Summary of duties
Sichuan Energy Development Co., Ltd. is a vertical joint power supplier and service provider in Yili City, Sichuan Province, with a comprehensive supply threshold for equipment response, power distribution and sale. The bazaar has a stable customer group and a complete supply network in Yicheng City. Through the effective allocation of power resources, the bazaar can internalize and balance the power resources in the supply network. The services of the collection include power services (development and supply), and power engineering construction services and related services (power engineering construction services and the sale of power equipment and materials). It is the only authorized power supplier in the designated statutory area covering some of the seven regions and some of the coastal areas. The distribution and distribution of electricity in the power supply and service area through the collection is mainly carried out by the hydropower stations owned and owned by the subsidiaries of the collection.
Thank you very much.
The market provides integrated power services of "development and distribution", and is the supplier of a comprehensive energy solution.
The market is the only power supplier in the supply service area of Yili City.
There are regional reserves and rich natural resources (including hydropower resources), with favorable conditions for the development of military operations.
Negative factor
To a large extent, the increase of the responsibility of the market depends on the sustained economic growth of the city.
A limited number of suppliers that collect electricity from foreign sources and rely on a limited number of suppliers
The downside of the sale of electricity may adversely affect the business, business conditions or operating expenses of the collection.
The purpose of the income
About 40% of the power supply and other power companies outside the service area are used for collection.
About 30% will be used to build higher-level power generation and to upgrade and strengthen the existing power structure.
About 20% is used to establish the integrated information power control center and promote the self-initialization and informationization of the system.
About 10% is used for general financial assistance.