share_log

Vale SA | 6-K: Vale De-Characterizes B3/B4 Dam

Vale SA | 6-K: Vale De-Characterizes B3/B4 Dam

淡水河谷 | 6-K:淡水河谷取消B3/B4大坝的特征
美股sec公告 ·  05/14 01:39
牛牛AI助手已提取核心信息
Vale SA announced the successful completion of the de-characterization of the B3/B4 dam at the Mar Azul Mine in Nova Lima, Brazil, on May 13, 2024. The B3/B4 dam, which was classified with the highest emergency level in 2019, is now permanently free of any risk to communities and the environment. This marks the 14th dam de-characterized by Vale since the initiation of the Upstream Dam De-characterization Program in 2019. The process involved the removal of 3.3 million cubic meters of tailings using unmanned equipment operated remotely, ensuring worker safety. Vale's Executive Vice President for Projects, Alexandre Pereira, highlighted the innovative operational strategy that was essential for safety. The company will continue with land reconformation, drainage, and revegetation in the remaining area, and remove...Show More
Vale SA announced the successful completion of the de-characterization of the B3/B4 dam at the Mar Azul Mine in Nova Lima, Brazil, on May 13, 2024. The B3/B4 dam, which was classified with the highest emergency level in 2019, is now permanently free of any risk to communities and the environment. This marks the 14th dam de-characterized by Vale since the initiation of the Upstream Dam De-characterization Program in 2019. The process involved the removal of 3.3 million cubic meters of tailings using unmanned equipment operated remotely, ensuring worker safety. Vale's Executive Vice President for Projects, Alexandre Pereira, highlighted the innovative operational strategy that was essential for safety. The company will continue with land reconformation, drainage, and revegetation in the remaining area, and remove the backup dam built as a safety measure. Vale's CEO, Eduardo Bartolomeo, stated that 46% of the Decharacterization Program is complete, with US$1.7 billion disbursed, and expects to reach around 70% completion by the end of 2026. The company emphasizes its commitment to safety and transparency, with continuous independent audits and monitoring by authorities. The press release also includes a caution about forward-looking statements and potential risks and uncertainties.
淡水河谷股份公司宣布,2024年5月13日成功完成了位于巴西新利马马尔阿祖尔矿的B3/B4大坝的去特性工作。B3/B4大坝在2019年被列为最高紧急级别,现在对社区和环境永久没有任何风险。这标志着淡水河谷自2019年启动上游大坝特征解除计划以来第14座大坝取消特征的大坝。该过程涉及使用远程操作的无人设备清除330万立方米的尾矿,从而确保工人的安全。淡水河谷项目执行副总裁亚历山大·佩雷拉强调了对安全至关重要的创新运营战略。该公司将继续在剩余区域进行土地改造、排水和重新植被,并拆除作为安全措施建造的备用大坝。淡水河谷首席执行官爱德华多·巴托洛梅奥表示,去角色化计划的46%已经完成,拨款17亿美元,预计到2026年底将完成约70%。该公司强调其对安全和透明度的承诺,并由当局持续进行独立审计和监督。新闻稿还包括对前瞻性陈述以及潜在风险和不确定性的警告。
淡水河谷股份公司宣布,2024年5月13日成功完成了位于巴西新利马马尔阿祖尔矿的B3/B4大坝的去特性工作。B3/B4大坝在2019年被列为最高紧急级别,现在对社区和环境永久没有任何风险。这标志着淡水河谷自2019年启动上游大坝特征解除计划以来第14座大坝取消特征的大坝。该过程涉及使用远程操作的无人设备清除330万立方米的尾矿,从而确保工人的安全。淡水河谷项目执行副总裁亚历山大·佩雷拉强调了对安全至关重要的创新运营战略。该公司将继续在剩余区域进行土地改造、排水和重新植被,并拆除作为安全措施建造的备用大坝。淡水河谷首席执行官爱德华多·巴托洛梅奥表示,去角色化计划的46%已经完成,拨款17亿美元,预计到2026年底将完成约70%。该公司强调其对安全和透明度的承诺,并由当局持续进行独立审计和监督。新闻稿还包括对前瞻性陈述以及潜在风险和不确定性的警告。

译文内容由第三方软件翻译。


牛牛AI助手部分由第三方人工智能模型基于资讯内容自动生成,只对中国内地以外的地区提供。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。