share_log

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O Over 15m, Incl. 2.31% Li2O Over 8m; 1.15% Li2O Over 19m, Incl. 1.67% Li2O Over 10m, and 1.32% Li2O Over 14m

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O Over 15m, Incl. 2.31% Li2O Over 8m; 1.15% Li2O Over 19m, Incl. 1.67% Li2O Over 10m, and 1.32% Li2O Over 14m

Lithium Ionic 擴大了薩利納斯新發現的區域;在 1500 萬美元以上鑽探 1.53% 的氧化鋰,其中超過 800 萬英鎊鑽探 2.31% 的Li2O;超過 1900 萬噸的 1.15% Li2O,包括 1.67% 的 Li2O 超過 1000 萬個,以及 1.32% 的 Li2O
GlobeNewswire ·  04/23 19:00
  • Excellent follow-up drill results from high-grade discovery holes at the "Noé" target announced in February 2024, including:
    • 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m
    • 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m
    • 1.32% Li2O over 14m, incl. 2.16% Li2O over 7m
  • The Noé target, located ~1.5km north of the mineral resource area, was not included in the NI 43-101 estimate announced on April 4, 2024
  • Salinas currently hosts a 14.76Mt lithium deposit, or 25% of the Company's total global mineral resource estimate of 60.1Mt
  • Noé represents potential for significant future mineral growth at Salinas
  • 2024 年 2 月宣佈的 “Noé” 目標高品位發現孔的後續鑽探結果非常出色,包括:
    • 1500萬以上的 1.53% Li2O,包括超過 800 萬的 2.31% Li2O
    • 1.15% 超過 1900 萬的 Li2O,包括 1.67% 超過 1000 萬的 Li2O
    • 1.32% Li2O 超過 1400 萬個,包括 2.16% 的 Li2O 超過 700 萬個
  • 諾埃目標位於礦產資源區以北約1.5公里處,未包含在2024年4月4日公佈的北愛爾蘭43-101估計中
  • 薩利納斯目前擁有14.76萬噸鋰礦牀,佔該公司估計的全球礦產資源總量6,01萬噸的25%
  • Noeé 代表着薩利納斯未來礦產大幅增長的潛力

TORONTO, April 23, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company") reports assay results from the Salinas Lithium Project ("Salinas"), located approximately 100 kilometres north of its Feasibility-stage Bandeira lithium project and the Outro Lado lithium deposit in northern Minas Gerais State, Brazil. Nine of the 15 holes reported were drilled at the Noé target, a well-mineralized pegmatite discovered approximately 1.5 kilometres North of the Salinas mineral resource zones earlier this year.

多倫多,2024年4月23日(GLOBE NEWSWIRE)——鋰離子公司(TSXV:LTH;OTCQX:LTHCF;FSE:H3N)(“Lithium Ionic” 或 “公司”)報告了薩利納斯鋰項目(“薩利納斯”)的化驗結果,該項目位於其可行性階段的Bandeira鋰項目和Outro Lado鋰礦牀以北約100公里處巴西米納斯吉拉斯州北部。報告的15個鑽孔中有9個是在諾埃目標鑽探的,這是今年早些時候在薩利納斯礦產資源區以北約1.5公里處發現的一種礦化良好的偉晶岩。

Salinas Noé Target Highlights:

Salinas Noé的目標亮點:

  • New high-grade drill intercept highlights of:
    • 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m near surface, from 30m (hole BGDD-24-133)
    • 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m near surface, from 38m (hole BGDD-24-131)
    • 1.32% Li2O over 14m, incl. 2.16% Li2O over 7m near surface, from 19.7m (hole BGDD-24-140)
    • 1.44% Li2O over 10.2m (hole BGDD-24-135)
    • 1.26% Li2O over 7.5m (hole BGDD-24-129)
    • 1.24% Li2O over 7m (hole BGDD-24-130)
    • 1.61% Li2O over 5m (hole BGDD-24-142)
  • 新的高等級鑽探截擊亮點有:
    • 1500米以上爲1.53%的Li2O,包括近地表8米處的2.31%的Li2O,來自3000米 (洞 BGDD-24-133)
    • 1.15% Li2O 超過 19m,包括 1.67% Li2O 在地表附近 1000 米處,來自 380m (洞 BGDD-24-131)
    • 1400萬以上的Li2O爲1.32%,包括近地表7m以上的2.16%的Li2O,來自1,970萬英寸 (洞 BGDD-24-140)
    • 1.44% Li2O 超過 1,020 萬 (洞 BGDD-24-135)
    • 1.26% Li2O 超過 750 萬 (洞 BGDD-24-129)
    • 700萬以上的 1.24% Li2O (洞 BGDD-24-130)
    • 500萬以上的 1.61% Li2O (洞 BGDD-24-142)
  • Latest results returned higher grades and larger widths than discovery holes announced February 6, 2024, listed below, underscoring the excellent growth potential of this mineral zone with planned future drilling.
    • 1.63% Li2O over 5.6m (hole BGDD-23-127)
    • 1.28% Li2O over 3.6m and 1.54% Li2O over 4.0m (hole BGDD-23-126)
  • 最新結果顯示,與2024年2月6日公佈的發現孔相比,其品位更高,寬度更大,如下所列,這突顯了該礦區在未來計劃鑽探中的出色增長潛力。
    • 1.63% Li2O 超過 560 萬 (洞 BGDD-23-127)
    • 超過 360 萬的 1.28% Li2O 和超過 400 萬的 1.54% Li2O (洞 BGDD-23-126)
  • The Noé target, located ~1.5km north of the mineral resource area, was not included in the NI 43-101 estimate announced on April 4, 2024
  • Salinas currently hosts a 14.76Mt lithium deposit, or 25% of the Company's total global mineral resource estimate of 60.1Mt*
    *See press release dated April 12, 2024, for details related to the Bandeira MRE (effective date of January, 10, 2024; QP: Carlos Silva of GE21); See press release dated April 4, 2024 for details related to the Salinas MRE (effective date of January 4, 2024; QP: Leonardo Soares, P.Geo., M.Sc., of GE21); and the NI 43-101 compliant technical reports related to the Outro Lado deposit titled "Mineral Resource Estimate for Lithium Ionic, Itinga Project" (effective date of June 24, 2023; authored by Maxime Dupéré, B. Sc., P.Geo. and Faisal Sayeed, B. Sc., P.Geo).
  • 諾埃目標位於礦產資源區以北約1.5公里處,未包含在2024年4月4日公佈的北愛爾蘭43-101估計中
  • 薩利納斯目前擁有14.76萬噸鋰礦牀,佔該公司估計的全球礦產資源總量6,010萬噸的25%*
    *有關Bandeira MRE(生效日期爲2024年1月10日;QP:GE21的卡洛斯·席爾瓦)的相關詳情,請參閱2024年4月12日的新聞稿;與Salinas MRE(生效日期爲2024年1月4日;QP:GE21的Leonardo Soares,P.Geo.,理學碩士)相關的詳細信息,請參閱2024年4月4日的新聞稿;與NI 43-101兼容的技術報告 Outro Lado礦牀,標題爲 “伊廷加鋰離子項目的礦產資源估算”(生效日期爲2023年6月24日;由馬克西姆·杜佩雷,理學學士,P.Geo. 和理學學士學位費薩爾·賽義德撰寫,P.Geo.)。

Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, "These new high-grade results from the Noé target are very exciting and support GE21's view that this zone could meaningfully contribute to the mineral growth at Salinas. Interpreted as a northeast extension of the historically significant 'Lavra do Zoe' pegmatite, which has been mined for spodumene intermittently over several decades, Noé offers a potential path to substantially scale this deposit. With a PEA already underway for the initial resource announced earlier this month, we are increasingly confident that Salinas will continue to represent a cornerstone asset in our portfolio."

Lithium Ionic 首席執行官 P.Geo. Blake Hylands 表示, “Noe'目標的這些新的高品位結果非常令人興奮,並支持了GE21的觀點,即該區域可以爲薩利納斯的礦產增長做出有意義的貢獻。諾埃被解釋爲具有重要歷史意義的 “Lavra do Zoe” 偉晶岩的東北延伸,該偉晶岩幾十年來一直間歇性地開採鋰輝石,它爲大幅擴大該礦牀規模提供了潛在途徑。隨着本月早些時候宣佈的初始資源的PEA已經在進行中,我們越來越有信心Salinas將繼續成爲我們投資組合中的基石資產。”

Lithium Ionic acquired the Salinas group of properties in early 2023 from Neolit Minerals Participações Ltda. ("Neolit"; see press release dated March 13, 2023) and began drilling the area in May 2023. On April 4, 2024, the Company announced an initial NI 43-101 compliant mineral resource estimate ("MRE") at Salinas of 14.76Mt based on 122 drill holes (27,030m) drilled between May and November 2023. GE21, who completed the Salinas MRE, has been engaged to complete a Preliminary Economic Assessment ("PEA"), which is expected for completion in H2 2024.

Lithium Ionic 於 2023 年初從 Neolit Minerals Participaces Ltda 手中收購了薩利納斯集團的房產。(“Neolit”;參見2023年3月13日的新聞稿),並於2023年5月開始在該地區進行鑽探。2024年4月4日,該公司宣佈,根據2023年5月至11月期間鑽探的122個鑽孔(27,030米),薩利納斯的初步礦產資源估算(“MRE”)爲1476萬噸,符合北愛爾蘭43-101標準。完成薩利納斯地震風險評估的GE21已受聘完成初步經濟評估(“PEA”),該評估預計將於2024年下半年完成。

While completing the MRE for Salinas, GE21 analyzed the initial drill holes conducted at the Noé target, which were located outside of the mineral resource area, and identified a strong potential for Noé to contribute 10-15Mt* in the near-term with additional drilling. The results announced today support this view, and the Company intends to continue exploration work at Salinas for the remainder of 2024 to continue to expand and upgrade the mineral resources. An upgraded MRE for Salinas is expected later this year.

在完成薩利納斯MRE的過程中,GE21分析了在礦產資源區以外的Noeé目標處進行的初始鑽孔,並確定Noe'在短期內通過額外鑽探有可能貢獻10-15Mt*的巨大潛力。今天公佈的結果支持了這一觀點,該公司打算在2024年剩餘時間內繼續在薩利納斯進行勘探工作,以繼續擴大和升級礦產資源。預計今年晚些時候將對薩利納斯的 MRE 進行升級。

*The potential quantity of the lithium mineralization at the Noé target is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource or Reserve and it is uncertain if further exploration will confirm the target ranges.

*Noé目標的鋰礦化潛在數量本質上是概念性的,勘探不足以估算礦產資源或儲量,也不確定進一步的勘探能否確認目標範圍。


Figure 1. Salinas Lithium Project Location & New Drill Intercept Highlights


圖 1。薩利納斯鋰業項目位置和新鑽探截獲亮點

View Figure 1 here:

在此處查看圖 1:


Figure 2. Core Photos, Holes BGDD-24-131 and BGDD-24-133


圖 2。核心照片,空洞 BGDD-24-131 和 BGDD-24-133

View Figure 2 here:

在此處查看圖 2:

Table 1. Salinas Drill Results

表 1。薩利納斯鑽探結果

Hole ID Az Dip From To Metres Li2O (%)
BGDD-23-128 310 -60 98.05 99.80 1.75 0.49
BGDD-24-129 310 -65 204.60 212.05 7.45 1.26
BGDD-24-130 310 -60 83.20 90.20 7.00 1.24
BGDD-24-131 310
-60
37.95 56.95 19.00 1.15
including 37.95 47.95 10.00 1.67
BGDD-24-132 130 -85 252.00 255.00 3.00 2.16
BGDD-24-133 310
-75
30.27 45.27 15.00 1.53
including 30.27 38.27 8.00 2.31
BGDD-24-134 340 -50 144.80 147.89 3.09 1.01
BGDD-24-135 310 -75 181.88 192.07 10.19 1.44
BGDD-24-136 310 -75 nsr
BGDD-24-137 310
-60
173.55 174.55 1.00 1.29
and 287.47 289.71 2.24 1.19
BGDD-24-139 310 -60 169.53 173.42 3.89 1.24
BGDD-24-140 310
-60
19.70 33.70 14.00 1.32
incl 19.70 26.70 7.00 2.16
BGDD-24-141 310
-60
93.25 95.30 2.05 0.95
and 162.38 164.45 2.07 0.63
and 183.17 189.17 6.00 0.84
and 249.43 253.43 4.00 1.15
BGDD-24-142 130 -70 31.62 36.62 5.00 1.61
BGDD-24-143 310
-70
62.08 64.65 2.57 0.90
and 74.60 75.60 1.00 0.98
洞 ID Az 來自 Li2O (%)
BGDD-23-128 310 -60 98.05 99.80 1.75 0.49
BGDD-24-129 310 -65 204.60 212.05 7.45 1.26
BGDD-24-130 310 -60 83.20 90.20 7.00 1.24
BGDD-24-131 310
-60
37.95 56.95 19.00 1.15
包括 37.95 47.95 10.00 1.67
BGDD-24-132 130 -85 252.00 255.00 3.00 2.16
BGDD-24-133 310
-75
30.27 45.27 15.00 1.53
包括 30.27 38.27 8.00 2.31
BGDD-24-134 340 -50 144.80 147.89 3.09 1.01
BGDD-24-135 310 -75 181.88 192.07 10.19 1.44
BGDD-24-136 310 -75 nsr
BGDD-24-137 310
-60
173.55 174.55 1.00 1.29
287.47 289.71 2.24 1.19
BGDD-24-139 310 -60 169.53 173.42 3.89 1.24
BGDD-24-140 310
-60
19.70 33.70 14.00 1.32
包含 19.70 26.70 7.00 2.16
BGDD-24-141 310
-60
93.25 95.30 2.05 0.95
162.38 164.45 2.07 0.63
183.17 189.17 6.00 0.84
249.43 253.43 4.00 1.15
BGDD-24-142 130 -70 31.62 36.62 5.00 1.61
BGDD-24-143 310
-70
62.08 64.65 2.57 0.90
74.60 75.60 1.00 0.98

*BGDD-24-138 was not sampled.

*BGDD-24-138 未抽樣。

On behalf of the Board of Directors of Lithium Ionic Corp.

代表鋰離子公司董事會

Blake Hylands
Chief Executive Officer, Director

布萊克·海蘭茲
首席執行官、董事

About Lithium Ionic Corp.

關於鋰離子公司

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga and Salinas group of properties cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL's Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.'s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Lithium Ionic 是一家加拿大礦業公司,在巴西勘探和開發其鋰礦業。其伊廷加和薩利納斯集團位於米納斯吉拉斯州東北部,佔地14,182公頃,這是一個採礦友好型司法管轄區,正迅速發展成爲世界一流的硬巖鋰區。其可行性階段的Bandeira項目與CBL的Cachoeira鋰礦以及Sigma Lithium Corp位於同一地區,後者生產鋰已有30多年。”s Grota do Cirilo 項目,該項目擁有美洲最大的硬巖鋰礦牀。

Investor and Media Inquiries:

投資者和媒體查詢:

+1 647.316.2500
info@lithiumionic.com

+1 647.316.2500
info@lithiumionic.com

Quality Assurance and Control

質量保證和控制

During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

在鑽探計劃中,從 NQ 岩心中採集化驗樣本並鋸成兩半。一半被送往經過認證的獨立商業實驗室SGS實驗室進行化驗,另一半留作結果、交叉檢查和將來參考。嚴格的質量保證/質量控制計劃適用於所有樣品。每個樣品都經過乾燥處理,從75%到3毫米的粉碎,均質化,在瓊斯分成四等分,在鋼廠噴灑250至300克的樣品,95%至150%。SGS 實驗室對 ICP90A 分析進行了多元素分析。

Qualified Persons

合格人員

The technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, who are both "qualified persons" as defined in NI 43-101.

本新聞稿中的技術信息已經過鋰離子勘探副總裁卡洛斯·科斯塔和鋰離子公司首席執行官兼董事布萊克·海蘭茲的審查和批准,他們都是NI 43-101中定義的 “合格人員”。

Investor and Media Inquiries:

投資者和媒體查詢:

+1 647.316.2500
info@lithiumionic.com

+1 647.316.2500
info@lithiumionic.com

Cautionary Note Regarding Forward-Looking Statements

關於前瞻性陳述的警示說明

This press release contains statements that constitute "forward-statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of Salinas and the Company's other mineral properties, the economic viability of the Bandeira project, the mineralization and development of the Company's mineral properties, the Company's exploration program and other mining projects and prospects thereof, the Company's ability to complete a PEA, the Company's ability to complete an updated NI 43-101 mineral resource estimate for Salinas, the Company's ability to complete an environmental impact assessment and obtain the requisite permitting and approvals and the Company's future plans. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

本新聞稿包含構成 “前瞻性陳述” 的聲明。此類前瞻性陳述涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致公司的實際業績、業績或成就或發展與此類前瞻性陳述所表達或暗示的預期業績、業績或成就存在重大差異。儘管公司認爲,根據其高管和董事的經驗、當前的狀況和預期的未來發展以及其他被認爲適當的因素,這些前瞻性信息中反映的預期是合理的,但不應過度依賴這些預期,因爲公司無法保證這些預期會被證明是正確的。在本新聞稿中使用時,“估計”、“項目”、“信念”、“預測”、“打算”、“期望”、“計劃”、“預測”、“可能” 或 “應該” 等詞語的否定詞或其中的此類變體或類似術語旨在識別前瞻性陳述和信息。本新聞稿中的前瞻性陳述和信息包括與薩利納斯和公司其他礦產的前景、Bandeira項目的經濟可行性、公司礦產的礦化和開發、公司的勘探計劃和其他採礦項目及其前景、公司完成PEA的能力、公司完成薩利納斯NI 43-101最新礦產資源估算的能力、公司的能力對環境造成影響評估並獲得必要的許可和批准以及公司的未來計劃。此類陳述和信息反映了公司當前的觀點。可能導致實際結果與這些前瞻性陳述和信息中設想的結果存在重大差異的風險和不確定性。就其性質而言,前瞻性陳述涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致我們的實際業績、業績或成就或其他未來事件與此類前瞻性陳述所表達或暗示的任何未來業績、業績或成就存在重大差異。本新聞稿中包含的前瞻性信息代表了公司截至本新聞發佈之日的預期,因此,在此之後可能會發生變化。讀者不應過分重視前瞻性信息,也不應從任何其他日期開始依賴這些信息。如果管理層的信念、估計或觀點或其他因素髮生變化,公司沒有義務更新這些前瞻性陳述。

Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.

本新聞稿中與其他礦產資源公司有關的信息和鏈接來自他們的來源,據信是可靠的,但尚未得到公司的獨立證實。

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

多倫多證券交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論