share_log

Revival Gold Releases Final 2021 Drill Results at Haidee

Revival Gold Releases Final 2021 Drill Results at Haidee

复兴黄金公司在海迪发布2021年最终钻探结果
GlobeNewswire ·  2022/02/08 20:37

Figure 1

图1

Haidee Target Area 2020-2021 Drill Program Results
海德目标区2020-2021年演练计划结果

Figure 2

图2

Haidee Target Area – Section View
海迪目标区-横断面图

TORONTO, Feb. 08, 2022 (GLOBE NEWSWIRE) -- Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) ("Revival Gold" or the "Company"), is pleased to announce results from the final seven infill drill holes completed in the Haidee target area in connection with the Company's 2021 exploration program at the Beartrack-Arnett Gold Project ("Beartrack-Arnett") located in Idaho, USA.  

多伦多,2022年2月8日(环球通讯社)Revival Gold Inc.(多伦多证券交易所股票代码:RVG,OTCQX:RVLGF)复兴黄金公司(“Revival Gold”或“公司”)很高兴宣布在海迪目标区完成的最后七个加密钻孔的结果,该钻孔与公司位于美国爱达荷州的BearTrack-Arnett黄金项目(“BearTrack-Arnett”)的2021年勘探计划有关。

Each of the seven holes reported below encountered above cut-off grade, near-surface oxidized gold mineralization. Highlights include:

下面报告的七个洞中的每一个都遇到了边界品位以上的近地表氧化金矿化。亮点包括:

  • 0.92 g/t gold over 16.2 meters in AC21-075D
  • 0.75 g/t gold over 44.1 meters in AC21-084D
  • 0.92 g/t gold over 14.8 meters in AC21-081D
  • 0.57 g/t gold over 12.2 meters and 0.51 g/t gold over 22.2 meters in AC21-077D
  • 0.42 g/t gold over 25.7 meters and 0.48 g/t gold over 27.4 meters in AC21-083D
  • 16.2米以上0.92克/吨黄金在AC21-075D中
  • 44.1米以上0.75克/吨黄金在AC21-084D中
  • 14.8米以上0.92克/吨黄金在AC21-081D中
  • 12.2米以上0.57克/吨黄金22.2米以上为0.51克/吨黄金在AC21-077D中
  • 黄金0.42克/吨,超过25.7米27.4米以上0.48克/吨黄金在AC21-083D中

1 True width is estimated to be greater than 70% of drilled width. 

1真实宽度估计大于钻井宽度的70%。

The 2021 drilling program at Haidee was designed to upgrade and expand the deposit's current Inferred heap leachable mineral resources. In addition, the program included holes drilled to obtain engineering data for Revival Gold's planned late-2022 Pre-Feasibility Study.

海德2021年的钻探计划旨在升级和扩大矿藏目前的推断堆可浸出矿产资源。此外,该计划还包括为复兴黄金公司计划于2022年底进行的前期可行性研究而钻出的孔,以获得工程数据。

A total of 15 holes were completed for approximately 2,500 meters, with four holes drilled for geotechnical and hydrological purposes.  Results are consistent with results from previous drilling and continue to support the up-dip and down-dip extensions of mineralization in the Haidee area as areas for the potential expansion of the current Mineral Resources.

总共完成了15个孔,长约2500米,其中4个孔用于岩土和水文目的。结果与先前钻探的结果一致,并继续支持海德地区矿化的向上和向下延伸,作为当前矿产资源的潜在扩张区。

"Drill results released today will support an upgrade in the quality of the gold resource at Haidee and point to future resource expansion opportunities both up and down dip of the current deposit", said Hugh Agro, President and CEO. "An updated resource estimate for the entire Beartrack-Arnett project is well underway and results are expected to be released by quarter end", added Agro.      

总裁兼首席执行官休·阿格罗(Hugh Agro)表示:“今天公布的钻探结果将支持海迪黄金资源质量的提升,并指出当前矿藏上下倾斜的未来资源扩张机会。”Agro补充说:“整个BearTrack-Arnett项目的最新资源估计正在顺利进行,预计结果将在季度末公布。”

Detailed results for drill holes released today are presented in the table below:

今天公布的钻孔结果详见下表:

Hole Number Area Azimuth
(deg.)
Dip
(deg.)
From
(m)
To
(m)
Drilled
Width1
(m)
Fire Assay
Gold Grade
(g/t)
AC21-075D2, 3 Haidee 325 -82 71.2 77.7 6.6 0.20
        112.5 128.6 16.2 0.92
Incl.       113.8 115.3 1.5 3.63
AC21-077D2, 4 Haidee 80 -82 3.7 15.8 12.2 0.41
        41.0 52.5 11.5 0.40
        106.6 118.7 12.2 0.57
        127.1 149.3 22.2 0.51
        171.3 190.5 19.2 0.41
AC21-080D2, 5 Haidee 236 -84 20.7 26.2 5.5 0.25
AC21-081D6 Haidee 68 -56 17.7 25.3 7.6 0.29
        49.7 55.0 5.4 0.45
        81.9 96.7 14.8 0.92
Incl.       81.9 87.8 5.9 2.02
        135.8 138.3 2.5 1.29
AC21-082D2, 7 Haidee 181 -88 14.2 15.7 1.5 1.33
        71.6 75.0 3.4 1.15
        93.6 95.1 1.5 2.23
AC21-083D8 Haidee 28 -59 13.4 20.9 7.5 0.32
        89.4 97.5 8.1 0.72
Incl.       96.0 97.5 1.5 3.10
        102.4 108.5 6.1 0.69
        121.2 146.9 25.7 0.42
        168.9 196.3 27.4 0.48
Incl.       191.7 193.2 1.5 3.92
AC21-084D9 Haidee 65 -75 12.1 29.9 17.8 0.75
Incl.       12.1 13.3 1.2 6.38
        38.1 45.9 7.8 0.74
        94.1 138.3 44.1 0.75
Incl.       109.4 116.1 6.7 2.28
Incl.       109.4 110.7 1.3 6.39
孔数 面积 方位角
(度)
浸出
(度)
从…
(m)

(m)
钻透
宽度1
(m)
火灾检测
黄金等级
(克/吨)
AC21-075D2, 3 海迪 325 -82 71.2 77.7 6.6 0.20
112.5 128.6 16.2 0.92
包括 113.8 115.3 1.5 3.63
AC21-077D2, 4 海迪 80 -82 3.7 15.8 12.2 0.41
41.0 52.5 11.5 0.40
106.6 118.7 12.2 0.57
127.1 149.3 22.2 0.51
171.3 190.5 19.2 0.41
AC21-080D2, 5 海迪 236 -84 20.7 26.2 5.5 0.25
AC21-081D6 海迪 68 -56 17.7 25.3 7.6 0.29
49.7 55.0 5.4 0.45
81.9 96.7 14.8 0.92
包括 81.9 87.8 5.9 2.02
135.8 138.3 2.5 1.29
AC21-082D2, 7 海迪 181 -88 14.2 15.7 1.5 1.33
71.6 75.0 3.4 1.15
93.6 95.1 1.5 2.23
AC21-083D8 海迪 28 -59 13.4 20.9 7.5 0.32
89.4 97.5 8.1 0.72
包括 96.0 97.5 1.5 3.10
102.4 108.5 6.1 0.69
121.2 146.9 25.7 0.42
168.9 196.3 27.4 0.48
包括 191.7 193.2 1.5 3.92
AC21-084D9 海迪 65 -75 12.1 29.9 17.8 0.75
包括 12.1 13.3 1.2 6.38
38.1 45.9 7.8 0.74
94.1 138.3 44.1 0.75
包括 109.4 116.1 6.7 2.28
包括 109.4 110.7 1.3 6.39

1 True width is estimated to be greater than 70% of drilled width.  Numbers may not add up due to rounding.
2 Geotechnical drillhole.
3 The interval 111.7 – 111.9 m was removed for a geotechnical sample.  This interval was included in the grade and thickness calculation at 0 g/t gold.
4 The intervals 14.3 – 14.7 m and 45.2 – 45.5 m were removed for geotechnical samples.  These intervals were included in the grade and thickness calculation at 0 g/t gold.  Recovery for the interval 128.6 – 130.1 m was 42%.
5 Recovery for the interval 20.7 m to 23.5 m was 30%.  The intervals 23.2 – 23.5 m and 24.9 – 25.2 m were removed for geotechnical samples.  These intervals were included in the grade and thickness calculation at 0 g/t gold. 
6 Recoveries for the intervals 53.0 – 55.0 m and 82.2 – 83.2 m were 48% and 47% respectively.
7 Recovery for the interval 73.2 – 74.2 m was 48%.
8 Recoveries for the intervals 18.5 - 19.3 m and 90.0 – 92.5 m were 32% and 50% respectively.
9 Recovery for the interval 106.6 – 108.0 m was 24%.

1真实宽度估计大于钻井宽度的70%。由于四舍五入,数字可能不会相加。
2岩土钻孔。
3对于岩土样品,去掉了111.7-111.9米的间隔。这一区间包括在0g/t黄金的品位和厚度计算中。
4对于岩土样品,去除了14.3~14.7m和45.2~45.5m的间隔。这些间隔包括在0g/t黄金的品位和厚度计算中。128.6~130.1米段的采收率为42%。
520.7m~23.5m的采收率为30%。对于岩土样品,去掉了间隔23.2~23.5m和24.9~25.2m。这些间隔包括在0g/t黄金的品位和厚度计算中。
653.0~55.0m和82.2~83.2m的回收率分别为48%和47%。
773.2~74.2m时间段的回收率为48%。
818.5~19.3m和90.0~92.5m的回收率分别为32%和50%。
9106.6~108.0米的采收率为24%。

Figure 1 below is a plan view of the Haidee target area showing collar locations and intercepts for all holes drilled in 2020 and 2021. Figure 2 is a section view looking north through the Haidee deposit.

下面的图1是海迪目标区的平面图,显示了2020年和2021年钻探的所有孔的钻领位置和截留量。图2是通过海迪矿藏向北俯瞰的剖面图。

Figure 1: Haidee Target Area 2020-2021 Drill Program Results

图1:海德目标区2020-2021年演练计划结果

Figure 2: Haidee Target Area – Section View

图2:海迪目标区域-横断面图

QA/QC Program

QA/QC计划

Quality Assurance/Quality Control consists of the regular insertion of certified reference materials, duplicate samples and blanks into the sample stream.  Check samples are submitted to an umpire laboratory at the end of the drilling program.  Sample results are analyzed immediately upon receipt and all discrepancies are investigated.  Samples are submitted to the ALS Geochemistry sample preparation facility in Twin Falls, Idaho.  Gold analyses are performed at the ALS Geochemistry laboratory in Reno, Nevada or Vancouver, British Columbia, and multi-element geochemical analyses are completed at the ALS Minerals laboratory in Vancouver, British Columbia.  ALS Minerals is an ISO/IEC 17025:2017 accredited lab.

质量保证/质量控制包括定期向样品流中插入经过认证的标准物质、重复样品和空白。检查样本在钻井程序结束时提交给裁判实验室。样品结果在收到后立即进行分析,并对所有差异进行调查。样品被提交给爱达荷州双子瀑布的ALS地球化学样品制备设施。金分析在内华达州里诺或不列颠哥伦比亚省温哥华的ALS地球化学实验室进行,多元素地球化学分析在不列颠哥伦比亚省温哥华的ALS Minerals实验室完成。ALS Minerals是国际标准化组织/国际电工委员会17025:2017年认证的实验室。

Gold assays are determined on samples consisting of half drill core by Fire Assay and AAS on a 30-gram nominal sample weight (Au-AA23) for Beartrack, and Fire Assay and AAS on a 50-gram nominal sample weight (Au-AA24) for Arnett.  For shallow holes targeting leachable mineralization, gold is also determined by cyanide leach with an AAS finish on a nominal 30-gram sample weight (Au-AA13).  Multi element geochemical analyses are completed on selected drill holes using the ME-MS 61M method. 

对于BearTrack,金分析是通过火焰分析和原子吸收光谱分析(AAS)在30克标称样品重量(Au-aa23)上进行的;对于Arnett,金分析和原子吸收光谱分析是在50克标称样品重量(Au-AA24)上进行的。对于以可浸出矿化为目标的浅孔,金也是通过氰化浸出并以标称30克样品重量(Au-AA13)进行原子吸收光洁度测定的。用ME-MS 61M方法对选定的钻孔进行多元素地球化学分析。

Qualified Person

合格人员

Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved its scientific and technical content.

Revival Gold Inc.勘探副总裁Steven T.Priesmeyer C.P.G.是本新闻稿指定的符合National Instrument 43-101矿物项目披露标准的合格人员,并已审查和批准了其科学技术含量。

About Revival Gold Inc.

关于复兴黄金公司

Revival Gold Inc. is a growth-focused gold exploration and development company. The Company is advancing the Beartrack-Arnett Gold Project located in Idaho, USA.

Revival Gold Inc.是一家专注于增长的黄金勘探和开发公司。该公司正在推进位于美国爱达荷州的BearTrack-Arnett黄金项目。

Beartrack-Arnett is the largest past-producing gold mine in Idaho. A Preliminary Economic Assessment has been completed for a first phase restart of heap leach operations to produce 72,000 ounces of gold per year over an initial seven-year mine life at an AISC of $1,057 per ounce of gold. Meanwhile, exploration continues, focused on expanding the current Indicated Mineral Resource of 36.6 million tonnes at 1.15 g/t gold containing 1.36 million ounces of gold and Inferred Mineral Resource of 47.1 million tonnes at 1.08 g/t gold containing 1.64 million ounces of gold. The mineralized trend at Beartrack extends for over five kilometers and is open on strike and at depth. Mineralization at Arnett is open in all directions.

BearTrack-Arnett是爱达荷州最大的过去生产的金矿。堆浸作业第一阶段重启的初步经济评估已完成,在最初七年的矿山寿命内每年生产72,000盎司黄金,AISC为每盎司黄金1,057美元。与此同时,勘探仍在继续,重点是扩大目前指示矿产资源量3,660万吨,含黄金1.15克/吨,含黄金136万盎司;推断矿产资源量4,710万吨,含金1.08g/吨,含金164万盎司。BearTrack的矿化趋势延伸超过5公里,在走向和深度上都是开放的。阿内特的矿化是四面八方开放的。

For further details, including key assumptions, parameters and methods used to estimate the Mineral Resources, and data verification, please see the Company's NI 43-101 compliant technical report titled, "Preliminary Economic Assessment of the Heap Leach Operation on the Beartrack Arnett Gold Project, Lemhi County, Idaho, USA – NI 43-101 Technical Report", dated December 17th, 2020.

有关更多细节,包括用于估算矿产资源量的主要假设、参数和方法,以及数据验证,请参阅该公司12月17日发布的符合NI 43-101标准的技术报告,标题为《美国爱达荷州莱米县BearTrack Arnett金矿项目堆浸作业的初步经济评估-NI 43-101技术报告》(NI 43-101 Technology Report),标题为《美国爱达荷州莱姆希县BearTrack Arnett金矿项目堆浸作业的初步经济评估--NI 43-101技术报告》, 2020.

Revival Gold has approximately 86.9 million shares outstanding and an estimated cash balance of C$10 million. Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at  or on SEDAR at .

Revival Gold拥有约8690万股流通股,估计现金余额为1000万加元。其他披露信息,包括公司的财务报表、技术报告、新闻稿和其他信息,可在SEDAR或在SEDAR上获得,网址为:。

For further information, please contact:

如需更多信息,请联系:

Hugh Agro, President & CEO or Melisa Armand, Investor Relations
Telephone: (416) 366-4100 or Email: info@revival-gold.com

休·阿格罗(Hugh Agro),投资者关系总裁兼首席执行官梅丽莎·阿曼德(Melisa Armand)
电话:(416)366-4100或电子邮件:info@revival-gold.com

Cautionary Statement

警示声明

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. Technical information in this news release has been reviewed and approved by Steven T. Priesmeyer, C.P.G., Vice President Exploration, Revival Gold Inc., Qualified Person within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

多伦多证券交易所创业板交易所及其监管服务提供商(该术语在多伦多证券交易所创业板政策中定义)均不对本新闻稿的充分性或准确性承担责任。本新闻稿中的技术信息已由Recvival Gold Inc.勘探副总裁Steven T.Priesmeyer(C.P.G.,National Instrument 43-101所指的合格人员)审核和批准。矿产项目信息披露标准.

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company, or management, expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's intentions regarding its objectives, goals or future plans and statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, the Company's ability to predict or counteract the potential impact of COVID-19 coronavirus on factors relevant to the Company's business, failure to identify additional mineral resources, failure to convert estimated mineral resources to reserves with more advanced studies, the inability to eventually complete a feasibility study which could support a production decision, the preliminary nature of metallurgical test results may not be representative of the deposit as a whole, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether because of new information, future events or otherwise, other than as required by law. 

本新闻稿包括一些不包含历史事实的“前瞻性陈述”。前瞻性陈述包括描述公司未来计划、目标或目标的估计和陈述,包括公司或管理层预计将出现的情况或结果。前瞻性陈述可以用“相信”、“预期”、“预期”、“估计”、“可能”、“将”或“计划”等术语来识别。由于前瞻性陈述基于假设,涉及未来的事件和条件,因此它们本身就包含固有的风险和不确定因素。虽然这些陈述是基于公司目前掌握的信息,但公司不能保证实际结果符合管理层的期望。前瞻性信息涉及的风险、不确定性和其他因素可能导致实际事件、结果、业绩、前景和机会与此类前瞻性信息明示或暗示的情况大不相同。本新闻稿中的前瞻性信息包括但不限于公司对其目标、目标或未来计划和声明的意图。可能导致实际结果与前瞻性信息大不相同的因素包括但不限于:公司预测或抵消新冠肺炎冠状病毒对与公司业务相关因素的潜在影响的能力、未能确定更多的矿产资源、未能通过更深入的研究将估计的矿产资源转换为储量、未能最终完成可能支持生产决策的可行性研究、冶金测试结果的初步性质可能不能代表整个矿床。, 这些风险包括:获得或未能获得所需的政府、环境或其他项目批准的延迟或失败;政治风险;与未来所需融资的可获得性和成本有关的不确定性;股票市场的变化;通货膨胀;汇率变化;大宗商品价格波动;项目开发的延迟、资本、运营和回收成本与估计相差甚远;矿产勘探和开发行业涉及的其他风险;以及公司在提交给SEDAR的公开文件中陈述的那些风险。尽管公司认为在准备本新闻稿中的前瞻性信息时使用的假设和因素是合理的,但不应过度依赖这些信息,因为这些信息仅适用于本新闻稿发布之日,并且不能保证此类事件将在披露的时间框架内发生或根本不会发生。除法律要求外,公司没有任何更新或修改任何前瞻性信息的意图或义务,无论是因为新信息、未来事件还是其他原因。


译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发