Elephant Future (02309.HK) announced that its indirect non-wholly-owned subsidiary BCFC has entered into a construction contract with a contractor. Based on this, the contractor agreed to carry out and complete the project in the stadium according to the contract amount of 6.85 million British pounds (equivalent to about 68.2 million Hong Kong dollars).
The architecture engineering project includes the renovation and construction of reception suites, VIP rooms, corporate boxes, fan zones connecting boxes, and multi-functional halls; as well as the expansion and renovation of offices located in the Kop stand of the stadium, including machinery modification and installation, and the design and construction of dining facilities.