share_log

Golden Lake Reports Phase 2 Drill Results; Intercepts 3.31 G/T Gold and 209.5 G/T Silver Over 3.96 Metres From the Hamburg Mine Zone, Jewel Ridge Project, Nevada

Golden Lake Reports Phase 2 Drill Results; Intercepts 3.31 G/T Gold and 209.5 G/T Silver Over 3.96 Metres From the Hamburg Mine Zone, Jewel Ridge Project, Nevada

Golden Lake報告第二階段鑽探結果;在內華達州寶石嶺項目漢堡礦區3.96米處截獲3.31克/噸黃金和209.5克/噸白銀
Accesswire ·  2022/09/09 20:05

VANCOUVER, BC / ACCESSWIRE / September 9, 2022 / Golden Lake Exploration Inc. (CSE:GLM) ("GLM" or the "Company") (OTCQB:GOLXF) is pleased to report remaining assay results from its Phase 2 diamond drill program, on the Company's keystone Jewel Ridge Property ("Property"), located in the prolific Eureka gold district, Nevada (Table 1). The Jewel Ridge property is located along strike and contiguous to I-80 Gold Corp.'s Archimedes/Ruby Hill gold mine to the north, Paycore Minerals Inc.'s FAD property to the northwest, and Timberline Resources' advanced-stage Lookout Mountain project to the south1. Drilling comprised 9 holes (1,513.3 metres) on the Hamburg Zone at the south end of the Property, and the initial drilling on the Catlin Zone comprised of 2 holes (398.9 metres) (Table 2). As previously reported the Hamburg Zone returned a significant intercept of 26.37 metres averaging 5.38 grams gold per tonne (g/t Au) from a shallow depth of 42.64 metre in hole JR-22-36DD (press release March 23, 2022).

温哥華,卑詩省/ACCESSWIRE/2022年9月9日/ 金湖勘探公司(CSE:GLM)(“GLM”或“公司”)(場外市場代碼:GOLXF)很高興報告其鑽石鑽探計劃第二階段對公司位於內華達州多產的尤里卡金礦區的Keystone Jewel Ridge物業(“物業”)的剩餘化驗結果(表1)。珠光嶺地產位於Strike沿線,北部毗鄰I-80 Gold Corp.的阿基米德/魯比山金礦,西北部是Paycore Minerals Inc.的FAD地產,南部是Timberline Resources的高級瞭望山項目1。在該地產南端的漢堡地區,鑽探包括9個孔(1,513.3米),在Catlin區的初始鑽探包括2個孔(398.9米)(表2)。正如之前報道的那樣,漢堡地區已經返回在JR-22-36DD孔42.64米的淺部截獲26.37米的平均每噸5.38克黃金(2022年3月23日新聞稿)。

A total of 11 holes (1.912.3 metres) are reported in this press release, including holes JR-22-39DD to JR-22-50 DD (note JR-22-43DD was lost) (Tables 1 and 2). Highlights of the drill program include:

本新聞稿共報告了11個洞(1.912.3米),包括JR-22-39DD到JR-22-50DD(注JR-22-43DD已丟失)(表1和表2)。演練計劃的亮點包括:

  • Highest grade intercept was returned in hole JR-22-50DD on the Hamburg Zone from a depth of 132.28 metres, returning 3.31 g/t Au, and 209.5 g/t Ag with 1.55 percent(%) lead (Pb) and .70 % zinc (Zn) over a core width of 3.96 metres.
  • The most significant intersection (based on core width times gold grade) was returned in hole JR-22-40DD, on the Hamburg Zone, averaging 41.15 metres over a core width of 1.05 g/t Au and 3.9 g/t Ag, from a depth of 128.63 metres,
  • Only two holes were drilled on the Catlin Zone, and both returned higher silver values associated with Carbonate Replacement Deposit ("CRD") mineralization. Hole JR-22-45DD returned 0.17 g/t Au and 308.6 g/t Ag over 4.05 metres from a depth of 62.09 metres, and hole JR-22-46DD returned 5.23 g/t Au and 84.0 g/t Ag over 1.52 metres from a depth of 9.75 metres. Additional drilling is required to determine the extent and orientation of CRD mineralization at the Catlin Zone.
  • The Hamburg target is approximately 1.8 kilometres south-southeast of the Eureka Tunnel target, where the Company was actively exploring throughout most of 2021. At the Hamburg Mine, historic gold production from the underground and open pit workings, and previous exploration activities had focused on oxide gold mineralization in the Hamburg Dolomite unit, and/or at the contact of the Hamburg Dolomite with the Dunderberg Shale.
  • 在漢堡地區的JR-22-50DD孔,從132.28米的深度返回了最高等級的攔截,返回3.31g/t Au和209.5 g/t Ag在3.96米的巖芯寬度上含有1.55%(%)的鉛(鉛)和0.70%的鋅(鋅).
  • 最重要的交叉點(基於巖心寬度乘以金品位)是在漢堡地區的JR-22-40DD孔中返回的,平均41.15米,巖心寬度為1.05g/t Au和3.9g/t Ag,從128.63米深的地方,
  • 在Catlin區只鑽了兩個洞,兩個洞都與碳酸鹽置換礦牀(“CRD”)礦化有關,併產生了較高的銀價。JR-22-45dd孔從62.09m的深度在4.05m內返回0.17g/t Au和308.6 g/t Ag,JR-22-46DD孔從9.75m的深度在1.52m內返回5.23g/t Au和84.0g/t Ag。需要額外鑽探,以確定卡特林地區CRD礦化的範圍和方向。
  • 漢堡目標位於尤里卡隧道目標東南偏南約1.8公里處,公司在2021年的大部分時間裏一直在那裏積極勘探。在漢堡礦,地下和露天開採的歷史黃金產量以及以前的勘探活動都集中在漢堡白雲巖單元和/或漢堡白雲巖與Dunderberg頁巖接觸處的氧化金礦化。

1The mines and exploration projects in the Eureka District provide geologic context for the Jewel Ridge Property, but this is not necessarily an indication that the Project hosts similar grades or tonnages of mineralization.

1尤里卡區的礦山和勘探項目為寶石嶺提供了地質背景,但這並不一定表明該項目擁有類似的礦化等級或噸位。

TABLE 1: DRILL RESULTS

表1:鑽取結果

HOLE

ZONE

FROM

TO

LENGTH

GOLD

SILVER

LEAD

ZINC

INTERVAL

ID

NAME

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

COMMENTS

JR-22-39DD

Hamburg

5.18

15.85

10.67

0.36

3.7

0.21

0.37

CRD-Hamburg Dolomite

15.85

29.57

13.72

0.76

5.6

0.32

0.47

CRD-Hamburg Dolomite

37.19

43.37

6.19

0.42

6.3

0.09

2.28

CRD-Hamburg Dolomite

65.65

87.48

21.82

0.15

2.9

N/A

N/A

Carlin-Hamburg Dolomite

159.41

168.25

8.84

0.16

1.3

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-40DD

Hamburg

73.76

80.80

7.04

0.30

2.4

N/A

N/A

Carlin-Hamburg Dolomite

107.41

117.96

10.55

0.77

1.6

N/A

N/A

Carlin-Hamburg Dolomite

127.10

146.91

19.81

0.41

2.0

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-41DD

Hamburg

128.63

169.77

41.15

1.05

3.9

N/A

N/A

Carlin-Hamburg Dolomite
including

136.25

142.34

6.10

4.35

6.6

N/A

N/A

Carlin-Hamburg Dolomite

186.54

198.73

12.19

0.17

0.9

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-42DD

Hamburg

66.14

90.53

24.38

1.35

2.9

N/A

N/A

Carlin-Hamburg Dolomite
including

70.71

74.52

3.81

6.58

12.6

N/A

N/A

Carlin-Hamburg Dolomite

99.67

108.14

8.47

0.27

0.8

N/A

N/A

Carlin-Hamburg Dolomite

111.86

117.96

6.10

0.14

3.4

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-44DD

Hamburg

46.33

58.52

12.19

0.25

1.9

N/A

N/A

Carlin-Hamburg Dolomite

87.48

96.62

9.14

0.20

1.3

N/A

N/A

Carlin-Hamburg Dolomite

125.58

131.67

6.10

0.30

1.4

N/A

N/A

Carlin-Hamburg Dolomite

143.87

163.68

19.81

0.17

0.3

N/A

N/A

Carlin-Hamburg Dolomite

JR-22-45DD

CATLIN

62.09

66.14

4.05

0.17

308.6

N/A

N/A

CRD

152.67

169.77

17.10

0.33

6.6

N/A

N/A

CRD

JR-22-46DD

CATLIN

2.13

6.71

4.57

0.39

31.5

0.63

1.25

CRD

9.75

11.28

1.52

5.23

84.0

1.39

0.9

CRD

JR-22-47DD

Hamburg

89.00

114.91

25.91

0.23

1.3

N/A

N/A

Carlin-Hamburg Dolomite
including

107.29

108.69

1.40

1.61

3.4

N/A

N/A

Carlin-Hamburg Dolomite

148.44

161.24

12.80

0.42

6.1

N/A

N/A

Carlin-Hamburg Dolomite
including

157.58

160.63

3.05

0.93

1.6

N/A

N/A

Carlin-Hamburg Dolomite
JR-22-48DD Hamburg

101.19

113.39

12.19

0.14

1.8

N/A

N/A

Carlin-Hamburg Dolomite
JR-22-49DD Hamburg

0.00

3.66

3.66

5.54

44.1

2.44

0.93

Dump

JR-22-50DD

Hamburg

104.24

113.39

9.14

0.25

1.4

N/A

N/A

Carlin-Hamburg Dolomite

121.01

137.77

16.76

1.12

54.3

0.48

0.40

CRD-Hamburg Dolomite
including

132.28

136.25

3.96

3.31

209.5

1.55

0.70

CRD-Hamburg Dolomite

孔洞

分帶

從…

長度

黃金

白銀

間隔

ID號

名字

(m)

(m)

(m)

(克/噸)

(克/噸)

(%)

(%)

評論

JR-22-39DD

漢堡

5.18

15.85

10.67

0.36

3.7

0.21

0.37

CRD-漢堡白雲巖

15.85

29.57

13.72

0.76

5.6

0.32

0.47

CRD-漢堡白雲巖

37.19

43.37

6.19

0.42

6.3

0.09

2.28

CRD-漢堡白雲巖

65.65

87.48

21.82

0.15

2.9

不適用

不適用

卡林-漢堡白雲巖

159.41

168.25

8.84

0.16

1.3

不適用

不適用

卡林-漢堡白雲巖

JR-22-40DD

漢堡

73.76

80.80

7.04

0.30

2.4

不適用

不適用

卡林-漢堡白雲巖

107.41

117.96

10.55

0.77

1.6

不適用

不適用

卡林-漢堡白雲巖

127.10

146.91

19.81

0.41

2.0

不適用

不適用

卡林-漢堡白雲巖

JR-22-41dd

漢堡

128.63

169.77

41.15

1.05

3.9

不適用

不適用

卡林-漢堡白雲巖
包括

136.25

142.34

6.10

4.35

6.6

不適用

不適用

卡林-漢堡白雲巖

186.54

198.73

12.19

0.17

0.9

不適用

不適用

卡林-漢堡白雲巖

JR-22-42DD

漢堡

66.14

90.53

24.38

1.35

2.9

不適用

不適用

卡林-漢堡白雲巖
包括

70.71

74.52

3.81

6.58

12.6

不適用

不適用

卡林-漢堡白雲巖

99.67

108.14

8.47

0.27

0.8

不適用

不適用

卡林-漢堡白雲巖

111.86

117.96

6.10

0.14

3.4

不適用

不適用

卡林-漢堡白雲巖

JR-22-44DD

漢堡

46.33

58.52

12.19

0.25

1.9

不適用

不適用

卡林-漢堡白雲巖

87.48

96.62

9.14

0.20

1.3

不適用

不適用

卡林-漢堡白雲巖

125.58

131.67

6.10

0.30

1.4

不適用

不適用

卡林-漢堡白雲巖

143.87

163.68

19.81

0.17

0.3

不適用

不適用

卡林-漢堡白雲巖

JR-22-45dd

貓眼

62.09

66.14

4.05

0.17

308.6

不適用

不適用

CRD

152.67

169.77

17.10

0.33

6.6

不適用

不適用

CRD

JR-22-46DD

貓眼

2.13

6.71

4.57

0.39

31.5

0.63

1.25

CRD

9.75

11.28

1.52

5.23

84.0

1.39

0.9

CRD

JR-22-47DD

漢堡

89.00

114.91

25.91

0.23

1.3

不適用

不適用

卡林-漢堡白雲巖
包括

107.29

108.69

1.40

1.61

3.4

不適用

不適用

卡林-漢堡白雲巖

148.44

161.24

12.80

0.42

6.1

不適用

不適用

卡林-漢堡白雲巖
包括

157.58

160.63

3.05

0.93

1.6

不適用

不適用

卡林-漢堡白雲巖
JR-22-48dd 漢堡

101.19

113.39

12.19

0.14

1.8

不適用

不適用

卡林-漢堡白雲巖
JR-22-49DD 漢堡

0.00

3.66

3.66

5.54

44.1

2.44

0.93

轉儲

JR-22-50DD

漢堡

104.24

113.39

9.14

0.25

1.4

不適用

不適用

卡林-漢堡白雲巖

121.01

137.77

16.76

1.12

54.3

0.48

0.40

CRD-漢堡白雲巖
包括

132.28

136.25

3.96

3.31

209.5

1.55

0.70

CRD-漢堡白雲巖

Drilling has stopped on the Jewel Ridge project while the Company awaits the approval of the comprehensive Plan of Operation (PoO) over most of the Jewel Ridge property. EM Strategies, based in Reno, Nev., has led the preparation and submission to the Bureau of Land Management (BLM) for the PoO process. The Jewel Ridge PoO represents a significant stage and asset for the company, as the baseline studies completed (biological, hydrological, and archeological) will be essential for any future development of a gold deposit on the property. The PoO over the property, and the larger disturbance allowance, will give the company more flexibility in planning and permitting future drill sites.

寶石嶺項目的鑽探已經停止,而公司正在等待綜合項目的批准運營計劃(POO)覆蓋了珠光嶺的大部分財產。總部設在內華達州里諾的EM Strategy牽頭準備並提交給土地管理局(BLM)進行POO進程。寶石嶺糞便對該公司來説是一個重要的階段和資產,因為完成的基線研究(生物、水文和考古)將對該礦區未來的金礦開發至關重要。物業上方的排泄物,以及更大的幹擾免税額,將使該公司在規劃和批准未來的鑽探地點時擁有更大的靈活性。

The Company has recently completed a ground gravity survey over the entire Jewel Ridge property. The survey was contracted to MaGee Geophysical Services and the results are currently being reviewed by Golden Lake geologists.

該公司最近完成了對整個珍珠嶺物業的地面重力測量。這項調查與Magee地球物理服務公司簽訂了合同,目前金湖地質學家正在審查調查結果。

Drilling Quality assurance and quality control statement

鑽井質量保證和質量控制聲明

The HQ- and PQ-sized drill core reported in this news release was logged and prepared at the Golden Lake Exploration core facility in Eureka, Nevada, where it was cut, bagged and prepared for analysis before submittal Paragon Geochemical Laboratories Inc., Nevada, USA. Core rock samples were analyzed using a multi-element analysis with ICP-MS analytical package ("50AR-MS"; aqua regia digestion). Over limit sample values were re-assayed for: (1) values of copper >1%; (2) values of zinc >1%; (3) values of lead >1%; and (4) values of silver >100 g/t using the high-grade material ICP-OES analytical package ("OLAR-OES"). Gold and Silver fire assays established gold and silver grades using 30 gram samples ("Au-AA30; Ag-AA30) with overlimit gold (5 ppm) and silver (100 ppm) fire assays by gravimetric finish (Au-GRAV; Ag-GRAV). Certified standards, blanks, and duplicates were inserted into the sample shipment to ensure integrity of the assay process. Selected samples were chosen for duplicate assay from the coarse reject and pulps of the original sample. No QA/QC issues were noted with the results reported.

本新聞稿中報道的總部和PQ大小的鑽芯是在內華達州尤里卡的金湖勘探核心設施記錄和準備的,在那裏它被切割、打包並準備分析,提交給美國內華達州帕拉貢地球化學實驗室公司。使用多元素分析和電感耦合等離子體質譜分析包(“50AR-MS”;王水消化)對巖心樣品進行分析。使用高級材料電感耦合等離子體發射光譜分析軟件(“OLAR-OES”)重新測定超限樣本值:(1)銅值>1%;(2)鋅值>1%;(3)鉛值>1%;(4)銀值>100 g/t。金銀火試金法使用30克樣品(“Au-AA30;Ag-AA30)和超限金(5 Ppm)和銀(100 Ppm)火試金法(Au-Grav;Ag-Grav)確定了金和銀的等級。為確保分析過程的完整性,在樣品裝運中插入了認證標準、空白和複製品。從原始樣品的粗廢料和紙漿中選擇重複分析的樣品。報告的結果中沒有發現QA/QC問題。

TABLE 2: DRILL HOLE COLLAR INFORMATION

表2:鑽孔卡箍信息

Hole

Easting

Northing

Elevation

Depth

Azimuth

Inclination

ID

(Metres)

(Metres)

(Metres)

(Metres)

(Degrees)

(Degrees)

JR-22-39DD

587958

4368793

2343

203.30

-50

180

JR-22-40DD

588031

4368725

2370

156.06

-50

214

JR-22-41DD

588014

4368737

2368

213.97

-65

220

JR-22-42DD

588027

4368727

2369

183.49

-50

263

JR-22-43DD

587968

4368800

2343

29.57

-70

210

JR-22-44DD

587966

4368797

2343

183.49

-70

210

JR-22-45DD

587825

4369537

2291

215.49

-50

320

JR-22-46DD

587823

4369540

2291

183.49

-50

272

JR-22-47DD

588000

4368313

2391

178.00

-50

65

JR-22-48DD

587997

4368381

2382

183.49

-50

65

JR-22-49DD

588086

4368640

2350

40.23

-50

246

JR-22-50DD

588083

4368574

2367

171.30

-50

245

孔洞

向東

北距

高程

水深

方位角

傾角

ID號

(米)

(米)

(米)

(米)

(度)

(度)

JR-22-39DD

587958

4368793

2343

203.30

-50

180

JR-22-40DD

588031

4368725

2370

156.06

-50

214

JR-22-41dd

588014

4368737

2368

213.97

-65

220

JR-22-42DD

588027

4368727

2369

183.49

-50

263

JR-22-43DD

587968

4368800

2343

29.57

-70

210

JR-22-44DD

587966

4368797

2343

183.49

-70

210

JR-22-45dd

587825

4369537

2291

215.49

-50

320

JR-22-46DD

587823

4369540

2291

183.49

-50

272

JR-22-47DD

588000

4368313

2391

178.00

-50

65

JR-22-48dd

587997

4368381

2382

183.49

-50

65

JR-22-49DD

588086

4368640

2350

40.23

-50

246

JR-22-50DD

588083

4368574

2367

171.30

-50

245

About the Jewel Ridge Property

關於珠光嶺地產

The Jewel Ridge property is located on the south end of Nevada's prolific Battle Mountain - Eureka trend, along strike and contiguous to I-80 Gold Corp.'s Archimedes/Ruby Hill gold mine to the north and Timberline Resources' advanced-stage Lookout Mountain project to the south. The mines and exploration and development projects in the Battle Mountain-Eureka Trend provide geologic context for the Jewel Ridge Property, but this is not necessarily indicative that the Project host similar grades or tonnages of mineralization.

珠光嶺金礦位於內華達州多產的巴特爾山-尤里卡趨勢的南端,沿着Strike路線,北鄰I-80 Gold Corp.的阿基米德/紅寶石山金礦,南鄰Timberline Resources的高級瞭望山項目。Battle Mountain-Eureka Trend的礦山和勘探開發項目為寶石嶺礦產提供了地質背景,但這並不一定表明該項目擁有類似的礦化等級或噸位。

The property comprises 96 unpatented lode mining claims and 30 patented claims covering approximately 728 hectares (1,800 acres). The Jewel Ridge property contains several historic small gold mines. The Company's focus is on Carlin-style disseminated gold deposits, the primary focus in the area since the late 1970s.

該財產包括96項非專利礦脈開採權利和30項專利權利要求,佔地約728公頃(1800英畝)。珍珠嶺地產中有幾座歷史悠久的小型金礦。該公司的重點是卡林式浸染型金礦,這是自20世紀70年代末以來該地區的主要重點。

Qualified person

有資格的人

Golden Lake Exploration's disclosure of a technical or scientific nature in this news release has been reviewed and approved by Daniel MacNeil, P.Geo., who serves as a qualified person under the definition of National Instrument 43-101.

金湖勘探在本新聞稿中披露的技術或科學性質,已由國家儀器43-101定義下的合格人員Daniel麥克尼爾進行審查和批准。

About Golden Lake Exploration Inc.

關於金湖勘探公司

Golden Lake Exploration is a junior public mining exploration company engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to acquire, explore and develop economic precious and base metal properties of merit and to aggressively advance its exploration program on the Jewel Ridge property. The Jewel Ridge property is located on the south end of Nevada's prolific Battle Mountain-Eureka trend, along strike and contiguous to Barrick Gold's Archimedes/Ruby Hill gold mine to the north and Timberline Resources' advanced-stage Lookout Mountain project to the south. The Company also owns a large (37.814 hectare) early-stage property in south-central British Columbia, contiguous to Kodiak Copper Corp., and Gold Mountain Mining Inc., that is highly prospective for copper-gold porphyry and mesothermal gold-bearing quartz-vein mineralization.

金湖勘探是一家從事礦產勘查和礦業權資產收購業務的初級上市礦業勘探公司。其目標是獲得、勘探和開發有價值的經濟貴金屬和賤金屬礦產,並積極推進其在寶石嶺礦產的勘探計劃。珠光嶺金礦位於內華達州多產的巴特爾山-尤里卡趨勢的南端,沿着Strike,北與Barrick Gold的阿基米德/紅寶石山金礦相連,南至Timberline Resources的高級瞭望山項目。該公司還在不列顛哥倫比亞省中南部擁有一處大型(37.814公頃)早期地產,毗鄰科迪亞克銅業公司和Gold Mountain礦業公司,具有很高的銅金斑巖和中熱液含金石英脈礦化前景。

ON BEHALF OF THE BOARD

我代表董事會

"Mike England"
Mike England, CEO & DIRECTOR

《Mike英格蘭》
董事英國首席執行官Mike

FOR FURTHER INFORMATION PLEASE CONTACT:
Telephone: 1-604-683-3995
TollFree:1-888-945-4770

欲瞭解更多信息,請聯繫:
電話:1-604-683-3995
免費電話:1-888-945-4770

Neither the Canadian Stock Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

加拿大證券交易所及其監管服務提供商均不對本新聞稿的充分性或準確性承擔責任。

FORWARD LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Investors are cautioned that these forward looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected. These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances. All of the forward-looking statements made in this press release are qualified by these cautionary statements and by those made in our filings with SEDAR in Canada (available at WWW.SEDAR.COM).

前瞻性陳述:本新聞稿包含前瞻性陳述,與未來事件或未來業績有關,反映管理層目前的預期和假設。這些前瞻性陳述反映了管理層目前的信念,是基於公司所做的假設和目前可獲得的信息。請投資者注意,這些前瞻性陳述既不是承諾,也不是保證,可能會受到風險和不確定因素的影響,這些風險和不確定因素可能會導致未來的結果與預期的大不相同。這些前瞻性陳述是自本新聞稿發佈之日起作出的,除非適用的證券法規另有要求,否則公司不承擔任何更新或修訂這些陳述以反映新事件或新情況的義務。本新聞稿中的所有前瞻性陳述都受到這些警告性聲明以及我們提交給加拿大SEDAR的文件中的警告性聲明的限制(可在WWW.SEDAR.COM).

SOURCE: Golden Lake Exploration Inc.

資料來源:金湖勘探公司。


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論