LONGi Green Energy Technology participated in several Institutions strategy meetings and online conferences this month and accepted on-site research from investment Institutions. During the discussions, the company responded to inquiries regarding domestic photovoltaic demand in 2025, demand in the European market, changes in component prices, BC Battery technology cost reduction measures, HPBC1.0 Battery production capacity operation, promotion of cooperation mode with Yingfa De Yao, overseas production capacity layout, and the shipment plans for silicon wafers and components in 2025. The company expects that the newly installed photovoltaic capacity in the domestic market will not fluctuate significantly in 2025, while new installations in the European market will remain relatively stable year-on-year, and component prices will gradually approach rational levels. In terms of cost reduction for BC Battery technology, the company will drive cost reduction through improving battery conversion efficiency, achieving scale effects, and advancing technological processes. The company plans to gradually upgrade HPBC1.0 Battery production capacity to HPBC2.0. Currently, the company has no plans to further promote the cooperation mode with Yingfa De Yao. Regarding overseas production capacity layout, the company maintains a cautious attitude. Concerning the business plan for 2025, the company stated that it will disclose more information to the public at a later time.
隆基绿能:预计2025年国内光伏新增装机不会大幅波动
LONGi Green Energy Technology: It is expected that the newly installed photovoltaic capacity in the domestic market will not fluctuate significantly in 2025.
The translation is provided by third-party software.
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.