Gelonghui November 5th | Zhejiang Three Stars New Materials (603578.SH) stated on the interactive platform that its controlling subsidiary China Best Jintai (Shandong) New Materials Technology Co., Ltd. is investing in the construction of the "4×1200 tons/day photovoltaic glass, with an annual output of 5 million tons of high-purity silicon-based new materials purification project", which is divided into two phases. Phase one of the project includes two kilns for photovoltaic glass, A and B. B kiln was ignited for trial production in August 2024, and sales revenue had been generated within the third quarter of 2024; the main body construction of A kiln is basically completed, and the ignition and start of production will be determined based on industry market conditions.
三星新材(603578.SH):A窑主体工程建设基本完成,将根据行业市场情况决定点火投产时间
Zhejiang Three Stars New Materials (603578.SH): The main body engineering & construction of A kiln is basically completed, and the ignition and production time will be determined according to industry market conditions.
The translation is provided by third-party software.
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.