share_log

東京電力ホールディングス:柏崎刈羽原子力発電所における原子力規制検査(核物質防護に係る追加検査)に係る結果及び対応区分の変更通知の受領について

Tokyo Electric Power: Receipt of results related to nuclear regulation inspections (additional inspections related to nuclear material protection) and notification of changes in corresponding categories at the Kashiwazaki-Kariwa Nuclear Power Plant

JPX ·  Dec 27, 2023 17:00

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.