VANCOUVER, BC / ACCESSWIRE / May 10, 2023 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce final results from the 2023 Phase I drilling program on its year-round, road accessible, Dome Mountain Gold Project, located a short 50-minute drive from Smithers, British Columbia.

不列顛哥倫比亞省溫哥華/ACCESSWIRE/2023 年 5 月 10 日/ Blue Lagoon Resources Inc.(以下簡稱 “公司”)(CSE: BLLG)(FSE: 7BL)(OTCQB: BLAGF)很高興地宣佈其全年通行的穹頂山金礦項目2023年第一階段鑽探計劃的最終結果,該項目距離不列顛哥倫比亞省史密瑟斯僅50分鐘車程。

A total of 2909 meters of NQ diamond drilling was completed in ten (10) drill holes during the Phase 1 2023 campaign. Two of the ten holes were abandoned due to technical issues well before target depth and subsequently redrilled (Table 1). The first of these ten holes was focused on undercutting and following up on a significant intersection discovered during the 2022 drill program in drill hole DM-22-273 (see press release January 16, 2023). This intersection consisted of a wide zone of mineralized breccia and quartz-carbonate sulphide veining was intersected grading 5.49 g/t Au, 80.9 g/t Ag and 1.21% Cu over 16.55 meters (291.45 to 308.00m), including 11.02 g/t Au, 115.8 g/t Ag and 2.31% Cu over 5.65 meters (202.35 to 308.00m). This intersection was interpreted to represent the eastern extension of the Boulder Main vein.

在2023年第一階段的活動中,在十(10)個鑽孔中共完成了2909米的NQ鑽石鑽探。由於技術問題,十個洞中有兩個在目標深度之前就被遺棄了,隨後又進行了重新鑽探(表1)。這十個洞中的第一個洞側重於底挖和跟進 2022 年鑽探計劃期間在 DM-22-273 鑽孔中發現的重要交叉點(見 2023 年 1 月 16 日的新聞稿)。該交叉點由寬闊的礦化角礫岩和石英碳酸鹽硫化物脈脈組成,在16.55米(291.45至308.00米)上相交,品位爲5.49克/噸金、80.9克/噸銀和1.21%銅,包括5.65米(202.35至308.00米)上的11.02克/噸金、115.8克/噸銀和2.31%的銅。這個交叉點被解釋爲代表博爾德主礦脈的東延伸部分。

Follow-up drilling this year set up on the same drill pad as hole DM-22-273 and targeted strike and dip extents at approximately 50 metres centers (Figure 1).

今年的後續鑽探是在與 DM-22-273 孔相同的鑽臺上進行的,目標打擊和傾斜範圍位於中心大約 50 米(圖 1)。

Table 1: Drill hole collar specifications

表 1:鑽孔環規格

Hole ID

Location (UTM Zone 9 North)

Total Depth (m)

Orientation

Easting

Northing

Elevation

Azimuth

Dip

DM-23-285

(Abandoned and redrilled as 285A)

653552

6068474

1293

43.00

350

-58

DM-23-285A

653552

6068474

1293

581.00

350

-58

DM-23-286

653552

6068474

1293

362.70

338

-46

DM-23-287

653552

6068474

1293

359.00

338

-59

DM-23-288

653552

6068474

1293

358.50

5

-47

DM-23-289

653552

6068474

1293

367.70

3

-57

DM-23-290

(Abandoned and redrilled as 290A)

653552

6068474

1293

61.60

13

-46

DM-23-290A

653552

6068474

1293

316.20

16.4

-46

DM-23-291

653403

6068679

1300

205.60

6

-50

DM-23-292

653403

6068679

1300

253.50

67

-45

Hole ID

地點(UTM 第 9 區北)

總深度 (m)

定向

向東

北方

海拔

Azimuth

DM-23-285

(被遺棄並重新鑽探爲 285A)

653552

6068474

1293

43.00

350

-58

DM-23-285A

653552

6068474

1293

581.00

350

-58

DM-23-286

653552

6068474

1293

362.70

338

-46

DM-23-287

653552

6068474

1293

359.00

338

-59

DM-23-288

653552

6068474

1293

358.50

5

-47

DM-23-289

653552

6068474

1293

367.70

3

-57

DM-23-290

(被遺棄並重新鑽探爲 290A)

653552

6068474

1293

61.60

13

-46

DM-23-290A

653552

6068474

1293

316.20

16.4

-46

DM-23-291

653403

6068679

1300

205.60

6

-50

DM-23-292

653403

6068679

1300

253.50

67

-45

Figure 1

圖 1

Table 2: Selected significant intersections, Boulder Main, eastern extension

表 2:選定的重要交叉路口,Boulder Main,東部延伸部分

Hole ID

Intersection (m)

Grade

From

To

Length

Au (g/t)

Ag (g/t)

Cu (%)

DM-23-285A

331.05

331.47

0.42

44.20

136.0

0.524

491.00

492.00

1.00

1.31

12.1

0.059

503.00

511.00

8.00

1.80

8.4

0.050

incl

504.60

507.34

2.74

4.25

18.7

0.095

541.00

543.00

2.00

1.75

7.6

0.060

546.00

548.95

2.95

2.39

10.8

0.057

DM-23-286

330.00

331.00

1.00

6.02

83.7

0.380

DM-23-287

309.55

311.10

1.55

15.20

31.4

0.147

DM-23-288

300.51

301.50

0.99

0.95

0.8

0.010

302.54

303.77

1.23

0.97

7.4

0.033

345.05

346.10

1.05

4.55

47.3

0.077

DM-23-289

339.00

340.40

1.40

10.35

38.9

0.108

Incl

339.84

340.40

0.56

25.10

93.0

0.248

DM-23-290A

267.00

267.34

0.34

7.64

30.6

0.167

Hole ID

十字路口 (m)

等級

來自

長度

金 (g/t)

銀 (g/t)

銅 (%)

DM-23-285A

331.05

331.47

0.42

44.20

136.0

0.524

491.00

492.00

1.00

1.31

12.1

0.059

503.00

511.00

8.00

1.80

8.4

0.050

包含

504.60

507.34

2.74

4.25

18.7

0.095

541.00

543.00

2.00

1.75

7.6

0.060

546.00

548.95

2.95

2.39

10.8

0.057

DM-23-286

330.00

331.00

1.00

6.02

83.7

0.380

DM-23-287

309.55

311.10

1.55

15.20

31.4

0.147

DM-23-288

300.51

301.50

0.99

0.95

0.8

0.010

302.54

303.77

1.23

0.97

7.4

0.033

345.05

346.10

1.05

4.55

47.3

0.077

DM-23-289

339.00

340.40

1.40

10.35

38.9

0.108

包括

339.84

340.40

0.56

25.10

93.0

0.248

DM-23-290A

267.00

267.34

0.34

7.64

30.6

0.167

NOTE: Insufficient information is available to determine true thicknesses.

注:可用信息不足,無法確定真實厚度。

The down-dip expression of the mineralization in drill hole DM-22-273 appears to be a narrow semi-massive sulphide bearing quartz vein (the Boulder Vein) in drill hole DM-23-285A. Precious metal grades here are 44.20 g/t Au and 136 g/t Ag and 0.52% Cu over 0.42 meters. Further down hole, a broader, but lower grade zone returned 1.80 g/t Au and 8.4 g/t Ag over 8.00 meters, including 4.25 g/t Au and 18.7 g/t Ag over 2.74 meters. Lower copper concentrations in this zone suggest it is not related to mineralization in DM-22-273 but may represent a zone of previously unrecognized mineralization in this structurally complex area.

DM-22-273 鑽孔中礦化的向下傾表達似乎是鑽孔 DM-23-285A 中帶有石英脈的狹窄半塊狀硫化物礦脈(博爾德礦脈)。這裏的貴金屬品位爲44.20 g/t Au,136 g/t Ag,0.42米以上的銅品位爲0.52%。再往下走,一個更寬但品位較低的區域在8.00米處返回了1.80 g/t Au和8.4 g/t Ag,其中包括2.74米以上的4.25 g/t Au和18.7 g/t Ag。該區域的銅濃度較低表明它與 DM-22-273 中的礦化無關,但可能代表了這個結構複雜區域中以前無法識別的礦化區域。

Drilling on strike to the west, drill holes DM-23-286 and DM-23-287 intersected the mineralized Boulder Vein grading 6.02 g/t Au and 83.7 g/t Ag over 1.00 meters and 15.20 g/t Au and 31.4 g/t Ag over 1.55 meters, respectively.

在向西鑽探時,鑽孔 DM-23-286 和 DM-23-287 與礦化博爾德礦脈相交,金品位分別爲 6.02 g/t 和 83.7 g/t Ag,超過 1.00 米,金含量爲 15.20 g/t 和 31.4 g/t Ag,超過 1.55 米。

To the east, drill hole DM-23-288 did intersect a zone of veining approximately 56 metres east at a similar depth as in hole DM-22-273, although the breccia was not developed in this location. Gold and silver grades were only weakly anomalous with a best of 1.48 g/t Au and 18.1 g/t Ag over 0.52 metres. Below this, two samples returned strong silver (and copper) values with concentrations of 97.2 g/t Ag (0.371% Cu) and 233 g/t Ag (1.640% Cu). These are related to narrow disseminated zones of a dark grey sulphide, identified as tennantite based on geochemistry. These zones are rather unique as compared to typical vein character and mineralogy of the Boulder Vein. Narrow tennantite veining was noted in the intersection in drill hole 273. Drill hole DM-23-289 drilled to undercut DM-23-238 intersected a deformed quartz -carbonate sulphide vein which returned 1.4 meters running 10.35 g/t Au, 38.9 g/t Ag and 0.108 Cu% (including 25.10 g/t Au and 93.0 g/t Ag over 0.56 meters). This intercept in the Boulder Vein is significant as it confirms 350 meters of additional strike length along the Boulder Vein east of the current resource model (see figure 2). Drill hole DM-23-290A, drilled to intersect the structure another 50 meters east, cut a narrow quartz-carbonate-sulphide vein grading 7.64 g/t Au and 30.6 g/t Ag over 0.34 meters.

在東邊,DM-23-288 鑽孔確實與向東約 56 米的脈紋區域相交,深度與 DM-22-273 洞相似,儘管該地點沒有形成角礫岩。黃金和白銀的品位僅有微弱的異常,在0.52米以上的最佳品位爲1.48 g/t Ag,18.1 g/t Ag。在此之下,兩個樣品返回了強勁的銀(和銅)值,濃度分別爲97.2 g/t Ag(0.371% Cu)和233 g/t Ag(1.640% Cu)。它們與深灰色硫化物的狹窄浸散帶有關,根據地球化學特徵,該硫化物被確定爲坦南鐵礦。與博爾德礦脈的典型礦脈特徵和礦物學相比,這些區域相當獨特。在273號鑽孔的十字路口發現了狹窄的坦南特礦脈。爲了削減 DM-23-238 而鑽的 DM-23-289 鑽孔與變形的石英碳酸鹽硫化物礦脈相交,該礦脈返回 1.4 米,金含量爲 10.35 g/t Ag、38.9 g/t Ag 和 0.108 Cu%(包括 0.56 米以上的 25.10 g/t Au 和 93.0 g/t Ag)。博爾德礦脈的這次攔截意義重大,因爲它證實了當前資源模型以東的博爾德礦脈沿線增加了350米的打擊長度(見圖2)。鑽孔 DM-23-290A 鑽孔與建築物向東 50 米處相交,在 0.34 米處開闢了一條狹窄的石英-碳酸鹽-硫化物礦脈,品位爲 7.64 g/t Ag 和 30.6 g/t Ag。

Drill hole DM-23-291 was planned to test an interpreted area of the Boulder Main vein that was not included in the current vein model. A vein was intersected in historical drill hole D89-05 which graded 6.89 g/t Au and 41.6 g/t Ag within altered host rocks. Additional < 5g/t Au mineralization was selectively sampled within the alteration zone. Sampling of DM-23-291 only returned spotty low grade precious metal values within the expected zone. At depth, a better mineralized vein was encountered returning 3.52 g/t Au and 57.3 g/t Ag over 3.00 meters. It is unclear whether this vein represented the Boulder Footwall vein or may possibly be part of the Boulder East structures.

DM-23-291 鑽孔計劃測試博爾德主礦脈中未包含的解釋區域,該區域未包含在當前礦脈模型中。歷史鑽孔 D89-05 中有一條礦脈相交,該鑽孔在改變後的宿主岩石中分級爲 6.89 g/t Ag 和 41.6 g/t Ag。在蝕變帶內選擇性地採樣了其他

Though there is insufficient infill drilling at this time, it is reasonable to assume, based on drilling, that the strike length and down-dip extent of the Boulder Vein Resource could be doubled by infill drilling. The current resource (news release Feb 3, 2022) discloses a mineral resource of 45,000 Au and 250,000 Ag in the measured category, 173,000 oz Au and 876,000 oz Ag in the indicated category and 16,000 oz Au and 71,000 oz Ag in the inferred category.

儘管目前的填充鑽探不足,但根據鑽探,可以合理地假設,填充鑽探可能會使博爾德礦脈資源的走向長度和下傾範圍翻一番。當前資源(2022年2月3日新聞稿)披露的礦產資源爲 測得類別爲 45,000 Au 和 250,000 Ag,指定類別爲 17.3 萬盎司金和 87.6,000 盎司銀16,000 盎司金和 71,000 盎司銀屬於推斷類別。

Figure 2 Long section showing existing Boulder Vein Resource (measured and indicated resource blocks) and recent drilling. Black arrows showing strike length and dip depth on the resource and red arrows show length along strike and down dip added by recent drilling. Area in green denotes 2023 Phase 1 drilling.

圖 2 長部分顯示了現有的博爾德礦脈資源(測量和指示的資源區塊)和最近的鑽探。黑色箭頭顯示資源上的打擊長度和傾角深度,紅色箭頭顯示最近鑽探增加的沿走向和向下傾角的長度。綠色區域表示 2023 年第一階段鑽探。

QUALITY ASSURANCE AND CONTROL

質量保證和控制

Core selected for sampling was cut in half with a core saw with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Activation Laboratories Ltd. located in Kamloops, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-OES finish (Act Labs Code 1A2-ICP) and for multi-elements by 4-acid total digestion ICP with OES finish. (Act Labs Code 1F2) Any gold overlimits (>30 ppm Au) were analyzed by gravimetric fire assay (Act Labs Code 1A3). Standards and blanks were inserted by Company staff. The drilling and sampling program was managed and supervised by Company personnel and under the direction of Ted Vanderwart, P.Geo.

選中取樣的岩心用岩心鋸切成兩半,一半裝袋裝好運輸。嚴格的監管鏈、存儲和運輸協議得以維持。所有核心製備和分析均由位於不列顛哥倫比亞省坎盧普斯的活化實驗室有限公司完成。核心被壓碎、分裂和粉碎,250 克超過 200 目。每個樣本都通過火法分析,ICP-OES表面處理(Act Labs Code 1A2-ICP)進行金分析,並通過4酸總消化ICP對多元素進行分析,並進行OES表面處理。(澳大利亞首都直轄區實驗室守則1F2)任何黃金超限(>30 ppm Au)均通過重量火測定(澳大利亞首都直轄區實驗室守則1A3)進行了分析。標準和空白由公司員工填寫。鑽探和取樣計劃由公司人員管理和監督,在泰德·範德瓦特的指導下, P.Geo。

The scientific and technical disclosure in this news release was approved by William Cronk, P.Geo, a Qualified Person as defined in NI 43-101 and a consultant to the Company.

本新聞稿中的科學和技術披露得到了威廉·克朗克的批准, P.Geo,NI 43-101中定義的合格人員和公司的顧問。

For further information, please contact:

欲了解更多信息,請聯繫:

Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com

Rana Vig
總裁兼首席執行官
電話:604-218-4766
電子郵件:rana@ranavig.com

The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CSE 尚未審查本新聞稿的充分性或準確性,也不承擔任何責任。

Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration or future exploitation of minerals deposits, volatility of gold and silver prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

關於前瞻性信息的聲明:本新聞稿包括某些可能被視爲 “前瞻性陳述” 的陳述。除歷史事實陳述外,本新聞稿中涉及Blue Lagoon Resources Inc.(以下簡稱 “公司”)預計將發生的事件或事態發展的所有陳述均爲前瞻性陳述。前瞻性陳述不是歷史事實的陳述,通常但並非總是用 “期望”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛在” 和類似的表達方式來標識,或者事件或條件 “將”、“會”、“可能” 或 “應該” 發生。儘管公司認爲此類前瞻性陳述中表達的預期是基於合理的假設,但此類陳述並不能保證未來的業績,實際業績可能與前瞻性陳述中存在重大差異。可能導致實際結果與前瞻性陳述中的結果存在重大差異的因素包括勘探活動的結果可能無法顯示出進一步勘探或未來開採礦牀所需的質量和數量、黃金和白銀價格的波動、資本和融資的持續可用性、許可和其他批准以及總體經濟、市場或商業狀況。投資者請注意,任何此類陳述都不能保證未來的業績,實際結果或發展可能與前瞻性陳述中的預測存在重大差異。前瞻性陳述基於公司管理層在聲明發表之日的信念、估計和觀點。除非適用的證券法要求,否則如果管理層的信念、估計或觀點或其他因素髮生變化,公司沒有義務更新這些前瞻性陳述。

SOURCE: Blue Lagoon Resources Inc.

來源: 藍湖資源公司


View source version on accesswire.com:
在 accesswire.com 上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論