share_log

Westlake Plans To Build New Molecular-Oriented Polyvinyl Chloride Pipe Plant At Its Manufacturing Site In Wichita Falls, Texas

Benzinga ·  May 23 18:16

The expansion plan includes the addition of a 190,000 square-foot facility to the existing site situated at 3348 Industrial Drive, leveraging the region's strategic geographic location in the heart of the United States. Construction is currently slated to begin by the end of 2024.

The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment