Gelonghui (603722.SH) announced on February 26, that according to the actual situation of the chemical company's production process and production equipment, in order to ensure the safe and effective operation of the production equipment, the company will stop production and maintenance of the 10,000-ton polyether amine production line from February 27, 2024 in accordance with the established regular inspection and maintenance plan for pressure equipment. The shutdown and maintenance period is expected to be about 20 days.
阿科力(603722.SH):部分生产装置停产检修
Akoli (603722.SH): Discontinuation of production and maintenance of some production facilities
The translation is provided by third-party software.
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
Risk Disclaimer
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
Got it
Risk Disclaimer
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
Got it
Statement
This page is machine-translated. Futubull tries to improve but does not guarantee the accuracy and reliability of the translation, and will not be liable for any loss or damage caused by any inaccuracy or omission of the translation.
Write a comment
0 0 0
LikeLoveLaughing CryRespectEmmSadAngry
Tap to Select a Mood
- 分享到weixin
- 分享到qq
- 分享到facebook
- 分享到twitter
- 分享到微博
- 粘贴板
Use the share button in your browser
to share the page with your friends
Tap here to share
No comments yet. Write one.