share_log

Plug Power Signed Two Additional Contracts To Deliver Basic Engineering And Design Packages For Projects In Europe, US

Benzinga ·  Apr 25 19:42

These agreements enhance Plug's overall BEDP portfolio, bringing the company's total amount of global BEDP contracts to 4.5 gigawatts (GW).

Currently, 50MW of Plug's electrolyzers have been put into operations, and by the end of this year, Plug is expected be the largest provider of PEM technology operating in the world.

The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment