share_log

国家能源局:2025年我国将核准开工一批条件成熟的沿海核电项目

The National Energy Administration: By 2025, a batch of mature coastal Nuclear Power projects will be approved to start construction in China.

Breakings ·  08:56

Wang Hongzhi, head of the National Energy Administration: Actively promote the construction of the second and third batches of large-scale Wind Power and photovoltaic base projects in "Shagehuang". Accelerate the development of offshore Wind Power. Actively develop distributed photovoltaics and decentralized Wind Power. By 2025, the newly added Wind Power and photovoltaic installed capacity will be around 0.2 billion kilowatts, and the consumption of Wind Power will exceed 1.1 billion tons of standard coal. In 2025, a batch of mature coastal Nuclear Power projects will be approved to start construction in China. Steadily advance the construction of ongoing Nuclear Power projects, aiming for an operational Nuclear Power installed capacity of about 65 million kilowatts by the end of 2025, ensuring the safe and stable running of operational Nuclear Power units. Additionally, the construction of a new type of Electrical Utilities system should be planned and advanced in an integrated manner. (CCTV)

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment