share_log

Revival Gold Intersects 12 g/t Gold Over 13.7 Meters and 8.8 g/t Gold Over 11.8 Meters Within 110 Meters of 4.3 g/t Gold at Beartrack-Arnett

Revival Gold Intersects 12 g/t Gold Over 13.7 Meters and 8.8 g/t Gold Over 11.8 Meters Within 110 Meters of 4.3 g/t Gold at Beartrack-Arnett

復興黃金在13.7米和8.8克/噸黃金相交超過13.7米和8.8克/噸黃金相交超過11.8米,在距離4.3克/噸黃金不到110米的範圍內。
GlobeNewswire ·  2021/12/02 20:36

Figure 1:

圖1:

Joss Target Area – Long Section View West
JOSS目標區-長截面圖西面

TORONTO, Dec. 02, 2021 (GLOBE NEWSWIRE) -- Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) ("Revival Gold" or the "Company"), is pleased to announce results from the final drill hole completed in the Joss target area as part of this year's exploration program at the Beartrack-Arnett Gold Project ("Beartrack-Arnett") located in Idaho, USA. Drilling returned broad, high-grade intercepts which underscore the underground mining potential of this 1 km long zone at Beartrack-Arnett.

多倫多,2021年12月2日(環球通訊社)復興l 黃金 Inc. (TSXV: RVG, OTCQX: RVLGF)復興黃金公司(“Revival Gold”或“公司”)很高興宣佈在Joss目標區完成的最後一個鑽孔的結果,這是今年位於美國愛達荷州的BearTrack-Arnett黃金項目(“BearTrack-Arnett”)勘探計劃的一部分。鑽探返回了廣泛的、高品位的截獲,這突顯了貝爾特勒-阿內特這一1公里長區域的地下開採潛力。

Highlights

亮點

  • 4.34 g/t gold over 110.6 meters including 12 g/t gold over 13.7 meters and 8.8 g/t gold over 11.8 meters1 in BT21-240D;
  • BT21-240D intersected the Panther Creek Shear Zone ("PCSZ") in the Joss target area at about 430 meters downhole (about 350 meters depth) mid-way along strike between drill holes BT21-237D and BT21-238D; and,
  • Further analysis and interpretation are pending.
  • 110.6米以上4.34g/噸黃金包括13.7米以上12克/噸黃金11.8米以上8.8克/噸黃金1在……裏面BT21-240D;
  • BT21-240D與黑豹溪切變區相交(“PCSZ”)JOSS目標區在…井下約430米(約350米深)沿中途走向BT21-237D孔與BT21-238D孔之間;及
  • 進一步分析和解釋尚待解決.

1 True width is estimated to be between 35% and 45% of drilled width. Un-cut fire assay grades.   

1真實寬度估計在鑽井寬度的35%到45%之間。未砍火化驗等級。

"This is a game-changing hole as it hosts the highest-grade gold intersections released to date from the Joss target area. With BT21-240D we are now beginning to see the full potential of the Beartrack-Arnett gold project", said Hugh Agro, President & CEO. "The high grades and substantial widths of mineralized structure encountered in BT21-240D reinforce our enthusiasm for the project's underground potential and the possibility of it being developed into a highly profitable and long-life mining operation. We have had a very high success rate drilling in the PCSZ along more than 5 km of strike and we look forward to the resumption of drilling at Joss in the new year," added Agro.

總裁兼首席執行官休·阿格羅(Hugh Agro)表示:“這是一個改變遊戲規則的洞,因為它擁有迄今從Joss目標區釋放的最高品位的黃金交叉口。有了BT21-240D,我們現在開始看到BearTrack-Arnett黃金項目的全部潛力。”“在BT21-240D遇到的高品位和大寬度的礦化結構增強了我們對該項目地下潛力的熱情,以及它被開發成高利潤和長壽命採礦業務的可能性。我們在PCSZ沿着超過5公里的走向進行了非常高的鑽探成功率,我們期待着在新的一年恢復Joss的鑽探,”Agro補充道。

Five holes were drilled in the Joss target area in 2021. Holes BT21-237D, BT21-238D and BT21-240D all intersected mineralization within the PCSZ. Holes BT21-236D and BT21-239DB were abandoned before intersecting the PCSZ in post-mineralization Tertiary rocks due to difficult drilling conditions. However, drill hole BT21-239DB intersected fracture-controlled sericite alteration in metasediments of the Yellowjacket Formation, the host rock for mineralization in the Joss area. Geochemical analysis confirmed the presence of weakly anomalous gold and arsenic values before the hole encountered an unexpected post-mineral fault that may have displaced the continuation of Joss mineralization in this area. While the direction and amount of displacement is unknown at this time, this result suggests that mineralization may extend south along strike beyond current limits of drilling.

2021年在喬斯目標區鑽了五個洞。BT21-237D、BT21-238D和BT21-240D孔均在PCSZ內交叉成礦。由於鑽探條件困難,BT21-236D和BT21-239DB孔在礦化後第三系巖石中與PCSZ相交之前被廢棄。然而,BT21-239DB鑽孔在Joss地區礦化的容礦巖石黃夾克組的變質沉積中與斷裂控制的絹雲母蝕變相交。地球化學分析證實,在該洞遇到意外的礦後斷層之前,存在弱異常的金和砷的值,該斷層可能取代了該地區Joss礦化的延續。雖然目前尚不清楚礦化的方向和數量,但這一結果表明,礦化可能會沿着走向向南延伸,超出目前的鑽探極限。

The PCSZ is the main structure which hosted mineralization exploited by the previous Beartrack mining operation and, as such, Joss is close to existing infrastructure including powerlines, roads, and other site facilities.

PCSZ是承載之前BearTrack採礦作業開採的礦化的主要結構,因此,Joss靠近現有的基礎設施,包括輸電線、道路和其他場地設施。

Detailed results for hole BT21-240D, released today, along with results previously released for adjacent drill holes BT21-237D and BT21-238D, are presented in the table below:

下表列出了今天發佈的BT21-240D孔的詳細結果,以及之前發佈的相鄰鑽孔BT21-237D和BT21-238D的結果:

Hole Number
Area
Azimuth
(deg.)
Dip
(deg.)
From
(m)

To
(m)


Drilled
Width
1
(m)

Un-Cut
Fire Assay
Gold Grade

(g/t)
BT21-237D2 Joss 293 -62 264.0 267.3 3.4 2.98
        317.9 331.6 13.7 1.16
        343.3 427.9 84.6 2.67
Incl.       354.4 356.9 2.5 11.79
Incl.       376.6 380.4 3.7 4.17
Incl.       388.4 392.6 4.2 4.14
Incl.       404.8 426.0 21.1 3.80
Incl.       420.2 426.0 5.8 5.36
BT21-238D2 Joss 291 -50 355.9 359.2 3.4 2.67
        392.9 398.1 5.2 1.83
        415.0 465.1 50.0 2.84
Incl.       431.0 465.1 34.1 3.65
Incl.       435.4 441.4 6.0 6.79
Incl.       436.0 437.2 1.2 10.80
Incl.       446.0 447.2 1.2 12.60
BT21-240D Joss 318 -61 290.1 291.7 1.6 8.21
Incl.       290.1 290.9 0.9 14.25
        303.7 306.8 3.1 1.35
        352.5 357.4 4.8 1.16
        371.7 482.9 110.6 4.34
Incl.       375.1 386.8 11.8 8.85
Incl.       378.2 383.1 5.0 13.95
        437.4 455.1 17.7 10.88
Incl.       441.4 455.1 13.7 11.96
孔數
面積
方位角
(度)
浸出
(度)
從…
(m)


(m)


鑽透
寬度
1
(m)

未切割
火災檢測
黃金等級

(克/噸)
BT21-237D2 喬斯 293 -62 264.0 267.3 3.4 2.98
317.9 331.6 13.7 1.16
343.3 427.9 84.6 2.67
包括 354.4 356.9 2.5 11.79
包括 376.6 380.4 3.7 4.17
包括 388.4 392.6 4.2 4.14
包括 404.8 426.0 21.1 3.80
包括 420.2 426.0 5.8 5.36
BT21-238D2 喬斯 291 -50 355.9 359.2 3.4 2.67
392.9 398.1 5.2 1.83
415.0 465.1 50.0 2.84
包括 431.0 465.1 34.1 3.65
包括 435.4 441.4 6.0 6.79
包括 436.0 437.2 1.2 10.80
包括 446.0 447.2 1.2 12.60
BT21-240D 喬斯 318 -61 290.1 291.7 1.6 8.21
包括 290.1 290.9 0.9 14.25
303.7 306.8 3.1 1.35
352.5 357.4 4.8 1.16
371.7 482.9 110.6 4.34
包括 375.1 386.8 11.8 8.85
包括 378.2 383.1 5.0 13.95
437.4 455.1 17.7 10.88
包括 441.4 455.1 13.7 11.96

        
1 True widths for BT21-237D and BT21-240D are estimated to be between 35% and 45% of drilled width. True width for BT21-238D is estimated to be between 55% and 65% of drilled width. Numbers may not add up due to rounding.
2 Results released previously. See Revival Gold press releases dated August 5th, 2021 and September 7th, 2021.


1BT21-237D和BT21-240D的真實寬度估計在鑽井寬度的35%到45%之間。BT21-238D的真實寬度估計在鑽井寬度的55%到65%之間。由於四捨五入,數字可能不會相加。
2之前公佈的結果。參見日期為8月5日的復興黃金新聞稿、2021年和9月7日, 2021.

The Joss Target

神像目標

Mineralization was discovered in the Joss area in 1991 by FMC Gold Company. Eight shallow reverse circulation holes were drilled that year, confirming the presence of mineralization with hole L007 intersecting 1.52 g/t gold over 30.5 meters beginning at 50 meters down hole depth, including 4.6 g/t gold over 3 meters.  

年在喬斯地區發現了礦化。1991年由FMC黃金公司。當年鑽了8個淺的反循環孔,證實了礦化的存在,L007孔從井下50米開始,與30.5米以上的1.52g/t金相交,其中4.6g/t金在3米以上。

Since 1997, 21 core holes totaling 8,420 meters have been completed over more than one kilometer of strike in the Joss area. All eighteen holes that intersected the PCSZ encountered mineralization. Those that did not intersect the PCSZ had been abandoned prior to reaching the target.

從1997年開始,21個取心孔,共計8,420米已經完工了超過一公里的罷工在喬斯地區。所有與PCSZ相交的18個孔都遇到了礦化。那些沒有與PCSZ相交的區域在到達目標之前就被遺棄了。

Drill holes that reached the target structure at Joss intersected broad intervals of lower-grade mineralized ranging from 2-4 g/t gold containing narrower, higher-grade intervals with grades ranging from 4 -11 g/t gold over true widths of 1 – 5 meters. Higher-grade mineralization extends northward from Joss into the South Pit area and mineralization is open to the south. Mineralization at Joss has been drilled to about 500 meters depth and, like mineralization elsewhere at Beartrack, is open at depth.

到達喬斯目標結構的鑽孔相交寬區間低品位礦化從2-4克/噸黃金包含較窄的、等級較高的帶等級的區間的從4-11克/噸黃金完畢1-5米的真實寬度。高品位礦化自JOSS向北延伸至南坑區,礦化向南開放。喬斯的礦化已被鑽探到大約500米深而且,就像BearTrack其他地方的礦化一樣,深度打開。

Over the past year, Revival Gold and the Company's engineering consultants have been evaluating the potential for narrow vein and bulk underground mining and milling at Beartrack-Arnett. Potential higher-grade, underground material in the Joss and South Pit areas offers the opportunity to supplement lower-grade, open pit mill material in any potential mine plan that might be developed for the site.

在過去的一年裏,復興黃金公司和該公司的工程顧問一直在評估窄脈散裝地下采選在BearTrack-Arnett。Joss和South Pit地區潛在的高品位地下材料提供了在任何可能為該場地開發的潛在採礦計劃中補充低品位露天磨機材料的機會。

Underground development concepts under strategic review include conventional ramp-access supporting mechanized mining with truck haulage and long hole open stoping mining methods. The narrower, higher-grade zones could potentially support mining rates in the range of 1,000 tonnes/day to 2,000 tonnes/day, while the lower-grade, bulk mining areas could potentially support mining rates in the range of 2,000 tonnes/day to 4,000 tonnes/day. The sub-vertical orientation of the mineralized zone and continuity along strike are favorable attributes for underground productivity. Geotechnical logging of the diamond drill core is assisting with evaluating rock stability design considerations.

正在進行策略性檢討的地下發展概念包括傳統的匝道通道配套。汽車運輸深孔空場機械化採礦法。更窄、更高品位的區域可能會潛在地支持在以下範圍內的採礦率1,000噸/天至2,000噸/天,而較低品位的散裝礦區可能會支持在以下範圍內的採礦率2,000噸/天至4,000噸/天。這個礦化帶的近垂直方向和沿走向的連續性是有利的屬性。來提高地下生產力。金剛石鑽芯的巖土工程記錄有助於評估巖石穩定性設計考慮因素。

Figure 1 below is a long section view of the Joss target area showing a preliminary interpretation of the setting and drill hole intercepts for all holes drilled at Joss to-date.

圖1下面是JOSS目標區的長截面圖,顯示了JOSS迄今鑽出的所有孔的設置和鑽孔截距的初步解釋。

A photo accompanying this announcement is available at             

隨附此公告的照片可在以下網址查閲:

QA/QC Program

QA/QC計劃

Quality Assurance/Quality Control consists of the regular insertion of certified reference materials, duplicate samples and blanks into the sample stream. Check samples are submitted to an umpire laboratory at the end of the drilling program. Sample results are analyzed immediately upon receipt and all discrepancies are investigated. Samples are submitted to the ALS Geochemistry sample preparation facility in Twin Falls, Idaho. Gold analyses are performed at the ALS Geochemistry laboratory in Reno, Nevada or Vancouver, British Columbia, and multi-element geochemical analyses are completed at the ALS Minerals laboratory in Vancouver, British Columbia. ALS Minerals is an ISO/IEC 17025:2017 accredited lab.

質量保證/質量控制包括定期向樣品流中插入經過認證的標準物質、重複樣品和空白。檢查樣本在鑽井程序結束時提交給裁判實驗室。樣品結果在收到後立即進行分析,並對所有差異進行調查。樣品被提交給愛達荷州雙子瀑布的ALS地球化學樣品製備設施。金分析在內華達州里諾或不列顛哥倫比亞省温哥華的ALS地球化學實驗室進行,多元素地球化學分析在不列顛哥倫比亞省温哥華的ALS Minerals實驗室完成。ALS Minerals是國際標準化組織/國際電工委員會17025:2017年認證的實驗室。

Gold assays are determined on samples consisting of half drill core by fire assay and AAS on a 30-gram nominal sample weight (Au-AA23) for Beartrack, and Fire Assay and AAS on a 50-gram nominal sample weight (Au-AA24) for Arnett. For shallow holes, targeting leachable mineralization, gold is also determined by cyanide leach with an AAS finish on a nominal 30-gram sample weight (Au-AA13). Multi element geochemical analyses are completed on selected drill holes using the ME-MS 61M method.

BearTrack採用火試金法,AAS法測定30克標稱樣品重量(Au-aa23),Arnett採用50克標稱樣品重量(Au-AA24),採用火試金法和原子吸收光譜法測定金含量。對於以可浸出礦化為目標的淺孔,金也是通過氰化浸出,以標稱30克樣品重量(Au-AA13)進行原子吸收光潔度測定的。用ME-MS 61M方法對選定的鑽孔進行多元素地球化學分析。

Qualified Person

合格人員

Steven T. Priesmeyer, C.P.G., Vice President Exploration, and Rodney A. Cooper, P.Eng., a QP and a consultant to Revival Gold Inc., are the Company's designated Qualified Persons for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects and have reviewed and approved its scientific and technical content.

勘探副總裁Steven T.Priesmeyer和Revival Gold Inc.的QP兼顧問Rodney A.Cooper,P.eng是本新聞稿的指定合格人員,符合National Instrument 43-101礦產項目披露標準,並已審查和批准了其科學技術含量。

About Revival Gold Inc.

關於復興黃金公司

Revival Gold Inc. is a growth-focused gold exploration and development company. The Company is advancing the Beartrack-Arnett Gold Project located in Idaho, USA.

Revival Gold Inc.是一家專注於增長的黃金勘探和開發公司。該公司正在推進位於美國愛達荷州的BearTrack-Arnett黃金項目。

Beartrack-Arnett is the largest past-producing gold mine in Idaho. A Preliminary Economic Assessment has been completed for a first phase restart of heap leach operations to produce 72,000 ounces of gold per year over an initial seven-year mine life at an AISC of $1,057 per ounce of gold. Meanwhile, exploration continues, focused on expanding the current Indicated Mineral Resource of 36.6 million tonnes at 1.15 g/t gold containing 1.36 million ounces of gold and Inferred Mineral Resource of 47.1 million tonnes at 1.08 g/t gold containing 1.64 million ounces of gold. The mineralized trend at Beartrack extends for over five kilometers and is open on strike and at depth. Mineralization at Arnett is open in all directions.

BearTrack-Arnett是愛達荷州最大的過去生產的金礦。堆浸作業第一階段重啟的初步經濟評估已完成,在最初七年的礦山壽命內每年生產72,000盎司黃金,AISC為每盎司黃金1,057美元。與此同時,勘探仍在繼續,重點是擴大目前指示礦產資源量3,660萬噸,含黃金1.15克/噸,含黃金136萬盎司;推斷礦產資源量4,710萬噸,含金1.08g/噸,含金164萬盎司。BearTrack的礦化趨勢延伸超過5公里,在走向和深度上都是開放的。阿內特的礦化是四面八方開放的。

For further details, including key assumptions, parameters and methods used to estimate the Mineral Resources, and data verification, please see the Company's NI 43-101 compliant technical report titled, "Preliminary Economic Assessment of the Heap Leach Operation on the Beartrack Arnett Gold Project, Lemhi County, Idaho, USA – NI 43-101 Technical Report", dated December 17th, 2020.

有關更多細節,包括用於估算礦產資源量的主要假設、參數和方法,以及數據驗證,請參閲該公司12月17日發佈的符合NI 43-101標準的技術報告,標題為《美國愛達荷州萊米縣BearTrack Arnett金礦項目堆浸作業的初步經濟評估-NI 43-101技術報告》(NI 43-101 Technology Report),標題為《美國愛達荷州萊姆希縣BearTrack Arnett金礦項目堆浸作業的初步經濟評估--NI 43-101技術報告》, 2020.

Revival Gold has approximately 71.4 million shares outstanding and had a cash balance of C$3 million on September 30th, 2021. Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at www.revival-gold.com or on SEDAR at www.sedar.com.

Revival Gold擁有約7140萬股流通股,截至2021年9月30日的現金餘額為300萬加元。更多信息,包括公司的財務報表、技術報告、新聞稿和其它信息,請訪問www.revival-gold.com或訪問SEDAR網站www.sedar.com。

For further information, please contact:

如需更多信息,請聯繫:

Hugh Agro, President & CEO or Lisa Ross, CFO         
Telephone: (416) 366-4100 or Email: info@revival-gold.com

休·阿格羅,總裁兼首席執行官或麗莎·羅斯,首席財務官
電話:(416)366-4100或電子郵件:info@revival-gold.com

Cautionary Statement

警示聲明

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. Technical information in this news release has been reviewed and approved by Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., and Mr. Rodney A. Cooper, P.Eng., a consultant to the Company, Qualified Persons within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所創業板政策中定義)均不對本新聞稿的充分性或準確性承擔責任。本新聞稿中的技術信息已由Revival Gold Inc.勘探副總裁Steven T.Priesmeyer,C.P.G.和公司顧問Rodney A.Cooper,P.Eng,National Instrument 43-101所指的合格人員審查和批准-礦產項目信息披露標準.

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company, or management, expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's intentions regarding its objectives, goals or future plans and statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, the Company's ability to predict or counteract the potential impact of COVID-19 coronavirus on factors relevant to the Company's business, failure to identify additional mineral resources, failure to convert estimated mineral resources to reserves with more advanced studies, the inability to eventually complete a feasibility study which could support a production decision, the preliminary nature of metallurgical test results may not be representative of the deposit as a whole, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新聞稿包括一些不包含歷史事實的“前瞻性陳述”。前瞻性陳述包括描述公司未來計劃、目標或目標的估計和陳述,包括公司或管理層預計將出現的情況或結果。前瞻性陳述可以用“相信”、“預期”、“預期”、“估計”、“可能”、“將”或“計劃”等術語來識別。由於前瞻性陳述基於假設,涉及未來的事件和條件,因此它們本身就包含固有的風險和不確定因素。雖然這些陳述是基於公司目前掌握的信息,但公司不能保證實際結果符合管理層的期望。前瞻性信息涉及的風險、不確定性和其他因素可能導致實際事件、結果、業績、前景和機會與此類前瞻性信息明示或暗示的情況大不相同。本新聞稿中的前瞻性信息包括但不限於公司對其目標、目標或未來計劃和聲明的意圖。可能導致實際結果與前瞻性信息大不相同的因素包括但不限於:公司預測或抵消新冠肺炎冠狀病毒對與公司業務相關因素的潛在影響的能力、未能確定更多的礦產資源、未能通過更深入的研究將估計的礦產資源轉換為儲量、未能最終完成可能支持生產決策的可行性研究、冶金測試結果的初步性質可能不能代表整個礦牀。, 這些風險包括:獲得或未能獲得所需的政府、環境或其他項目批准的延遲或失敗;政治風險;與未來所需融資的可獲得性和成本有關的不確定性;股票市場的變化;通貨膨脹;匯率變化;大宗商品價格波動;項目開發的延遲、資本、運營和回收成本與估計相差甚遠;礦產勘探和開發行業涉及的其他風險;以及公司在提交給SEDAR的公開文件中陳述的那些風險。儘管公司認為在準備本新聞稿中的前瞻性信息時使用的假設和因素是合理的,但不應過度依賴這些信息,因為這些信息僅適用於本新聞稿發佈之日,並且不能保證此類事件將在披露的時間框架內發生或根本不會發生。除法律要求外,公司沒有任何更新或修改任何前瞻性信息的意圖或義務,無論是由於新信息、未來事件或其他原因。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論