share_log

The second phase of the Abuja South Ring Road project, constructed by a Chinese company, has been completed.

Breakings ·  Jun 16 17:54

A completion ceremony was recently held for the Abuja South Ring Road Phase II project, constructed by China Geo-Engineering Corporation Nigeria Ltd. It is reported that the Abuja South Ring Road Phase II project is one of the highest-grade roads in Nigeria, designed as a one-way two-lane road, connecting with the previously completed Abuja North Ring Road and a section of the South Ring Road by China Geo-Engineering, which makes the traffic network system in Abuja more complete. This significantly shortens the daily commuting time for residents around the project and enhances their access to education, Medical, employment, and other social services.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment