share_log

Global Battery Metals Completes Detailed Remote Sensing and Structural Study of Knockeen Dike Swarm and Regional Leinster Lithium Project Area

Global Battery Metals Completes Detailed Remote Sensing and Structural Study of Knockeen Dike Swarm and Regional Leinster Lithium Project Area

Global Battery Metals完成了對Knockeen Dike Swarm和倫斯特地區鋰項目區的詳細遙感和結構研究
newsfile ·  2023/10/16 19:30

Study Identifies 2nd Major Shear Zone and 25 Additional Exploration Targets as Company Confirms Set of Eight Initial Drill Hole Assays to be Reported

研究確定了第二大剪切區和25個額外的勘探目標,公司確認將報告一套8個初始鑽孔分析

Vancouver, British Columbia--(Newsfile Corp. - October 16, 2023) - Global Battery Metals Ltd. (TSXV: GBML) (OTCQB: REZZF) (FSE: REZ) (the "Company" or "GBML" or "Global Battery Metals"), an international critical mineral exploration company focused on growth-oriented lithium and battery metal projects, is pleased to announce a structural remote sensing study of the Leinster Lithium District has been completed with 25 new exploration targets identified by local structural geology expert, Dr. Francis Murphy of Murphy Geological Services. A first-of-its-kind comprehensive study for this region, GBML believes this study - in association with the ongoing development of a 3D spatial model of the dike swarm and associated structures being drilled at Knockeen PL1597 - will help guide additional near-term pegmatite dike identification and future drilling efforts, while supporting further project-wide lithium exploration and target generation.

溫哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年10月16日)-Global Battery Metals Ltd.(TSXV:GBML)(OTCQB:REZZF)(FSE:REZ)(The“The”公司“或”GBML“或”全球電池金屬專注於增長型鋰和電池金屬專案的國際關鍵礦產勘探公司)很高興地宣佈,萊因斯特鋰區的構造遙感研究已經完成,當地構造地質專家墨菲地質服務公司的Francis Murphy博士確定了25個新的勘探目標。這是該地區首個此類綜合研究,GBML相信,這項研究-與正在Knockein PL1597鑽探的脈巖群和相關構造的3D空間模型開發相結合-將有助於指導更多的近期偉晶巖脈識別和未來的鑽探工作,同時支持進一步的專案範圍的鋰礦勘探和目標生成。

Key Highlights:

主要亮點:

  • Drilling continuing as per plan at the Lithium-Cesium-Tantalum (LCT) pegmatite dike swarm at Knockeen Prospect with drill holes 1-8 completed for a total of 1,597m with assays pending and drill hole 9 currently in progress.
  • Comprehensive regional structural synthesis has now been completed for the whole of the Leinster pegmatite belt with detailed focus on the Company's northern and southern block of licences.
  • Structural controls and the spatial location of the key East Carlow Deformation Zone (ECDZ) and associated splay structures have now been identified and shown to cross several key parts of the northern and southern block of licences.
  • Accurate definition of key structural corridors through the Company's five main target areas at Aghavannagh, Scurlocks, Sorrell, Knocknaboley and Tonygarrow now confirms the genetic association of these structures with the mineralization discovered to date, as well as extends the corridors for further exploration targeting.
  • A major NE-SW trending regional splay of the ECDZ, termed the North Wexford Deformation Zone (NWDZ) which has been historically mapped in the area, has now been confirmed and demarcated across areas of PL 1597.
  • In total, 25 distinct follow-up structural targets have been identified, including four additional targets on PL 1597 and 21 new targets on the northern licence block all based on the holistic geological, structural, geophysical and geochemical studies. These areas will be prioritized over the coming months.
  • 位於諾肯展望的鋰-銫-鉭(LCT)偉晶巖脈群的鑽探仍在按計劃進行,已完成1-8個鑽孔,總長度為1,597米,尚未進行分析,目前正在進行第9個鑽孔。
  • 整個萊因斯特偉晶巖帶的全面區域結構綜合現已完成,重點放在該公司的北部和南部許可證區塊。
  • 現已確定了關鍵的東卡洛變形區(ECDZ)的結構控制和空間位置以及相關的散佈結構,並表明它們跨越了許可證北部和南部區塊的幾個關鍵部分。
  • 通過準確定義公司位於Aghavannagh、Scurlock、Sorrell、Knocnupoley和Tonigarrow的五個主要目標區的關鍵構造走廊,現在證實了這些構造與迄今發現的礦化的成因聯繫,並擴大了走廊,以進一步勘探為目標。
  • ECDZ的一個主要的東北-西南方向的區域展布,被稱為北韋克斯福德變形帶(NWDZ),歷史上已經在該地區繪製了地圖,現在已經得到確認,並在PL 1597區域內劃定。
  • 總共確定了25個不同的後續結構目標,包括PL 1597上的4個新目標和北部許可證區塊的21個新目標,所有這些都是基於全面的地質、構造、地球物理和地球化學研究。這些領域將在接下來的幾個月裡優先考慮。

Remote Sensing Structural Study

遙感構造研究

GBML defined a 6,000 km2 study area covering the Company's northern and southern license blocks, including the Knockeen Prospect lithium drill program area. Structural analysis work included utilizing Sentinel-2 satellite imagery which provides a substantial resolution increase that more than doubles that of other satellites. This work was combined with other GIS datasets including the Geological Survey of Ireland (GSI) Tellus Aeromagnetic data; detailed GSI bedrock mapping data, historical regional GSI geochemistry as well as in-house company GBML-LRH prospecting and lithogeochemistry data.

GBML定義了6,000公里2.研究區域涵蓋公司的北部和南部許可證區塊,包括諾奇金前景鋰鑽探專案區。結構分析工作包括利用哨兵2號衛星圖像,這大大提高了解析度,是其他衛星的兩倍多。這項工作與其他地理資訊系統數據集結合在一起,包括愛爾蘭地質調查局(GSI)的Tellus航磁數據;詳細的GSI基岩填圖數據、歷史區域GSI地球化學數據以及內部公司GBML-LRH探礦和岩石地球化學數據。

The results of the combined study have confirmed key structural features across the Leinster Massif which are interpreted to be associated with mineralizing fluid flow key to the anatectic model for the localization and emplacement of the lithium bearing pegmatites. The primary East Carlow Deformation Zone (ECDZ) is shown to transect several of the northern block licenses and in particular the Tonygarrow and Aghavannagh targets. Interpreted splays from this structure pass across several other of the Company's licenses and in particular through the Scurlocks, Sorrell and Knocknaboley target areas. The work has also provided extensions of all of these structural corridors which can now become part of a focused ground exploration program.

聯合研究的結果證實了整個萊因斯特地塊的關鍵構造特徵,這些構造特徵被解釋為與成礦流體流動有關,這是含鋰偉晶巖定位和侵位的深成模型的關鍵。主要的東卡洛變形帶(ECDZ)橫跨幾個北部區塊許可證,特別是湯尼加羅和阿加萬納目標。從這一結構中解讀出來的畫面在公司的其他幾個許可證上傳遞,特別是通過斯庫洛克、索雷爾和諾剋剋納波利目標區域。這項工作還提供了所有這些結構走廊的延伸,現在可以成為重點地面勘探計劃的一部分。

On the southern block a historic, partially mapped structural feature passing along PL 1597 has now been confirmed through this study. It can now be interpreted as a significant structural splay off the primary East Carlow Deformation Zone and passes south of the Blackstairs Granite Pluton. This feature has been termed the North Wexford Deformation Zone (NWDZ) and provides a second highly prospective trend for the focus for ground exploration activities. Several target areas have already been identified for detailed prospecting and mapping.

在南部區塊,通過這項研究,現在已經證實了沿著PL 1597的歷史上的、部分繪製的構造特徵。它現在可以被解釋為主要的East Carlow變形帶的一個重要的構造伸展,並通過BlackstallGranite Pluton以南。這一特徵被稱為北韋克斯福德變形帶(NWDZ),為地面勘探活動的焦點提供了第二個極具前景的趨勢。已經確定了幾個目標區域,以便進行詳細的探礦和測繪。

Knockeen Drilling Program

諾肯鑽井計劃

To date, GBML has completed eight drill holes (DDH-23-1597-01 - DDH-23-1597-08) for a total of 1,761m, with a ninth drill hole (DDH 23-1597-09) currently in progress (estimated final depth of 250m). Multiple phases of pegmatite and importantly the lithium bearing spodumene pegmatites have been intersected in all of the holes so far. Logging and sampling of the holes is in progress with some of the sampled intervals currently at the laboratory with others still being processed. All of the data and results of the initial eight drill holes will be synthesized and reported together, allowing for a full, proper and considered interpretation of the intersections and providing for a more holistic view of the dike swarm's geometry.

到目前為止,GBML已經完成了8個鑽孔(DDH-23-1597-01-DDH-23-1597-08),總長度為1,761米,第九個鑽孔(DDH 23-1597-09)正在進行中(預計最終深度為250米)。到目前為止,所有的孔中都有多相偉晶巖,更重要的是,鋰輝石偉晶巖已經在所有的孔中相交。鑽孔的記錄和採樣正在進行中,一些採樣間隔目前在實驗室,其他採樣間隔仍在處理中。最初8個鑽孔的所有數據和結果將被綜合起來並一起報告,從而允許對交叉點進行全面、適當和經過深思熟慮的解釋,並提供對堤壩群幾何形狀的更全面的看法。

Detailed structural data is being collected from the drill core by using state of the art Reflex EZ-Trac Single Shot down-hole core orientation tool on the drill rig. Once back at the core logging facilities, the orientated core from the drill rig is then logged for its structural components with an IMDEX STRUCTURAL-IQ Solution tool as part of the core logging process. This approach means that the pegmatites and their exact orientations can be positioned with all of the other structural components relating to the emplacement of the pegmatite dike swarm. So far, over 5,000 structural elements have been recorded to be imported into Seequents's 3D modelling software package, LeapFrog. This will help to better visualize the detailed structural regime and kinematics of the pegmatite dikes in the area being drilled, as well as the geometry of the various phases of pegmatites. Petrographic analysis of samples of lithologies, mineralization and alteration from within the drill core is also in progress to help interpret the metallogenetic development of the mineralizing system.

通過在鑽機上使用最先進的Reflex EZ-Trac單炮井下岩心定位工具,正在從鑽芯收集詳細的結構數據。回到岩心測井設施後,作為岩心測井過程的一部分,隨後使用IMDEX Structure-IQ解決方案工具記錄來自鑽機的定向岩心的結構元件。這種方法意味著偉晶巖及其準確方位可以與與偉晶巖牆群侵位有關的所有其他結構成分一起定位。到目前為止,已記錄了5000多個結構元素,這些元素將被導入Seequents的3D建模軟件包LeapFrog。這將有助於更好地可視化正在鑽探的地區偉晶巖脈的詳細構造狀態和運動學,以及偉晶巖不同階段的幾何形狀。鑽芯內的巖性、礦化和蝕變樣品的巖相學分析也在進行中,以幫助解釋礦化系統的成礦發展。

"GBML will continue to utilize impact players and proven industry experts that can maximize shareholder interests and dramatically increase the potential for mineralized zone discovery," said Michael Murphy, CEO of Global Battery Metals. "The structural analysis included in this report will help us to not only understand and advance our big-picture lithium district potential, but also highlight more immediate opportunity spots of interest. Top-notch structural interpretation is key to unlocking long-term target development and drilling success. I'm also pleased to report that the team is opting to release initial assay results from our first eight holes to date, pending completion of lab analysis. We now have a much stronger picture of the dike swarm and lithium mineralization potential."

Global Battery Metals首席執行官邁克爾·墨菲表示:“GBML將繼續利用Impact參與者和久經考驗的行業專家,他們可以最大限度地擴大股東利益,顯著增加發現礦化區的潛力。”這份報告中包括的結構分析將幫助我們不僅瞭解和推進我們的宏觀鋰地區潛力,還將突出更緊迫的感興趣的機會點。一流的結構解釋是解鎖長期目標開發和鑽探成功的關鍵。我還很高興地報告,該團隊選擇公佈我們迄今前八個洞的初步化驗結果,等待實驗室分析完成。我們現在對巖牆群和鋰礦化潛力有了更清晰的瞭解。

Field work will be planned to develop and enhance the structural models including ground verification of the geometry and kinematics of the major and second order faults and shears identified from the satellite imaging. This will tie in with the structural work being completed on the drill core at Knockeen.

將計劃開展實地工作,以開發和加強結構模型,包括對衛星成像所查明的主要和二級斷層和剪切的幾何和運動學進行地面核查。這將與諾奇金鑽芯正在完成的結構工作相配合。

About the Leinster Lithium Project

關於萊因斯特鋰專案

Located south of Dublin in the counties of Wicklow and South Carlow, the Leinster Lithium Project consists of 16 prospecting license areas covering approximately 525 km2 situated along strike to the joint Ganfeng Lithium / International Lithium Corporation Blackstairs Lithium Project. The Company's ongoing drill program at Knockeen has been approved under the government's detailed "appropriate assessment screening" process for up to 10 drill holes for a total of approximately 2,000m.

萊因斯特鋰專案位於都柏林南部的威克洛縣和南卡洛縣,由16個探礦許可區組成,佔地約525平方公里,位於贛鋒鋰業/國際鋰公司布萊克斯泰爾鋰聯合專案的沿線。根據政府詳細的“適當評估篩選”程式,該公司在諾奇基恩正在進行的鑽探計劃已獲得批准,最多可鑽10個鑽孔,總計約2000米。

With initial drilling underway, GBML has succeeded in intersecting multiple dikes within the host granites to reveal a structurally controlled LCT pegmatite system, which importantly includes the lithium mineral spodumene within the pegmatites. The drill cores continue to be logged, sampled and dispatched for analysis at ALS Laboratories and pending results reporting. No drilling has ever been carried out at the Knockeen Prospect previously, and intersecting potential lithium bearing pegmatites in all of the holes drilled so far is considered a major technical success for the Company. Prior surface exploration activities identified and confirmed expansive surface boulder trains of lithium pegmatite lithologies in a number of areas across the Company's property, with recent assay results of 66 rock samples analyzed by ALS Laboratories earlier this year returning Li2O% lithium contents ranging up to 3.75 % Li2O / 17,410 ppm Li.

隨著初步鑽探的進行,GBML已成功地將多個巖脈與寄主花崗巖相交,揭示了一個受構造控制的LCT偉晶巖系統,其中重要的是偉晶巖中包括鋰礦物鋰輝石。繼續對鑽芯進行記錄、採樣和發送,以便在ALS實驗室進行分析並提交待定結果報告。諾斯基恩礦區以前從未進行過任何鑽探,到目前為止,將潛在的含鋰偉晶巖與所有鑽孔相交被認為是本公司的一項重大技術成功。之前的地表勘探活動在公司物業的多個區域發現並確認了鋰偉晶巖巖性的膨脹表面巨石序列,今年早些時候ALS實驗室分析的66個岩石樣本的最新分析結果返回了Li2.0%鋰含量高達3.75%Li2.O/17,410ppm Li。

Responsibility to the Environment

對環境的責任

All mineral exploration activities in Ireland take place under the auspices of the GSRO, a division within the Government Department of the Environment, Communications & Climate Change. Exploration is governed under the framework of both Irish and EU legislation that has been implemented to ensure that the environment is protected during exploratory work. Prospecting licence holders must comply with all of the relevant legislation. The Company is pleased to confirm that it adheres to the highest standards of good practice in relation to its ongoing exploration activities having completed a detailed GSRO "Appropriate Assessment" process prior to commencement which was reviewed, approved and signed off by the appropriate oversight authorities. GBML's Directors understand that social license is key to unlocking positive exploration outcomes by following low impact / low sound / low disturbance exploration program best practice for environmental sensitivity.

愛爾蘭的所有礦產勘探活動都是在GSRO的贊助下進行的,GSRO是政府環境、通信和氣候變化部的一個部門。勘探是在愛爾蘭和歐盟立法的框架下進行的,這兩項立法已經實施,以確保在勘探工作期間保護環境。探礦許可證持有人必須遵守所有相關的法律。本公司高興地確認,其持續勘探活動遵守最高標準的良好做法,並在開始之前完成了詳細的GSRO“適當評估”程式,該程式已由適當的監督機構審查、批准和簽署。GBML的董事明白,通過遵循低影響/低聲音/低幹擾勘探計劃的環境敏感性最佳實踐,社會許可證是釋放積極勘探成果的關鍵。

Competent Person

能勝任的人

All scientific and technical information in this announcement has been prepared under the supervision of and reviewed and approved by EurGeol Vaughan Williams, M.Sc., P.Geo., (Principal of Aurum Exploration Services currently providing exploration services to GBML and to LRH Resources Limited ("LRH")), a "qualified person" within the meaning of National Instrument 43-101.

本公告中的所有科學和技術資訊都是在EurGeol Vaughan Williams,M.Sc,P.Geo,(目前為GBML和LRH Resources Limited提供勘探服務的Aurum勘探服務負責人)的監督下準備並審查和批准的。LRH“),國家文書43-101所指的”合格人士“。

Quality Assurance/Quality Control

品質保證/質量控制

Quality Assurance/Quality Control of drill core samples and associated assay results are monitored by GBML through a quality assurance/quality control ("QA/QC") protocol which includes the insertion of blind standard reference materials, blanks, and duplicates at regular intervals. Core is drilled in HQ core diameter and each 3 metres of core recovered is orientated by the drilling contractor on completion of each run drilled. Drill core is laid out in strong core boxes and transported by Company geologists from the drill rig to GBML's secure logging facility. Drill core is then logged using an established logging procedure capturing detailed lithological data as well as measuring all structural elements using a Reflex IQ Logger for accurate orientation of all contacts and structures. The core is marked up for sampling and sawn on site using a diamond core saw. Half core samples are then bagged and secured using plastic cable ties and the samples are then securely transported to ALS Laboratory ("ALS") facilities in County Galway, Republic of Ireland. Samples are analyzed for lithium as well as multi- elemental trace elements using the specific LCT pegmatite analytical suite ME-MS89L offered by ALS. ALS also performs its own internal QA/QC procedures to assure the accuracy and integrity of results. GBML is unaware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data referred to herein.

鑽芯樣本和相關化驗結果的品質保證/質量控制由GBML通過品質保證/質量控制(“QA/QC“)規程,包括定期插入盲標標準物質、空白和複製品。鑽探的岩心直徑為HQ,每3米回收的岩心在每次鑽探完成後由鑽探承包商確定方位。鑽芯放置在堅固的巖芯盒中,由公司地質學家從鑽機運輸到GBML的安全測井設施。然後使用已建立的測井程式記錄鑽芯,獲取詳細的巖性數據,並使用Reflex IQ測井儀測量所有結構元素,以準確定位所有接觸和結構。巖芯被標記以供取樣,並在現場使用鑽石芯鋸進行鋸切。然後將半個岩心樣本裝袋並用塑料纜繩固定,然後將樣本安全地運送到ALS實驗室(“肌萎縮側索硬化症)位於愛爾蘭共和國戈爾韋郡的設施。使用ALS提供的特定LCT偉晶巖分析套件ME-MS89L分析樣品中的鋰和多元素微量元素。ALS還執行自己的內部QA/QC程式,以確保結果的準確性和完整性。GBML不瞭解任何可能對此處提到的數據的準確性或可靠性產生重大影響的鑽探、採樣、回收或其他因素。

About Global Battery Metals Ltd.

關於環球電池金屬有限公司

GBML is an international mineral exploration and development company with a focus on lithium and other metals that comprise and support the rapid evolution to battery power. GBML currently maintains economic interests in four battery metal projects: (1) an option to acquire up to a 90% interest in the Leinster Lithium Property and drill program currently underway in Ireland; (2) a 100% interest in the drill-ready Lithium King Property in Utah; (3) an option to acquire up to a 100% interest in the La Poile Lithium Project in Newfoundland; and (4) a 55% stake in Peru-based Lara Copper Property, which has over 10,000 metres of drilling. As previously disclosed, Minsur S.A., a Peruvian mining company, entered into an option agreement with GBML and Lara Exploration Ltd. to acquire the Lara copper property for staged payments of USD$5.75 million. GBML will retain a 0.75% net smelter royalty. GBML's common shares are listed on the TSX Venture Exchange (TSXV: GBML); Frankfurt Stock Exchange (FSE: REZ); and are quoted on the OTC Markets (OTCQB: REZZF).

GBML是一家國際礦產勘探和開發公司,專注於鋰和其他金屬,這些金屬構成並支持電池動力的快速演變。GBML目前持有四個電池金屬專案的經濟權益:(1)收購愛爾蘭目前正在進行的Leinster Lithium礦產和鑽探專案90%權益的選擇權;(2)猶他州可鑽探的Lithium King礦產的100%權益;(3)收購紐芬蘭La Poile鋰專案最多100%權益的選擇權;以及(4)祕魯Lara銅礦55%的權益,後者的鑽井深度超過10,000米。正如之前披露的那樣,祕魯礦業公司Minsur S.A.與GBML和Lara Explore Ltd.簽訂了一項期權協定,以575萬美元的分期付款收購Lara銅礦。GBML將保留0.75%的冶煉廠淨特許權使用費。GBML的普通股在多倫多證券交易所創業板(TSXV:GBML)、法蘭克福證券交易所(FSE:REZ)上市,並在場外交易市場(OTCQB:REZZF)上市。

Global Battery Metals Ltd.
Michael Murphy BA, MBA, MSc., ICD
President & CEO
T: 604-649-2350
E: MM@gbml.ca
W:

環球電池金屬有限公司。
邁克爾·墨菲,工商管理碩士,理學碩士,ICD
總裁兼首席執行官
電話:604-649-2350
郵箱:mm@gbml.ca
W:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Cautionary Statement Regarding "Forward-Looking" Information

關於“前瞻性”資訊的警示聲明

This news release contains certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, included herein, without limitation, statements relating to the future operations and activities of the Company, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", and similar expressions, or statements that events, conditions, or results "will", "may", "could", or "should" occur or be achieved. Forward-looking statements in this news release relate to, among other things, the Company's exploration plans at the Leinster Lithium Project, including the drill program and results therefrom. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions, and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the ability to complete exploration work, the results of exploration, continued availability of capital, and changes in general economic, market and business conditions, and the receipt of any required regulatory approvals. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these items. Readers are urged to refer to the Company's reports for a more complete discussion of such risk factors and their potential effects, publicly available at SEDAR+, the Canadian Securities Administrators' national system that all market participants use for filings and disclosure, at . The Company does not assume any obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by applicable securities laws.

本新聞稿包含適用證券法定義的某些“前瞻性資訊”和“前瞻性陳述”(統稱為“前瞻性陳述”)。本文中包括但不限於與公司未來經營和活動有關的所有陳述,除歷史事實陳述外,均為前瞻性陳述。前瞻性表述經常(但並非總是)由諸如“預期”、“預期”、“相信”、“打算”、“估計”、“潛在”、“可能”以及類似的表述,或事件、條件或結果“將”、“可能”、“可能”或“應該”發生或實現的表述來識別。本新聞稿中的前瞻性陳述涉及公司在萊因斯特鋰專案的勘探計劃,包括鑽探計劃和結果。不能保證這樣的陳述將被證明是準確的,實際結果和未來事件可能與此類陳述中預期的大不相同。前瞻性陳述反映了作出陳述之日的信念、意見和預測,並基於許多假設和估計,雖然公司認為這些假設和估計是合理的,但這些假設和估計本身就會受到重大商業、經濟、競爭、政治和社會不確定性和或有事件的影響。許多已知和未知的因素可能導致實際結果、業績或成就與此類前瞻性陳述明示或暗示的結果、業績或成就大相徑庭,締約方根據其中許多因素或與之相關的許多因素作出了假設和估計。這些因素包括但不限於完成勘探工作的能力、勘探結果、資本的持續可獲得性、總體經濟、市場和商業狀況的變化,以及獲得任何所需的監管批准。讀者不應過分依賴本新聞稿中包含的有關這些專案的前瞻性陳述和資訊。呼籲讀者參考公司的報告,以更全面地討論這些風險因素及其潛在影響,這些報告可在SEDAR+上公開獲得,SEDAR+是加拿大證券管理人的國家系統,所有市場參與者都使用該系統進行申報和披露。除非適用的證券法要求,否則公司不承擔任何義務,在信念、意見、預測或其他因素的前瞻性陳述發生變化時更新它們。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論