share_log

乐山电力(600644.SH):龙泉驿区电化学储能电站项目被列为四川省新型储能示范项目

Leshan Electric Power (600644.SH): Longquanyi electrochemical energy storage power station project has been listed as a new energy storage demonstration project in Sichuan Province.

Zhitong Finance ·  Jun 7 17:05

Leshan Electric Power (600644.SH) has released an announcement. The company recently received a notice from the Sichuan Development and Reform Commission and the Sichuan Energy Bureau regarding the work related to the new energy storage demonstration project (Chuan Fa Gai Neng Yuan [2024] No. 226). In order to give full play to the role of demonstration and leading, promote the diversified and high-quality development of new energy storage, the Sichuan Development and Reform Commission and the Sichuan Energy Bureau organized the application and selection work of new energy storage demonstration projects.

Leshan Electric Power (600644.SH) has released an announcement. The company recently received a notice from the Sichuan Development and Reform Commission and the Sichuan Energy Bureau regarding the work related to the new energy storage demonstration project (Chuan Fa Gai Neng Yuan [2024] No. 226). In order to give full play to the role of demonstration and leading, promote the diversified and high-quality development of new energy storage, the Sichuan Development and Reform Commission and the Sichuan Energy Bureau organized the application and selection work of new energy storage demonstration projects.

According to the application by the project unit, after review and public announcement by the Sichuan Development and Reform Commission and the Sichuan Energy Bureau, the 'Leshan Electric Power Longquanyi District 100MW/200MWh electrochemical energy storage power station' project and other projects have been listed as new energy storage demonstration projects in Sichuan Province. The notice requires that the demonstration projects be implemented strictly according to the application plan, and the electrochemical energy storage project must be built and connected to the grid within 12 months from the date of the notice.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment