share_log

湖南发展:拟3390.67万元投建屋顶分布式光伏项目,总装机约9.96MWp

Hunan Development: Plans to invest 339.067 million yuan to build a rooftop distributed photovoltaic project, with a total installed capacity of about 9.96 MWp

Gelonghui Finance ·  Jan 30 17:50
Gelonghui, January 30 | Hunan Development Announcement. The company plans to use the first and second phases of the Zhuoda Jingu Venture Park in Xiangyin County, Yueyang City, Hunan Province to develop roofs to invest in the construction of distributed roof photovoltaic projects. The total roof area is about 100,000 square meters (subject to actual use area), the total installed capacity is about 9.96 MWp (subject to construction design), and the total static investment of the project is 339.67 million yuan.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment