share_log

Imagine Lithium Reports Multiple Results from Jackpot Lithium Project Including 8 m of 1.28% Li2O

Imagine Lithium Reports Multiple Results from Jackpot Lithium Project Including 8 m of 1.28% Li2O

想象鋰公司報告了大獎鋰項目的多個結果,包括8米1.28%的Li2O
newsfile ·  2022/05/11 19:09

Vancouver, British Columbia--(Newsfile Corp. - May 11, 2022) - Imagine Lithium Inc. (TSXV: ILI) (OTCQB: ARXRF) (the "Company" or "Imagine") is pleased to announce assay results from previously unsampled core that were drilled in 2018. The drillholes tested lithium-bearing granitic pegmatite dikes within the main dike swarm of the Jackpot project. Results include 8 m grading 1.28% lithium oxide (Li2O) (Hole J-18-M-04) and 8.8 m grading 1.02% Li2O (Hole J-18-M-03). See Table 1 below for detailed results.

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年5月11日)-Imagine Lithium Inc.(多倫多證券交易所股票代碼:ILI)(場外交易市場代碼:ARXRF)(以下簡稱“公司”或“Imagine”)欣然宣佈2018年鑽探的以前未取樣的巖芯的分析結果。這些鑽孔測試了大獎項目主堤羣內含鋰的花崗偉晶巖巖脈。結果包括8M級1.28%鋰(Li2O)(孔J-18-M-04)和8.8米分級1.02%鋰2O(J-18-M-03孔)。有關詳細結果,請參見下表1。

J.C. St-Amour, President of Imagine Lithium commented, "Once we refocused on the Jackpot Lithium project our new geological team reviewed all the historical drill core from the 2018 drill program and immediately identified significant spodumene mineralization in unsampled core. I am pleased that the assay results confirm the visuals that we have been seeing at the Jackpot project. "We are looking forward to seeing results from our current drill program, which is designed to not only test the main dike swarm but also to expand on the known historical resource area and investigate the extents of the known dikes as well as previously undrilled lithium showings. The drill program is progressing well, with five holes completed with samples in the lab."

Imagine Lithium總裁J.C.St-Amour評論説:“一旦我們重新關注Jackpot鋰項目,我們的新地質團隊審查了2018年鑽探計劃中的所有歷史鑽芯,立即在未取樣的巖心中發現了顯著的鋰輝石礦化。我很高興化驗結果證實了我們在Jackpot項目中看到的視覺效果。”我們期待着看到我們當前鑽探計劃的結果,該計劃不僅旨在測試主脈羣,還旨在擴大已知的歷史資源區,調查已知巖脈的範圍以及以前未鑽探的鋰礦顯示。鑽探計劃進展順利,實驗室已經完成了5個帶樣品的鑽孔。

Table 1: Assay Results from Previously Unsampled Drill Holes (2018), Jackpot Property.

表1:之前未取樣鑽孔的化驗結果(2018年),大獎財產。

DDH_ID Li2O (wt.%) Interval (m) From (m) To (m)
J_18_M_04 1.28 8.00 36.00 44.00
J-18_M_03 1.02 8.80 66.20 75.00
J_18_M_02 0.81 2.70 77.30 80.00
and 0.43 4.20 82.00 86.20
J_18_M_01 0.69 4.00 80.00 84.00
DDH_ID 2O(重量百分比) 間隔(M) 發件人(M) 至(M)
J_18_M_04 1.28 8.00 36.00 44.00
J-18_M_03 1.02 8.80 66.20 75.00
J_18_M_02 0.81 2.70 77.30 80.00
0.43 4.20 82.00 86.20
J_18_M_01 0.69 4.00 80.00 84.00

Figure 1: Collar Locations for the 2018 and 2022 Drill Programs.

圖1:2018年和2022年鑽井計劃的卡箍位置。

Further to our news release dated March 21, 2022, the Company announces that the issuance of 8,000 common shares for the purchase of additional ground within the Jackpot property are payable 50% to Gravel Ridge Resources Ltd. (controlled by Michael Frymire and Pamela Katie Misener) and 50% to 154423 Ontario Inc. (controlled by Julia English and Perry English). In addition, the agreement with the First Nations Groups was signed on March 18, 2022.

繼我們於2022年3月21日發佈的新聞稿之後,公司宣佈,發行8,000股普通股用於購買大獎地產內的額外土地,將向Gravel Ridge Resources Ltd.(由Michael Frymire和Pamela Katie Misener控制)支付50%,向154423 Ontario Inc.(由Julia English和Perry English控制)支付50%。此外,與第一民族團體的協定於2022年3月18日簽署。

About Jackpot

關於大獎

The Jackpot Lithium property, located in the Georgia Lake Area about 140 km NNE of Thunder Bay, Ontario, is approximately 12 km by air from the TransCanada Highway (Hwy 11) and the main railroad which connects to the port town of Nipigon, on Lake Superior. The property contains known lithium bearing granitic pegmatite dikes, of which two provided estimated historical resources of 2 million tons at 1.09% Li2O and 750,000 tons at 1.38% Li2O*. The Company recently acquired additional claims with identified lithium showings located on strike to the main historical resources.

Jackpot鋰礦位於安大略省桑德灣東北約140公里處的喬治亞湖地區,從橫貫加拿大的駭維金屬加工(11號高速公路)和連接蘇必利爾湖港口城市尼皮貢的主要鐵路乘飛機約12公里。該礦區含有已知的含鋰花崗偉晶巖脈,其中兩個以1.09%鋰提供了200萬噸的歷史資源量。2O和75萬噸,1.38%鋰2O*。該公司最近獲得了對主要歷史資源的額外索賠,已確定的鋰礦藏位於罷工地點。

Qualified Person

有資格的人

The technical content of this news release was approved by Michel Boily, PhD, P.Geo, an Independent Qualified Person as defined by the National Instrument 43-101.

本新聞稿的技術內容得到了由國家儀器43-101定義的獨立合格人員Michel Boory,PhD,P.Geo的批准。

* The estimates presented above are treated as historic information and have not been verified or relied upon for economic evaluation by the Company. These historical mineral resources do not refer to any category of sections 1.2 and 1.3 of NI-43-101 such as mineral resources or mineral reserves as stated in the 2010 CIM Definition Standards on Mineral Resources and Mineral Reserves. The explanation lies in the inability by the Company to verify the data acquired by the various historical drilling campaigns. The Company has not done sufficient work yet to classify the historical estimates as current mineral resources or mineral reserves.

* 上述估計均視為歷史資料,並未經本公司核實或用作經濟評估之依據。這些歷史礦產資源不是指NI-43-101第1.2和1.3節中的任何類別,例如2010年CIM《礦產資源和礦產儲量定義標準》中所述的礦產資源或礦產儲量。原因在於該公司無法核實通過各種歷史鑽探活動獲得的數據。該公司尚未做足夠的工作來將歷史估計歸類為當前礦產資源或礦產儲量。

About Infinite Ore Corp.

關於無限礦石公司

Infinite Ore is a junior mining exploration company focused on seeking and acquiring world-class mineral projects. The company holds the Jackpot lithium property located near Nipigon, Ont., which contains known pegmatite showings including two historical resources of 2 million tons grading 1.09% Li2O and 750,000 tons at 1.38% Li2O.

無限礦是一家專注於尋找和收購世界級礦產項目的初級礦業勘探公司。該公司擁有位於安大略州尼皮貢附近的Jackpot鋰礦,其中包含已知的偉晶巖礦藏,其中包括兩個200萬噸的歷史資源,分級為1.09%Li2O和75萬噸,1.38%鋰2O.

ON BEHALF OF THE BOARD
"J.C. St-Amour"
J.C. St-Amour, President

我代表董事會
《J.C.St-Amour》
J.C.聖-阿穆爾總統

FOR FURTHER INFORMATION, PLEASE CONTACT:
Telephone: +1-604-683-3995
Toll Free: 1-888-945-4770

欲瞭解更多信息,請聯繫:
電話:+1-604-683-3995
免費電話:1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

FORWARD LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Investors are cautioned that these forward-looking statements are neither promises nor guarantees and are subject to risks and uncertainties that may cause future results to differ materially from those expected. These forward -looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances. All the forward-looking statements made in this press release are qualified by these cautionary statements and by those made in our filings with SEDAR in Canada (available at ).

前瞻性陳述:本新聞稿包含前瞻性陳述,與未來事件或未來業績有關,反映管理層目前的預期和假設。這些前瞻性陳述反映了管理層目前的信念,是基於公司所做的假設和目前可獲得的信息。請投資者注意,這些前瞻性陳述既不是承諾,也不是保證,可能會受到風險和不確定因素的影響,這些風險和不確定因素可能會導致未來的結果與預期的大不相同。這些前瞻性陳述是自本新聞稿發佈之日起作出的,除非適用的證券法規另有要求,否則公司不承擔任何更新或修訂這些陳述以反映新事件或新情況的義務。本新聞稿中的所有前瞻性陳述都受到這些警告性聲明以及我們提交給加拿大SEDAR的文件(可在)中做出的警示聲明的限制。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論