share_log

大象未来集团(02309.HK)附属订立有关修缮球场基础设施建筑合约

ZO Future Group (02309.HK) subsidiary signs contract for repair and construction of stadium infrastructure

Gelonghui Finance ·  Jul 4 19:32

On July 4th, Grovesnor announced that its indirect non-wholly owned subsidiary BCFC signed a construction contract with the contractor to conduct and complete the project at the stadium according to the contract amount of 6.85 million British pounds in 2024.

The stadium refers to the land and buildings located at Cattell Road, Birmingham, B9 4NH, United Kingdom, St. Andrew's @ Knighthead Park.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment