This announcement is a separate document:
长源电力:关于延期发行国家能源集团长源电力股份有限公司2022年面向专业投资者公开发行公司债券(能源保供低碳转型挂钩债券)(第一期)的公告
Changyuan Electric Power: Notice on Deferring the Issuance of Corporate Bonds (Energy Insurance and Supply Low-Carbon Transition Linked Bonds) to Professional Investors by China Energy Group Changyuan Electric Power Co., Ltd. in 2022 (Phase I)
The translation is provided by third-party software.
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.