share_log

晋控电力:同华轩岗二期项目获核准

Jinneng holding shanxi electric power: The Tonghua Xugang Phase II project has been approved.

Breakings ·  Dec 5 18:10

Jinneng holding shanxi electric power announced that the Tonghua Xugang Phase II 2×0.66 million kilowatt project has been approved by the Shanxi Provincial Development and Reform Commission. The project is located in Xuangang Town, Yuanping City, Xinzhou, Shanxi Province, and will build two 0.66 million kilowatt ultra-supercritical, single reheat, air-cooled coal-fired generator units and auxiliary facilities, along with the construction of desulfurization and denitrification facilities. The project's designed annual coal consumption is 3.32 million tons, with a dynamic total investment of 5.079 billion yuan, of which 20% is capital funded by the company, and the remaining funds are resolved through bank loans. Currently, various preparatory works before the project commencement are being steadily promoted.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment