share_log

知情人士称由于北美市场对电动汽车的需求放缓日产汽车公司已推迟开发两款将在美国生产的电动轿车车型。日产曾在2022年表示将斥资5亿美元开发两款电动轿车并于2025年开始在密西西比州坎顿的工厂组装。(界面新闻)

People familiar with the matter say Nissan has postponed the development of two electric sedan models to be manufactured in the US due to a slowdown in demand for electric vehicles in the North American market. Nissan said in 2022 that it would spend $500

Zhitong Finance ·  May 23 10:05
People familiar with the matter say Nissan has postponed the development of two electric sedan models to be manufactured in the US due to a slowdown in demand for electric vehicles in the North American market. Nissan said in 2022 that it would spend $500 million to develop two electric sedans and begin assembly at its Canton, Mississippi plant in 2025. (interface news)

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment