unittec co.,ltd. (000925.SZ) announced that the company recently received a tender offer from Chengdu Rail Transit Group Co., Ltd. ...
Zhonghe Technology (000925.SZ) announced that the company recently received the "Winning Notice" (Number: Railway Group 中[2024]029) sent by Chengdu Rail Transit Group Co., Ltd. (the bidding unit), confirming that the consortium formed by the company and its holding subsidiary Chengdu Zhonghe Digital Rail Technology Co., Ltd. won the "Chengdu Metro Line 2 Signal System Onboard Subsystem Mid-term Maintenance Project", with a symbol amount of 0.157 billion RMB.
Project Overview: The project involves replacing the remaining signal onboard equipment of the 60 trains (201-260) on Line 2, including onboard controllers, racks, cages, speed positioning equipment, driver displays, beacon readers, positioning antennas, and other equipment and cables. The project scope includes but is not limited to equipment supply, removal of existing equipment and installation of new equipment, equipment debugging, software debugging, signal system debugging, EMU debugging, comprehensive debugging, interface debugging, and other relevant work required by the bidder.