share_log

数据中心电源概念持续活跃 中恒电气11天6板

The Concept of power supply for Datacenters remains active, Hangzhou Zhongheng Electric has increased six times in eleven days.

Breakings ·  Jan 7 09:42

Hangzhou Zhongheng Electric has increased six times in eleven days, Shijiazhuang Tonhe Electronics Technologies and Hu塑科技 have risen over 10%, Shenzhen Increase Technology, Shenzhen Honor Electronic, Shenzhen Megmeet Electrical, Beijing Dynamic Power, Shenzhen Auto Electric Power Plant, Yantai Longyuan Power Technology and others have also risen. According to a report by USA CNBC, on January 3, Microsoft announced that the company plans to invest 80 billion USD (approximately 585.6 billion RMB) in building AI Datacenters for the fiscal year 2025 (ending in June 2025).

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment