Recently, Beixin Road and Bridge Group won the bid for the second section of the highway project from Gongdui Village, Chalong Township, Sagar County, Shigatse City, Tibet Autonomous Region. The bid amount was 593.383 million yuan, with a planned construction period of 20 months.
北新路桥集团中标5933.83万元公路工程项目
Beixin Road and Bridge Group won the bid for 593.383 million yuan highway engineering project
The translation is provided by third-party software.
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.