share_log

ACME Lithium to Attend PDAC 2024 Convention in Toronto, March 3rd - 6th

ACME Lithium to Attend PDAC 2024 Convention in Toronto, March 3rd - 6th

ACME Lithium 将参加 3 月 3 日至 6 日在多伦多举行的 PDAC 2024 年大会
newsfile ·  02/29 21:30

Vancouver, British Columbia--(Newsfile Corp. - February 29, 2024) - ACME Lithium Inc. (CSE: ACME) (OTCQB: ACLHF) (the "Company", or "ACME") is pleased to announce that the Company will be attending and exhibiting at Booth #2406 at the Prospectors & Developers Association of Canada's ("PDAC") Convention at the Metro Toronto Convention Centre ("MTCC") from Sunday, March 3rd to Wednesday, March 6th, 2024.

不列颠哥伦比亚省温哥华--(Newsfile Corp.-2024 年 2 月 29 日)- ACME Lithium Inc (案例:ACME) (OTCQB:ACLHF) (“公司” 或 “ACME”)很高兴地宣布,公司将从3月3日星期日起参加在大多伦多会议中心(“MTCC”)举行的加拿大勘探者与开发商协会(“PDAC”)会议的 #2406 号展位并参展第三方 至3月6日星期三第四,2024。

On February 6th, 2024 ACME reported an exploration summary and hydrogeological evaluation report for ACME's Phase 1 and Phase 2 programs at its Clayton Valley, Nevada lithium brine project which included an estimated inferred lithium carbonate equivalent (LCE) resource of approximately 302,900 metric tons (units rounded). ACME intends to file a NI 43-101 compliant report on its Clayton Valley project within 45 days of this prior announcement.

2 月 6 日第四,2024年 ACME报告了ACME在其内华达州克莱顿谷锂盐水项目第一和第二阶段项目的勘探摘要和水文地质评估报告,其中包括估计推断的约302,900公吨(单位四舍五入)的碳酸锂当量(LCE)资源。ACME打算在上次宣布后的45天内就其克莱顿谷项目提交一份符合北爱尔兰43-101标准的报告。

ACME's Clayton Valley Nevada lithium brine project (the "Project") is contiguous to the northwest of one of the only operating lithium brine operations in North America, Albemarle Corporation's Silver Peak lithium deposit and facility which has been in production since 1966.

ACME的内华达州克莱顿谷锂盐水项目(“项目”)毗邻北美仅有的运营锂盐水业务之一,即自1966年以来一直在生产的雅宝公司的银峰锂矿床和设施的西北部。

About PDAC

关于 PDAC

The World's Premier Mineral Exploration & Mining Convention is the leading convention for people, governments, companies and organizations connected to mineral exploration. In addition to meeting more than 1,100 exhibitors, 2,500 investors and 24,000 attendees in person in 2023, participants could also attend programming, courses and networking events.

全球首屈一指的矿产勘探和采矿会议是与矿产勘探相关的个人、政府、公司和组织的主要会议。除了在2023年亲自与1,100多家参展商、2,500名投资者和24,000名与会者会面外,参与者还可以参加节目、课程和社交活动。

The annual convention is held in Toronto, Canada. It has grown in size, stature and influence since it began in 1932 and today is the event of choice for the world's mineral industry.

年度大会在加拿大多伦多举行。自1932年成立以来,它的规模、地位和影响力不断提高,如今已成为世界矿业的首选活动。

For more information and/or to register for the conference,
please visit: .

欲了解更多信息和/或注册会议,
请访问:。

About ACME Lithium Inc.

关于 ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in a project area located in Clayton Valley, Nevada and has entered into option agreements with third parties on its Fish Lake Valley, Esmeralda County Nevada project, and at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba.

ACME Lithium是一家矿产勘探公司,由经验丰富的团队领导,专注于与领先的技术和大宗商品公司合作收购、勘探和开发电池金属项目。ACME已经收购或有选择收购位于内华达州克莱顿谷的项目区域的100%权益,并已就其鱼湖谷、内华达州埃斯梅拉达县项目以及曼尼托巴省东南部的沙特福德、伯斯和卡特欧几里德湖项目与第三方签订了期权协议。

On behalf of the Board of Directors

代表董事会

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·汉森
首席执行官、总裁兼董事
电话:(604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca

投资者查询:
安东尼西蒙尼
西蒙妮资本
电话:(416) 881-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release contains certain statements which may constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Unless otherwise indicated, the market and industry data contained herein is based upon information from industry and other publications and the knowledge and experience of management. While we believe that this data is reliable, market and industry data is subject to variations and cannot be verified with complete certainty due to limits on the availability and reliability of raw data, the voluntary nature of the data gathering process and other limitations and uncertainties inherent in any statistical survey. We have not independently verified any of the data from third-party sources referred to in this news release or ascertained the underlying assumptions relied upon by such sources. All technical and scientific disclosure pertaining to our mineral property interests in this news release have been reviewed by a Qualified Person, meaning an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.

CSE及其监管服务提供商均不对本新闻稿的充分性或准确性承担责任。本新闻稿包含某些可能构成适用证券法所指的前瞻性信息的陈述(“前瞻性陈述”)。前瞻性陈述不是历史事实的陈述,通常但并非总是用 “预期”、“计划”、“预期”、“相信”、“打算”、“估计”、“项目”、“潜在” 和类似的表达方式来标识,或者事件或条件 “将”、“将”、“可能” 或 “应该” 发生,在本新闻稿中,包括但不限于 ACME项目物业的勘探、钻探或开发的属性、时机和预期收益。从对钻探、取样和其他技术结果的解释中推断出的信息也可以被视为前瞻性陈述,因为它构成了对项目实际开发时间和是否实际开发时可能出现的内容的预测。ACME的项目位置与锂项目相邻或附近,并不能保证勘探成功,也不能保证矿产资源或储量将在ACME的房产上确定。区域公司开展的勘探、开发和活动为ACME正在完成的勘探工作提供了援助和其他数据。这些前瞻性陈述受到各种风险和不确定性的影响,这些风险和不确定性可能导致实际事件或结果与前瞻性陈述中反映的事件或结果存在重大差异,包括但不限于:与金属价格波动相关的风险;与及时筹集足够资金以按可接受的条件为计划的工作提供资金相关的不确定性;天气、物流、技术或其他因素导致的计划工作发生变化;工作结果可能无法达到预期;以及意识到公司财产的潜在价值;发生事故、设备故障和劳资纠纷或其他意想不到的困难或中断的风险;工作计划中可能出现成本超支或意外支出;公司运营造成的环境污染或破坏风险以及其他风险和不确定性。任何前瞻性陈述仅代表截至其发表之日,除非适用的证券法另有要求,否则公司不承担更新任何前瞻性陈述的任何意图或义务,无论是由于新信息、未来事件或业绩还是其他原因。除非另有说明,否则此处包含的市场和行业数据基于来自行业和其他出版物的信息以及管理层的知识和经验。尽管我们认为这些数据是可靠的,但由于原始数据的可用性和可靠性的限制、数据收集过程的自愿性质以及任何统计调查固有的其他限制和不确定性,市场和行业数据可能会有所不同,无法完全确定地进行验证。我们尚未独立验证本新闻稿中提及的来自第三方来源的任何数据,也未确定此类来源所依赖的基本假设。本新闻稿中与我们的矿产权益有关的所有技术和科学披露均已由合格人员审查,即工程师或地球科学家,在矿产勘探、矿山开发或运营或矿产项目评估或其任何组合方面至少有五年的经验;具有与矿产项目主题和技术报告相关的经验;并且是专业协会的成员或被许可人。

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发