share_log

海化集团2024年度系统停车大修启动

Haihua Group's 2024 Annual System Parking Overhaul Begins

Breakings ·  May 21 12:27
According to Shandong Haihua Group Co., Ltd., at 8:30 on May 21, with the issuance of a carbon pressure tower order for the new line of the soda ash plant, Haihua Group's 2024 system parking overhaul began. The system parking overhaul is scheduled to be carried out from May 21 to June 4. 981 maintenance projects have been determined. The group company's public system related units, the new soda ash plant, chlor-alkali resin company, Hualong New Materials Company, baking soda factory, bromine factory, and Liwei New Materials Co., Ltd. will cooperate with the maintenance; Yangkou Salt Farm, Power Branch, Marine Engineering Company, Industrial Branch and other units will cooperate with the maintenance.

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment