share_log

Stellantis集团投资超过4.06亿美元改建密歇根州三家工厂

Stellantis Group invests over 0.406 billion US dollars to renovate three factories in Michigan.

Breakings ·  Sep 11 20:45

Auto manufacturer Stellantis Group stated that it will invest over 0.406 billion US dollars in three factories in the state of Michigan, including the Sterling Heights Assembly Plant, Warren Truck Assembly Plant, and Dundee Engine Plant. Stellantis confirmed that the Sterling Heights plant will become the company's first factory in the USA to produce all-electric vehicles, the Warren Truck plant will manufacture the future electrified Jeep Wagoneer. The Dundee plant will undergo transformation to assemble, weld, and test the battery pack of the STLA platform, and to process the front and rear beams of the STLA Large, with production scheduled to begin in 2024 and 2026 respectively.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment