share_log

中俄东线天然气管道(河北安平-山东泰安)正式投产

Sino-Russian East Line Natural Gas Pipeline (Hebei Anping-Shandong Taian) officially put into production

Breakings ·  Sep 16, 2022 15:18
Today (September 16), the State Pipe Network Group announced that the ventilation operation of the section of the natural gas pipeline from Anping, Hebei to Tai'an, Shandong Province, marks the further improvement of the energy channel in eastern China and the continuous improvement of energy supply capacity around the Bohai Sea. The Anping-Taian section, which is completed and put into operation, is an important part of the southern section of the Sino-Russian eastern route, with a total length of 320km, a pipe diameter of 1219 mm, a design pressure of 10 MPA, a design capacity of 18.9 billion cubic meters per year, and construction will start in October 2020. (CCTV News)

The translation is provided by third-party software.


The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.
    Write a comment