Power Construction Corporation of China, Ltd. (601669.SH) announced that its subsidiary, China Electric Power Construction Group Central and Southern Survey and Design Institute...
China Power Construction Corporation (601669.SH) announced that its subsidiary, China Electric Power Construction Group Central and Southern Survey and Design Institute, along with China Water Resources and Hydropower Eighth Engineering Bureau Co., Ltd. and China Water Resources and Hydropower Seventh Engineering Bureau Co., Ltd. formed a joint venture and won the EPC general contracting project of the Chenshan Pumped Storage Power Station in Chenxi County, Hunan Province. The contract amount is approximately RMB 5.306 billion. The total construction period is preliminarily set for 2284 calendar days.