share_log

Eighth Commissioning of PEPE 6

Pampa Energia ·  Nov 20, 2024 21:00

Eighth commissioning of PEPE 6


Buenos Aires, November 21, 2024. Pampa Energía S.A. ('Pampa' or the 'Company'; NYSE: PAM; ByMA: PAMP) announces that today, the last wind turbine of PEPE 6 was commissioned by CAMMESA, with a capacity of 4.5 MW, totaling a capacity of 139.5 MW

For more information, please contact:

Gustavo Mariani – CEO

Nicolás Mindlin – CFO

Lida Wang – Investor relations and sustainability officer – investor@pampa.com

Josefina Espinosa Paz – Press officer – prensa@pampa.com

The Pampa Energía Building

Maipú 1, (C1084ABA), Buenos Aires, Argentina

Phone: +54 (11) 4344 6000

ri.pampa.com/en

The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment