share_log

中海油(00883.HK)恩平21-4油田開發項目投產 料明年高峰日產5,300桶油當量

CNOOC's (00883.HK) Enping 21-4 oil field development project is expected to produce a peak of 5,300 barrels of oil equivalents per day next year.

AASTOCKS ·  Jun 27 16:43

CNOOC (00883.HK) has announced that the fully owned and operated Enping 21-4 oil field development project has started production. It is expected that the daily peak production will reach about 5,300 barrels of oil equivalent by next year, and the oil product is light crude oil.

The company stated that the project is located in the eastern South China Sea, with an average depth of about 89 meters. In order to improve the efficiency of oilfield development, it will mainly rely on the existing production facilities and use 2 ultra-large displacement wells based on the existing platform for development. The maximum well depth is over 9,500 meters, and it is expected to be a reference for similar oil and gas field projects in the future.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment