High-grade mineralised intercepts including 100.5 m at 1.62% Li2O from in-fill drilling at the cornerstone CV5 Deposit, plus extensive geotechnical and hydrogeological drill programs completed supporting the Feasibility Study
VANCOUVER, BC, Nov. 26, 2024 /PRNewswire/ - November 27, 2024 – Sydney, Australia
Highlights