share_log

Expro Signs Technology Agreement With Petrobras For Development Of New Non-intrusive Flowmeter

Benzinga ·  Dec 12, 2024 19:31

The key requirement in this technology development is the non-intrusive aspect of the clamp-on design, as well as the absence of any radioactive source. The first prototype is expected to be installed by Q3 2027.

The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment