share_log

宝地矿业(601121.SH):目前哈西亚图正在建设中 预计今年下半年投产

Baodi Mining (601121.SH): Currently under construction, Hashiya Art is expected to be put into operation in the second half of this year

Gelonghui Finance ·  Apr 8 16:08

Gelonghui, April 8 | Baodi Mining (601121.SH) said on the investor interactive platform that the company's main business is iron ore mining and processing. The mining rights for the Haxiatu iron polymetallic ore belonging to the company also owns gold, zinc, copper, and lead in addition to iron ore. The details have been detailed in the prospectus. Currently, the Hashiya Map is under construction and is expected to be put into operation in the second half of this year.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment