Ag, 0.23 g/t Au within an interval of 4m of 533 g/t Ag and 0.16 g/t Au
- JM-DDH-14-27: 4.7m of 398 g/t Ag and 1.33 g/t Au within a wider interval of 47m of 125 g/t Ag and 0.4 g/t Au
- JM-DDH-14-24:7.15米988克/噸銀和1.24克/噸金,在70.8米的較寬間隔內147.8克/噸銀,0.37克/噸金
- JM-DDH-14-10:4.25米,732.2克/噸銀,1.2克/噸金,在40.6米的較寬間隔內,123.9克/噸銀和0.54g/噸金
- JM-DDH-13-07:2M為988.5克/噸銀,0.23克/噸金,間隔4M為533克/噸銀和0.16克/噸金
- JM-DDH-14-27:4.7m,398 g/t Ag和1.33 g/t Au,在較寬的47 m間隔內,125 g/t Ag和0.4 g/t Au
Approximately 3,100m of diamond drilling were completed by previous operators at the Jesus Maria silver deposit (2011-2014), which were used to complete an initial 43-101 compliant, Inferred resource in 2015 consisting of 7.5 million tonnes at an average grade of 62 g/t Ag (15 million contained ounces) and 0.1 g/t Au (26,000 contained ounces). Capitan has submitted an updated 43-101 report on the Cruz de Plata project inferred resource (formerly called Peñoles project), with an effective date of January 12, 2020. The report was authored by Derrick Strickland, P. Geo. And Robert Sim, P. Geo. The report can be found in SEDAR.
Jesse Maria銀礦於二零一一年至二零一四年完成約3,100米的鑽石鑽探,於二零一五年初步完成符合43-101標準的推斷資源,包括750萬噸平均品位為62克/噸銀(1,500萬含盎司)和0.1克/噸金(26,000含盎司)。Capitan已經提交了關於Cruz de Plata項目推斷資源(以前稱為Peñoles項目)的更新的43-101報告,生效日期為2020年1月12日。這份報告是由P.Geo的德里克·斯特里克蘭撰寫的。和羅伯特·西姆,P.Geo。該報告可在SEDAR中找到。
Qualified Person & QA/QC:
合格人員和QA/QC:
The scientific and technical data contained in this news release pertaining to the Peñoles Project was reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining, who is responsible for ensuring that the technical information provided in this news release is accurate and who acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects.
本新聞稿中包含的與Peñoles項目有關的科學和技術數據已由Capitan Mining的非獨立合格人員Marc Idziszek,P.Geo審核和批准,他負責確保本新聞稿中提供的技術信息是準確的,並根據National Instrument 43-101礦物項目披露標準擔任“合格人員”。
Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and verification of control samples including standard reference material, blanks and duplicates consistent with industry standards.
Capitan礦業公司有一個質量保證/質量控制計劃,其中包括插入和驗證控制樣品,包括符合行業標準的標準參考材料、空白和複製品。
RC drill samples from the Peñoles Project are collected and split at the drill site using a Gilson Universal Splitter. The samples are stored in either plastic bags (dry) or micropore bags (wet) and secured with plastic zip-ties and then transported to the preparation laboratory of Bureau Veritas in Hermosillo, Sonora. The sample pulps are then transported to the Bureau Veritas' laboratory in Vancouver, where they are assayed for gold by fire assay with atomic absorption finish (FA430 assay method code; 0.005 to 10 ppm detection limit). Samples over 10 ppm Au and over 100 ppm Ag are assayed with gravimetric finish (Assay code FA530). All samples are also assayed by ICP-ES (code AQ300) for a suite of 33 elements. Samples over 1% Pb and Zn are assayed by Aqua regia Ore Grade ICP-ES (AQ 370).
Peñoles項目的RC鑽探樣品在鑽探現場使用Gilson萬能分離器進行分離。樣品被儲存在塑料袋(乾的)或微孔袋(濕的)中,並用塑料拉鍊固定,然後運輸到位於索諾拉Hermosillo的Bureau Veritas的製備實驗室。然後,樣品紙漿被運送到温哥華Veritas局的實驗室,在那裏用原子吸收光譜分析火分析金(FA430分析方法代碼;檢測下限為0.005至10ppm)。超過10ppm的Au和超過100ppm的Ag的樣品用重量法測定(分析代碼FA530)。所有樣品還用電感耦合等離子體發射光譜儀(代碼AQ300)對一套33種元素進行分析。鉛和鋅含量超過1%的樣品用王水礦石級電感耦合等離子體發射光譜儀(AQ 370)測定。
All summarized intervals reported in this press release were calculated using a 25 ppm Ag equivalent (AgEq) cut-off grade with AgEq considering Ag, Au, Pb and Zn and calculated as follows: AgEq = Ag g/t + (80x Au g/t) + (0.003 x Pb g/t) + (0.0037 x Zn g/t). Intervals contain no more than 3 metres of internal dilution. High grades have not been capped.
本新聞稿中報告的所有彙總區段均採用25ppm銀當量(AgEq)與AgEq的邊際品位計算,並考慮了Ag、Au、Pb和Zn,計算公式如下:AgEq=Agg/t+(80x Au g/t)+(0.003 x Pbg/t)+(0.0037 x Zn g/t)。井段內部稀釋度不超過3米。高分還沒有被封頂。
About Capitan Mining Inc.:
關於Capitan礦業公司:
Capitan Mining is a well-funded junior exploration company focused on its 100% owned gold and silver Peñoles Project in Durango, Mexico. The Company is led by a management team that has successfully advanced and developed several heap leach operations in Mexico over the past 16 years. More information for the Company can be found at .
Capitan礦業是一家資金雄厚的初級勘探公司,專注於其位於墨西哥杜蘭戈的100%擁有的金銀佩尼奧萊斯項目。該公司由一支管理團隊領導,該團隊在過去16年裏成功地推進和開發了墨西哥的幾項堆浸業務。欲瞭解更多有關該公司的信息,請訪問。
ON BEHALF OF CAPITAN MINING INC.
代表Capitan礦業公司。
"Alberto Orozco"
Alberto Orozco, CEO
《阿爾貝託·奧羅斯科》
Alberto Orozco,首席執行官
For additional information contact:
如需更多信息,請聯繫:
Alberto Orozco
CEO
Capitan Mining Inc.
info@capitanmining.com
Phone: (778) 327-6671
Fax: (778) 327-6675
Web:
阿爾貝託·奧羅斯科
首席執行官
Capitan礦業公司
郵箱:Info@Capitanmining.com
電話:(778)327-6671
傳真:(778)327-6675
網頁:
Raffi Elmajian
Corporate Communications
Capitan Mining Inc.
info@capitanmining.com
Phone: (778) 327-6671
Web:
拉菲·埃爾馬吉安
企業通信
Capitan礦業公司
郵箱:Info@Capitanmining.com
電話:(778)327-6671
網頁:
Certain statements in this press release may be considered forward-looking information. These statements can be identified by the use of forward-looking terminology (e.g., "expect"," estimates", "intends", "anticipates", "believes", "plans"). Such information involves known and unknown risks -- including the availability of funds, the results of financing and exploration activities, the interpretation of exploration results and other geological data, or unanticipated costs and expenses and other risks identified by Capitan in its public securities filings that may cause actual events to differ materially from current expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.
本新聞稿中的某些陳述可能被視為前瞻性信息。可以通過使用前瞻性術語(例如,“預期”、“估計”、“打算”、“預期”、“相信”、“計劃”)來確定這些陳述。此類信息涉及已知和未知風險--包括資金的可獲得性、融資和勘探活動的結果、對勘探結果和其他地質數據的解讀,或Capitan在其公開證券申報文件中確定的意外成本和費用以及其他可能導致實際事件與當前預期大不相同的風險。告誡讀者不要過度依賴這些前瞻性陳述,這些陳述僅在本新聞稿發佈之日發表。
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。
To view the source version of this press release, please visit
要查看本新聞稿的源版本,請訪問
譯文內容由第三人軟體翻譯。